Quote:
Originally Posted by jammer139
I thought someone posted on this thread that their plan was to build both towers at same time using two cranes. Which would make total logistical sense as the underground levels and podium are all one building. Might still be the plan but as of now they are only focused on the south tower foundation and have done no work on the north side of pit in months.
|
Yep, I recall the Facebook post that was referenced on page 1 of this thread. There is also a comment on that page about Bernie wanting it done in 2021 for 2022 occupancy. I remain skeptical at that lol