More pictures from the 100th floor pour party on urbantoronto.ca

A drone view looking north to glazing progress, image by UrbanToronto Forum contributor kotsy

Ground-level activity near the construction hoist, image by Craig White

Upper-deck staging, rebar cages, and concrete boom pump viewed from the top of the elevator core form, image by Craig White

South-facing view showing perimeter formwork, image by Craig White

Concrete slab pour underway on upper levels, image by Craig White

Crews guiding a crane-hoisted concrete bucket, image by Craig White
[IMG]
https://cdn.skyrisecities.com/sites/...Post-tensioned shear wall formwork and vertical rebar at the north end of the upper deck, image by Craig Whiteles/2025/11/59915/59915-191296.jpeg[/IMG]

Pinnacle International team members from across Canada joined in the celebrations, image by Craig White

Michael De Cotiis, President and CEO of Pinnacle International, waves to the crowd assembled to celebrate the milestone, image by Craig White