More pictures from the 100th floor pour party on urbantoronto.ca
A drone view looking north to glazing progress, image by UrbanToronto Forum contributor kotsy
Ground-level activity near the construction hoist, image by Craig White
Upper-deck staging, rebar cages, and concrete boom pump viewed from the top of the elevator core form, image by Craig White
South-facing view showing perimeter formwork, image by Craig White
Concrete slab pour underway on upper levels, image by Craig White
Crews guiding a crane-hoisted concrete bucket, image by Craig White
Pinnacle International team members from across Canada joined in the celebrations, image by Craig White
Michael De Cotiis, President and CEO of Pinnacle International, waves to the crowd assembled to celebrate the milestone, image by Craig White