Quote:
Originally Posted by roger1818 View Post
I said "for the developer" not from the developer.

Do you think those homes near the 174 could be considered Blight?
D'oy! I... need to get my eyebulbs checked!
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #902  
Old Posted Nov 12, 2021, 10:30 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,047
Quote:
Originally Posted by J.OT13 View Post
There's definitely some potential there. Another station half way to Tenth Line, or Tenth Line itself, could be beneficial (though Jasmin would be the logical next infill).
The engineering of this latest round of LRT For Suburbanites has pretty much removed any hope of ever seeing a station at Jasmine.

Trains are for the suburbanites. The urbans and the poors and the renters can take buses.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #903  
Old Posted Nov 12, 2021, 11:42 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Uhuniau View Post
The engineering of this latest round of LRT For Suburbanites has pretty much removed any hope of ever seeing a station at Jasmine.

Trains are for the suburbanites. The urbans and the poors and the renters can take buses.
Correction, they can take buses in the wrong direction so that they can transfer to a train.
Reply With Quote
     
     
  #904  
Old Posted Nov 13, 2021, 3:26 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,781
Quote:
Originally Posted by roger1818 View Post
Correction, they can take buses in the wrong direction so that they can transfer to a train.
If that takes you the closest station, so be it.

This is about the efficiency of transit operations, not the customer experience.
Reply With Quote
     
     
  #905  
Old Posted Nov 23, 2021, 2:58 PM
DEWLine DEWLine is offline
Registered User
 
Join Date: Oct 2010
Location: Ottawa-Gatineau
Posts: 337
One of these days, I've got to get over to the pedestrian overpass at Place d'Orléans to get a photographic sense of further progress.
Reply With Quote
     
     
  #906  
Old Posted Nov 24, 2021, 10:04 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,626
There seems to be a LOT of downtown and Kanata postings to this EAST END (Blair to Trim) thread, lately.
Reply With Quote
     
     
  #907  
Old Posted Nov 24, 2021, 10:08 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Richard Eade View Post
There seems to be a LOT of downtown and Kanata postings to this EAST END (Blair to Trim) thread, lately.
True. Maybe a mod can move some posts to a more appropriate thread.
Reply With Quote
     
     
  #908  
Old Posted Nov 25, 2021, 12:50 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,586
Quote:
Originally Posted by roger1818 View Post
True. Maybe a mod can move some posts to a more appropriate thread.
OK, I don't usually follow the LRT Extension threads too closely, but I've just relocated a couple of pages worth of posts to the "Confederation Line (Stage 1)" and "Kanata LRT EA - Bayshore to Palladium" threads. I don't guarantee to have done it to everyone's satisfaction though
Reply With Quote
     
     
  #909  
Old Posted Dec 3, 2021, 6:38 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
November Stage 2 East update. Here are a few highlights:
  • 7,000 tons of ballast has been delivered and is being installed between Montréal Station and Jeanne d’Arc Station.
  • Rail welding is complete at Montréal Station and underway at Place d’Orléans Station.
  • A small section of test track is planned to be installed in December, west of Jeanne d’Arc Station.
  • West abutment for the pedestrian bridge at Green’s Creek has been poured, ready for arrival of the bridge in February.
  • Montréal Station construction is underway. Utility work on Montreal Road to connect to Montréal Station is ongoing.
  • Concrete and mechanical, electrical, and plumbing works are ongoing at Jeanne d'Arc Station.
  • Concrete and mechanical, electrical, and plumbing works are ongoing at Place d'Orleans Station.
  • Footings and columns for the pedestrian bridge are underway at Place d'Orleans Station.

Montreal Station


Place d'Orleans Station


Trim Station


https://mailchi.mp/55e2cf8cf735/o-train-east-extension-construction-update?e=f37f60b514
Reply With Quote
     
     
  #910  
Old Posted Dec 11, 2021, 3:04 PM
DEWLine DEWLine is offline
Registered User
 
Join Date: Oct 2010
Location: Ottawa-Gatineau
Posts: 337
"Suburbanite poors" is not a contradiction. They exist too.
Reply With Quote
     
     
  #911  
Old Posted Dec 13, 2021, 6:09 PM
Stacmon's Avatar
Stacmon Stacmon is offline
Registered User
 
Join Date: Jul 2021
Posts: 119
Not pictured in the December 3rd post above is Jeanne D'Arc Station which is so far along now that there are multiple columns reaching about as high as the bridge that crosses over the highway. The station is really taking shape and its an encouraging sight to behold! If it was easier for me to post photos online I would share one I took a while back but perhaps someone has something even more recent anyway! It's really getting tangible out here now.
Reply With Quote
     
     
  #912  
Old Posted Dec 13, 2021, 6:34 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Yup, Jeanne D'Arc is quite advanced. I expect to see a steel structure go up very soon.
Reply With Quote
     
     
  #913  
Old Posted Dec 13, 2021, 8:20 PM
sseguin sseguin is offline
Registered User
 
Join Date: Aug 2018
Posts: 312
Hi Stacmon,

I saw your post about Jeanne d'Arc. You are more than welcome to share the pics with me for the O-Train Rail Fans site. You can send them to [email protected]. I can include your name or online handle for photo credits (whichever you prefer or provide).

In general, any and all photos for Stage 2 are very welcome from anyone. Just specify the station name and date and send in separate emails and I will be happy "and grateful" to post them in our archive for all to see. Alternatively, you can also post on our forums, which easily accept photos as well.

otrain.railfans.ca
__________________
Rail Fans Canada - https://www.RailFans.ca
Reply With Quote
     
     
  #914  
Old Posted Dec 14, 2021, 5:16 AM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 1,666
Montreal rd. station is really moving along.

And wow.. 7,000 tons of ballast has been delivered?? That is a LOT. I believe a standard dump truck load is 18 tons/yards. They aren't supposed to carry more than per MTO weigh restrictions. That is 389 trucks worth.
Reply With Quote
     
     
  #915  
Old Posted Dec 14, 2021, 5:46 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,047
Quote:
Originally Posted by DEWLine View Post
"Suburbanite poors" is not a contradiction. They exist too.
Very true.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #916  
Old Posted Dec 14, 2021, 8:30 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,402
Quote:
Originally Posted by ponyboycurtis View Post
Montreal rd. station is really moving along.

And wow.. 7,000 tons of ballast has been delivered?? That is a LOT. I believe a standard dump truck load is 18 tons/yards. They aren't supposed to carry more than per MTO weigh restrictions. That is 389 trucks worth.
When you consider it, that doesn't seem like all that much. A single truck could move that load in only a couple of months if it can get a few trips in each day, and the quarry on Bearbrook is fairly close.
Reply With Quote
     
     
  #917  
Old Posted Dec 14, 2021, 9:41 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
In Montreal, they are using excavated material for the ballast along the REM. Wondering if they're using that kind of efficiency in Ottawa. Where does the excavated material go? What was done with all the downed trees?
Reply With Quote
     
     
  #918  
Old Posted Dec 14, 2021, 10:02 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by J.OT13 View Post
In Montreal, they are using excavated material for the ballast along the REM. Wondering if they're using that kind of efficiency in Ottawa. Where does the excavated material go? What was done with all the downed trees?
I don’t know about excavated material but wherever possible they transplanted the trees.
Reply With Quote
     
     
  #919  
Old Posted Dec 15, 2021, 10:15 AM
Stacmon's Avatar
Stacmon Stacmon is offline
Registered User
 
Join Date: Jul 2021
Posts: 119
Quote:
Originally Posted by sseguin View Post
Hi Stacmon,

I saw your post about Jeanne d'Arc. You are more than welcome to share the pics with me for the O-Train Rail Fans site. You can send them to [email protected]. I can include your name or online handle for photo credits (whichever you prefer or provide).

In general, any and all photos for Stage 2 are very welcome from anyone. Just specify the station name and date and send in separate emails and I will be happy "and grateful" to post them in our archive for all to see. Alternatively, you can also post on our forums, which easily accept photos as well.

otrain.railfans.ca
Thanks for the invitation to share it with you! I have sent my picture of Jeanne D'Arc Station on December 7 to you. If you end up with the chance to post it here to share with others (along with Rail Fans), I would appreciate it. That way people could have a real sense of how far we have come there.
Reply With Quote
     
     
  #920  
Old Posted Dec 16, 2021, 5:06 AM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 1,666
Quote:
Originally Posted by Catenary View Post
When you consider it, that doesn't seem like all that much. A single truck could move that load in only a couple of months if it can get a few trips in each day, and the quarry on Bearbrook is fairly close.
You're right.. I forgot about the quarry on Bearbrook.

I'd be curious to know how many truck trips the eastern extension requires in total, excavation, delivering rail, concrete, steel etc etc.

Must be 10s of thousands in total.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 9:47 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.