HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #8541  
Old Posted Mar 12, 2018, 10:24 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,047
Quote:
Originally Posted by swimmer_spe View Post
Can we not just get rid of them and use the saved money for a longer extension?
At last check, underground SkyTrain is about $100-120M per kilometre and another $100M for each station. Even if all the public consultations somehow run up to half a million or more, that's still nickels and dimes compared to reaching Macdonald.
     
     
  #8542  
Old Posted Mar 13, 2018, 1:43 AM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:19 AM.
     
     
  #8543  
Old Posted Mar 13, 2018, 5:48 AM
Spork's Avatar
Spork Spork is offline
Shoebox Dweller
 
Join Date: Sep 2008
Location: Vancouver
Posts: 1,784
Just extend the line to Nanaimo and be done with it. Drop the tunnel 1km or so underground, get procurement going on the world's longest escalators for the station with the underwater aquarium in it, and GO!
     
     
  #8544  
Old Posted Mar 13, 2018, 6:30 AM
casper's Avatar
casper casper is online now
Registered User
 
Join Date: Nov 2011
Location: Victoria
Posts: 12,694
Quote:
Originally Posted by Migrant_Coconut View Post
At last check, underground SkyTrain is about $100-120M per kilometre and another $100M for each station. Even if all the public consultations somehow run up to half a million or more, that's still nickels and dimes compared to reaching Macdonald.
The cost of public consultation is not the engineers, public relationships people, urban planners and wherever else is involved in helping the public put stickers in circles it is the delay in the project and the inflation on the construction cost.

Public consultation is great and an important part of understanding the problem, being accountable to tax payers and finding problems before shovels are in the ground. However, that is all been done, lets get on with turning soil. The politicians need some new photo ops and we need an expanded skytrain line.
     
     
  #8545  
Old Posted Mar 14, 2018, 8:39 PM
ronthecivil ronthecivil is offline
Registered User
 
Join Date: Nov 2016
Posts: 69
Bored tunnels should only be a last resort.

Quote:
Originally Posted by Migrant_Coconut View Post
Again, the telecomms utilities are all on 10th - couldn't put them on Broadway at the time, because of the streetcar - and relocating them is a significant increase in capital cost. Same reason (among others) that LRT down 16th is unworkable.
If you're building a giant trench anyways the cost of relocating a duct bank is peanuts compared to building a bored tunnel.


The only reason to build a tunnel is there are no other options.

Never forget the risk you get with that too. Who knows what mysteries lie down there? Remember the bored tunnel on Clark hill and the sinkholes? That's nothing....

Broadway is chock a block full of utilities.

Any bored tunnel will have a massive cut and cover shaft at the stations that will cause the same amount of disruption to both people and traffic, and impact the utilities just as bad, as the cut and cover down tenth would...
     
     
  #8546  
Old Posted Mar 15, 2018, 3:14 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:18 AM.
     
     
  #8547  
Old Posted Mar 15, 2018, 3:48 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,777
Quote:
Originally Posted by Reecemartin View Post
We haven't seen an Underground LIM Skytrain station get built in a long time.
I'm not sure why we would expect an underground LIM station to be particularly special...?
     
     
  #8548  
Old Posted Mar 15, 2018, 4:06 PM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
At least we know the station platforms will be 80M or more
     
     
  #8549  
Old Posted Mar 15, 2018, 4:23 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:18 AM.
     
     
  #8550  
Old Posted Mar 15, 2018, 6:36 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,047
The Canada Line uses conventional motors, not LIM... and what does the motor have to do with the station, other than the track brakes?
     
     
  #8551  
Old Posted Mar 15, 2018, 6:55 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:18 AM.
     
     
  #8552  
Old Posted Mar 15, 2018, 6:59 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,201
Quote:
Originally Posted by ronthecivil View Post
If you're building a giant trench anyways the cost of relocating a duct bank is peanuts compared to building a bored tunnel.


The only reason to build a tunnel is there are no other options.

Never forget the risk you get with that too. Who knows what mysteries lie down there? Remember the bored tunnel on Clark hill and the sinkholes? That's nothing....

Broadway is chock a block full of utilities.

Any bored tunnel will have a massive cut and cover shaft at the stations that will cause the same amount of disruption to both people and traffic, and impact the utilities just as bad, as the cut and cover down tenth would...
I disagree, you can just move the station offside of the street and jog the tunnel over. The station pit doesn't need to be more complicated than an average high-rise foundation and parking lot.

All the geological info I've seen is generally more favourable for tunnelling than the fine sand that Evergreen went through. Evergreen was a deep soil tunnel, Broadway is a shallow one. Settlement and ground loss are still issues, but the soil and water pressure driving that soil movement is much smaller on Broadway.

The bigger concern is settlement and foundation damage. Both TBM and trenched excavation have potential settlement problems.

From my perspective, I'm most concerned about the possibility that the tunnel/trench will go through garbage filled ravines. That isn't fun for any construction method.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #8553  
Old Posted Mar 15, 2018, 7:01 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,047
Quote:
Originally Posted by Reecemartin View Post
I'm aware of the fact the Canada Line does not use Lim but, it is a subway with arguably mediocre stations.

Lim makes a difference in the scale of the tunnels so thats the association between motor and stations.
The tunnels aren't all that much smaller - ever gotten on/off at Granville or Burrard?

All we know at this point is that TransLink realizes the need for more functional stations and longer platforms.
     
     
  #8554  
Old Posted Mar 15, 2018, 7:03 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:18 AM.
     
     
  #8555  
Old Posted Mar 15, 2018, 7:16 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,047
Quote:
Originally Posted by Reecemartin View Post
Tunnels WILL be significantly smaller as they will be bored. The Canada Line has a much wider loading gauge.
Are we talking about the tunnels or the stations now? Either way, there really isn't a visible difference between the Expo Line and the Canada Line. One's square, the other's round, that's it.
     
     
  #8556  
Old Posted Mar 15, 2018, 7:45 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,559
Quote:
Originally Posted by Migrant_Coconut View Post
Are we talking about the tunnels or the stations now? Either way, there really isn't a visible difference between the Expo Line and the Canada Line. One's square, the other's round, that's it.
Boring machines make round tunnels, cut and cover makes square ones.
     
     
  #8557  
Old Posted Mar 15, 2018, 8:16 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,639
Quote:
Originally Posted by WarrenC12 View Post
Boring machines make round tunnels, cut and cover makes square ones.
Cut and cover causes significantly more disruption. You need to rip up the entire road as opposed to like where the stations are gonna be built.
     
     
  #8558  
Old Posted Mar 15, 2018, 8:25 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,559
Quote:
Originally Posted by cganuelas1995 View Post
Cut and cover causes significantly more disruption. You need to rip up the entire road as opposed to like where the stations are gonna be built.
Absolutely, I lived here when the Canada Line was constructed. But it's cheaper, and potentially faster.
     
     
  #8559  
Old Posted Mar 15, 2018, 9:18 PM
cganuelas1995 cganuelas1995 is offline
Registered User
 
Join Date: Jan 2017
Posts: 1,639
Quote:
Originally Posted by WarrenC12 View Post
Absolutely, I lived here when the Canada Line was constructed. But it's cheaper, and potentially faster.
But you do have to take into account that Cambie wasn't and still isn't as big as a corridor as Broadway is. Broadway carries 3 FTN buses east of Granville and 4 west of Granville, 4 or 5 respectively if you include the N17. This is a corridor that we want to minimize disruptions on.
     
     
  #8560  
Old Posted Mar 15, 2018, 9:31 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:18 AM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:46 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.