  #681  
Old Posted Apr 30, 2019, 3:32 AM
MarkR MarkR is offline
Registered User
 
Join Date: Apr 2015
Posts: 150
Quote:
Originally Posted by OTownandDown View Post
Does anyone know if the lookout park is open today at Chaudiere? I know the bridge is closed, but could I ride a bike to the lookout?
It's open, we walked there today. The lookout near the bridge is easy to get to, but the ring dam lookout requires walking past all the construction. We weren't sure at first, but kept on going and no one said Boo to us.

That said, while the flow through the open dam is impressive (Ottawa Hydro has tweeted that this is only the second time all gates have been opened since the dam was built), the bridge lookout is more "exciting", as the cauldron is right below and right now has some impressive standing waves.
Reply With Quote
     
     
  #682  
Old Posted Apr 30, 2019, 1:25 PM
OTownandDown OTownandDown is offline
Registered User
 
Join Date: Jul 2018
Posts: 1,618
Quote:
Originally Posted by MarkR View Post
It's open, we walked there today. The lookout near the bridge is easy to get to, but the ring dam lookout requires walking past all the construction. We weren't sure at first, but kept on going and no one said Boo to us.

That said, while the flow through the open dam is impressive (Ottawa Hydro has tweeted that this is only the second time all gates have been opened since the dam was built), the bridge lookout is more "exciting", as the cauldron is right below and right now has some impressive standing waves.
Thanks Mark! I bike there regularly (well, when the weather is better) and I remember the 2017 flood having some massive waves.
Reply With Quote
     
     
  #683  
Old Posted Apr 30, 2019, 3:17 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
I heard on the radio yesterday that the output of water at the Chaudière dam was two olympic-sized pools per second, almost double that of Niagara Falls.

Maybe they were exaggerating or being sensational.

Bate Island is sure taking a hit. Too intense for the kayakers.. not that they can even get there since the place is closed.
Reply With Quote
     
     
  #684  
Old Posted May 14, 2019, 12:52 PM
Jayday23 Jayday23 is offline
Registered User
 
Join Date: Sep 2017
Posts: 357
As per this article, here are some interesting zibi tidbits:

- construction for Block 211 has started. it`s the first new office building in about 5 years in ottawa.

- a couple of 100K SQ tenants will be announced shortly for the building.

- Block 211 will be completed in 2022.

- As construction heads toward a peak, likely in 2020, Zibi will also begin to add more permanent residents. A 149-unit, 14-storey apartment tower will begin to rise this fall, and the building will also be home to the project’s district energy system.

- The O condos are now 90% sold.

- The Kanaal Condos are sold out and will gain occupancy in December.

Read more here : https://renx.ca/zibi-dream-theia-develop-new-ottawa-office-building/
Reply With Quote
     
     
  #685  
Old Posted May 14, 2019, 1:53 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367
What's "block 211"?
That entire little park next to the bridge on the Gatineau side is flooded right now. They'll have to dump some ground in there and reinforce the entire bank with boulders/concrete if they don't want it to get swept every second spring.


Last edited by zzptichka; May 14, 2019 at 2:16 PM.
Reply With Quote
     
     
  #686  
Old Posted May 14, 2019, 2:05 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
here is a block map. Block 211 is on the east side of Booth on the Ontario side (skinny purple building in the map above)

http://webcast.ottawa.ca/plan/All_Image%...75%20Master%20Plan%20Ontario%20Lands.PDF
Reply With Quote
     
     
  #687  
Old Posted May 14, 2019, 2:29 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367
Quote:
Originally Posted by waterloowarrior View Post
here is a block map. Block 211 is on the east side of Booth on the Ontario side (skinny purple building in the map above)

http://webcast.ottawa.ca/plan/All_Image%...75%20Master%20Plan%20Ontario%20Lands.PDF
Thanks.
Does anyone knows who owns this bridge behind War Museum?
They spent so much money on it with benches and everything in 2015 and it's been closed ever since.
Even if it's fenced off on the other end due to construction why not open it on this end for public? It's a nice promenade.

Reply With Quote
     
     
  #688  
Old Posted May 14, 2019, 3:16 PM
Jayday23 Jayday23 is offline
Registered User
 
Join Date: Sep 2017
Posts: 357
Quote:
Originally Posted by waterloowarrior View Post
here is a block map. Block 211 is on the east side of Booth on the Ontario side (skinny purple building in the map above)

http://webcast.ottawa.ca/plan/All_Image%...75%20Master%20Plan%20Ontario%20Lands.PDF
Here's the most recent image of the building

Reply With Quote
     
     
  #689  
Old Posted May 15, 2019, 10:06 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
This is great news! Some major progress coming up!
Reply With Quote
     
     
  #690  
Old Posted May 15, 2019, 10:24 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,684
Quote:
Originally Posted by zzptichka View Post
Does anyone knows who owns this bridge behind War Museum?
They spent so much money on it with benches and everything in 2015 and it's been closed ever since.
Even if it's fenced off on the other end due to construction why not open it on this end for public? It's a nice promenade.
I think Hydro Ottawa had to rebuild that bridge as part of their project since it is part of the dam's water control. The last 50 feet is hinging on the Zibi development. I heard it might not open until next year at the soonest. I believe it all gets transferred to the NCC at the end, but they don't like to take ownership until it's all completed, so it might be caught in a liability limbo.
Reply With Quote
     
     
  #691  
Old Posted May 18, 2019, 12:09 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
In the article, it talks about a couple 100,000 sqft tenants. The office building is 200,000 sqft. So is it two tenants for the entire building, or will they need to build a second office building. Or maybe they have a couple 100,000 sqft worth of tenants lined up?
Reply With Quote
     
     
  #692  
Old Posted May 25, 2019, 10:58 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367
Stumbled upon their open house or something.
Featuring the latest map and renders of a few planned commercial buildings. Don't think I've seen those before.







Reply With Quote
     
     
  #693  
Old Posted May 27, 2019, 12:18 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
I believe Block 211 is the only one ready for shovels at the moment. If the rest of the industry continues to drag its feet, we might see a few more of these go up sooner than later.
Reply With Quote
     
     
  #694  
Old Posted May 27, 2019, 2:41 PM
danishh danishh is offline
Registered User
 
Join Date: Dec 2013
Posts: 429
Quote:
Originally Posted by J.OT13 View Post
I believe Block 211 is the only one ready for shovels at the moment. If the rest of the industry continues to drag its feet, we might see a few more of these go up sooner than later.
the government is in a quebec office space bind right now. DND's not going back to Louis St. Laurent, the NPB is basically a warehouse full of cubicles, TDLC is literally shedding bricks and needs a complete overhaul (contract awarded already), PDP needs the same.

I'm surprised no-one is pushing for more of the Gatineau-side office space to get expedited.
Reply With Quote
     
     
  #695  
Old Posted May 27, 2019, 3:14 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
I've been thing the same thing for the last little while. I expect we won't see any progress on that front until after the election.
Reply With Quote
     
     
  #696  
Old Posted May 28, 2019, 1:35 PM
Acajack's Avatar
Acajack Acajack is offline
Gros Méchant Loup
 
Join Date: Aug 2006
Location: Province 2, Canadian Empire
Posts: 72,949
In the francophone media this morning there is news that the Promenade du Portage bar Le Petit Chicago will be moving to what I believe will be the first of Zibi's commercial buildings.

Article in French:

https://www.ledroit.com/actualites/gatin...-a-zibi-d601d11709eebe9e981f96ef23830c61

A few months ago, we discussed on here how Le Petit Chicago was getting kicked out of its current digs:

https://forum.skyscraperpage.com/showpost.php?p=8407371&postcount=5604

Apparently Zibi approached the bar when they read in the news about it becoming "homeless". Which shows that the Zibi people are aggressive and on the ball when it comes to pursuing commercial occupants.
__________________
Loin des yeux, loin du coeur.
Reply With Quote
     
     
  #697  
Old Posted May 28, 2019, 1:59 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by Acajack View Post
In the francophone media this morning there is news that the Promenade du Portage bar Le Petit Chicago will be moving to what I believe will be the first of Zibi's commercial buildings.

Article in French:

https://www.ledroit.com/actualites/gatin...-a-zibi-d601d11709eebe9e981f96ef23830c61

A few months ago, we discussed on here how Le Petit Chicago was getting kicked out of its current digs:

https://forum.skyscraperpage.com/showpost.php?p=8407371&postcount=5604

Apparently Zibi approached the bar when they read in the news about it becoming "homeless". Which shows that the Zibi people are aggressive and on the ball when it comes to pursuing commercial occupants.
That's awesome news!! Solid anchor tenant for Zibi. Good indication that they want local, not chains (à la Lansdowne).

Reminds of Festibière; they were displaced from the Museum of Civilization by the floods this year and Zibi stepped up to offer a new space for this year's edition (in June). Very impressed!
Reply With Quote
     
     
  #698  
Old Posted May 28, 2019, 7:17 PM
illusion121 illusion121 is offline
Registered User
 
Join Date: Jun 2018
Posts: 21
Timeline

So what is the general timeline for the various phases?
Are we talking about a year per phase? Two? Three?

Has anybody asked them?
Reply With Quote
     
     
  #699  
Old Posted May 28, 2019, 8:39 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367
Quote:
Originally Posted by illusion121 View Post
So what is the general timeline for the various phases?
Are we talking about a year per phase? Two? Three?

Has anybody asked them?
More like five. With five phases in total. And they are already like few years behind.
I had a master plan somewhere. Will have a look.
Reply With Quote
     
     
  #700  
Old Posted May 28, 2019, 8:47 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367
Actually I was a bit wrong:




But we are 3-4 years in and still barely scratching the first phase:

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 8:50 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.