HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #661  
Old Posted Apr 25, 2019, 3:24 AM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Here are some new renderings from the Zibi website:
















Last edited by kevinbottawa; Apr 25, 2019 at 3:51 AM.
Reply With Quote
     
     
  #662  
Old Posted Apr 25, 2019, 3:41 AM
kevinbottawa kevinbottawa is offline
Registered User
 
Join Date: May 2010
Location: Toronto
Posts: 2,260
Some new renderings from the Dream website. Looks like the office building design on the Ottawa side has changed. The website says it's 100% leased.

Before



After





Office building on the Gatineau side







https://dreamoffice.findspace.com/index....%20office&show_no_vacancy=off&lang=en_CA
Reply With Quote
     
     
  #663  
Old Posted Apr 25, 2019, 12:16 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Not a fan of the Ottawa office tower's podium. Reminds me of 90s red brick suburban office or municipal building. The office building in Gatineau looks like a suburban commercial building or institutional (university faculty or branch library).

I'm a fan of everything that was posted on the previous page. It looks organic. Very urban, especially down Laval Street. The sort of Food Hall area, second last picture on the previous page, reminds of Forks Market in Winnipeg.

As for the "100% leased" tags on the Dream website, I'm very skeptical. Doesn't seem realistic considering the slow pace of construction.

Last edited by J.OT13; Apr 25, 2019 at 12:26 PM. Reason: Expanded on my thoughts
Reply With Quote
     
     
  #664  
Old Posted Apr 25, 2019, 1:21 PM
daud's Avatar
daud daud is offline
Registered User
 
Join Date: Jun 2012
Location: Ottawa
Posts: 762
are all those buildings really already 100% leased?
Reply With Quote
     
     
  #665  
Old Posted Apr 25, 2019, 1:26 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by daud View Post
are all those buildings really already 100% leased?
As per my comment above, I highly doubt it. Otherwise they would ramp up construction significantly.
Reply With Quote
     
     
  #666  
Old Posted Apr 25, 2019, 1:27 PM
Capital Shaun Capital Shaun is offline
Registered User
 
Join Date: May 2012
Location: Ottawa
Posts: 862
Quote:
Originally Posted by Kitchissippi View Post
I’m not sure what to think of this. It looks like a random collection of buildings and the materials seem clash with the natural setting.
I'd rather have a bunch of buildings that look random vs a lazy developer who builds 20 towers using the same finishes on all of them.
Reply With Quote
     
     
  #667  
Old Posted Apr 25, 2019, 1:40 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Yes, thank goodness Claridge and Brigil aren't involved.
Reply With Quote
     
     
  #668  
Old Posted Apr 27, 2019, 6:30 PM
AuxTown's Avatar
AuxTown AuxTown is online now
Registered User
 
Join Date: Apr 2006
Location: Ottawa, Canada
Posts: 4,621
Hydro Ottawa posted some great drone footage of the Chaudière Falls with all the spans open for only the 2nd time in 100 years! Stay dry out there folks.

https://twitter.com/hydroottawa/status/1122203236671221760
Reply With Quote
     
     
  #669  
Old Posted Apr 28, 2019, 1:31 AM
Marshsparrow Marshsparrow is offline
Registered User
 
Join Date: Dec 2009
Posts: 1,680
If Chaudiere bridge closing and high water becomes a yearly occurrence - is this a sound / safe development?

What residential buildings are for sale and is there a schedule for the others?
Reply With Quote
     
     
  #670  
Old Posted Apr 29, 2019, 4:16 AM
Nowhere Nowhere is offline
Registered User
 
Join Date: May 2018
Posts: 228
Quote:
Originally Posted by Marshsparrow View Post
If Chaudiere bridge closing and high water becomes a yearly occurrence - is this a sound / safe development?

What residential buildings are for sale and is there a schedule for the others?
Looking at the floodplains map on Geoottawa, the building completely on the bottom right of Chaudière Island is definitively in the floodplain.
Reply With Quote
     
     
  #671  
Old Posted Apr 29, 2019, 1:41 PM
OTownandDown OTownandDown is offline
Registered User
 
Join Date: Jul 2018
Posts: 1,619
Does anyone know if the lookout park is open today at Chaudiere? I know the bridge is closed, but could I ride a bike to the lookout?
Reply With Quote
     
     
  #672  
Old Posted Apr 29, 2019, 2:10 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,799
Quote:
Originally Posted by OTownandDown View Post
Does anyone know if the lookout park is open today at Chaudiere? I know the bridge is closed, but could I ride a bike to the lookout?
I think I saw on Hydro Ottawa's Twitter that the park is closed.
Reply With Quote
     
     
  #673  
Old Posted Apr 29, 2019, 2:53 PM
OTownandDown OTownandDown is offline
Registered User
 
Join Date: Jul 2018
Posts: 1,619
Quote:
Originally Posted by bradnixon View Post
I think I saw on Hydro Ottawa's Twitter that the park is closed.
https://twitter.com/GlennGobuyan/status/...%5Egoogle%7Ctwcamp%5Eserp%7Ctwgr%5Etweet
Reply With Quote
     
     
  #674  
Old Posted Apr 29, 2019, 3:10 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
As per Hydro Ottawa, it's closed until further notice.

https://twitter.com/hydroottawa/status/1122283485010460672
Reply With Quote
     
     
  #675  
Old Posted Apr 29, 2019, 4:57 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367
Quote:
Originally Posted by Marshsparrow View Post
If Chaudiere bridge closing and high water becomes a yearly occurrence - is this a sound / safe development?

What residential buildings are for sale and is there a schedule for the others?
The banks are high and buildings should be fine. If the water goes a meter above what it is right now though, the bridge could go down. But then again, places like Britannia Village and Pointe-Gatineau homes along the river would be completely submerged by then.
Reply With Quote
     
     
  #676  
Old Posted Apr 29, 2019, 5:08 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367
The lookout is open BTW. Not sure about the park.
Here's a webcam: https://www.ipcamlive.com/chaudiere
Reply With Quote
     
     
  #677  
Old Posted Apr 29, 2019, 10:54 PM
danishh danishh is offline
Registered User
 
Join Date: Dec 2013
Posts: 429
One of the reasons I didn't buy a condo at zibi's first Ottawa building was that I was concerned about the only vehicular access being booth/eddy. I was looking there in fall 2016, before the first floods.

It was more about dealing with construction/roadwork, but I see how other buyers could be put off by the repeated closings due to flooding. The bridge problems will basically dead-end chaudière Island there whenever the feds get around to replacing the bridge.
Reply With Quote
     
     
  #678  
Old Posted Apr 30, 2019, 12:05 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,593
Zibi says it is building to weather a one-in-a-thousand year flood

Elizabeth Payne, Ottawa Citizen
Updated: April 29, 2019


Zibi’s new seven-storey observation tower made from shipping crates opens to the public on Wednesday, offering a birds-eye view of the Ottawa River, the source of the worst spring flooding in recent memory. The opening comes just as the river is expected to peak in parts of Ontario and Quebec.

Despite its proximity to the water — and the roiling Chaudière Falls — officials at Zibi say they are high and dry and will remain that way because the development is being built to withstand once-in-1,000-year floods.

“Our philosophy is that we build with climate resiliency in mind. If you think about extreme weather due to climate change, all of our infrastructure is built with that in mind,” said president Jeff Westeinde.

Zibi’s observation tower made from shipping crates opens to the public on Wednesday, offering a birds-eye view of the Ottawa River just as the river is expected to peak in parts of Ontario and Quebec. Errol McGihon/PostmediaThe bridge that links two parts of the development is not high and dry however. The Chaudière Bridge has been temporarily closed to the public as flood waters lap around its deck. It was also temporarily closed during the 2017 floods.

Each half of the Zibi development is accessible by municipal roads — Booth Street in Ottawa and Eddy Street in Gatineau. Getting from one side to the other while the bridge is closed involves using the Portage Bridge, just east of the Chaudière Bridge.

There are 79 residents living on the Quebec side, where retail construction is underway. On the Ontario side, a six-storey residential building is set for occupancy early next year. Commercial construction is also beginning.

Westeinde said he sees the spring flooding as an opportunity to talk about environmental sustainability in the way communities are built — something that is a focus of the project.

“Anybody who comes down here, it is visually apparent that we are significantly higher than the water levels — you can see it,” he said. “We have done a tremendous amount of due diligence on these lands.”

Westeinde said flooding and other issues should make people think about not only where we they live, but how communities are built.

The development plans to be the region’s first zero-carbon district. Its cooling and heating system will employ post-industrial waste heat, among other things.

“I think anybody looking at real estate should be thinking about climate resilience,” he said.

https://ottawacitizen.com/news/local-new...o-weather-a-one-in-a-thousand-year-flood
Reply With Quote
     
     
  #679  
Old Posted Apr 30, 2019, 12:37 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
you can see the master grading plan on the Ontario side and some of the other design documents here. The grading plan also indicates the 100 year floodplain.

design docs
https://app01.ottawa.ca/postingplans/appDetails.jsf?lang=en&appId=__9682J0

grading plan (2018)
http://webcast.ottawa.ca/plan/All_Image%...12-14-0075%20Master%20Grading%20Plan.PDF

current water levels below the Chaudiere Falls on the main channel - 45.2 metres asl
https://wateroffice.ec.gc.ca/report/real_time_e.html?stn=02LA028

The surface of the Chaudiere Bridge is 50.5 metres. Most of the property will be built at 50-55m.
Reply With Quote
     
     
  #680  
Old Posted Apr 30, 2019, 1:51 AM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,367
The bridge is taking the hit. The metal walkway under it is gone.
Meanwhile, water level at Britannia, having surpassed the records, doesn't seem to be slowing down.

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 11:03 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.