Quote:
Originally Posted by mrjauk
Another letter from a Sun reader:
Link to letter
The Canada Line lobby claims former Cambie Street merchant Susan Heyes should have suffered massive business losses for the common good. Such rubbish!
The line is being built for political prestige. There was not the ridership to justify subway construction (about 500,000 passengers a day), nor will there be in future. It's a project to satisfy the premier's mania for public-private partnership construction and to placate west-side Liberal voters for not building light rail transit on the contentious Arbutus corridor.
Most major transit projects around the world, including light rail and all cut-and-cover subway projects, have compensation packages for affected merchants who can prove a loss due to construction. [is this true?]
The real story is that costs for the line were spiralling out of control and InTransit BC had to reduce the scope of construction.
It achieved this by switching from the expensive SkyTrain to a cheaper "generic" metro; reducing station size to accommodate only three-car trains; single-track operation in Richmond, and a switch from bored-tunnel to cut-and-cover construction and no compensation for affected merchants. [As for his claims here, am I right that they are FALSE, FALSE (only 3-car trains?), TRUE, FALSE (cut-and-cover ended up costing just about as much, but the decision was made in the interests of time)?]
What the public is getting for its money is a truncated metro system that needs billions more just to achieve the capacity of a simple and much cheaper LRT line down the Arbutus corridor. [I know that an LRT down Arbutus would have greater potential capacity than one down Broadway, but will we really have to spend billions more for the Canada Line to achieve the capacity of a maxed-out potential LRT down Arbutus?] Where is the public good in that?
D.M. Johnston
Delta
Someone should send a letter to the Sun rebutting some of this gentleman's claims.
|
Since when would subway construction require 500,000 passengers per day?
It's not true that every rail construction project has compensation packages for local businesses.
InTransitBC, or rather SNC Lavalin, never chose SkyTrain technology to begin with. In fact, its bidding competitor Bombardier was the one proposing SkyTrain.
And what's so wrong with 'generic' metro? Not to mention, isn't Johnston supposedly anti-SkyTrain or is this a double standard?
However, this is all true: reducing station size to accommodate only three-car trains; single-track operation in Richmond.
Fact is, Arbutus wouldn't have achieved the same ridership as the Cambie corridor for the most obvious reasons: employment centres, attractions, and the location of it being down the centre of the city. Arbutus was also longer....really, what is along the Arbutus corridor besides Central Broadway and Kerrisdale? Absolutely nothing.