All non-downtown development projects will go in this thread for now on. This includes projects in Murray, Westvalley, Sandy, midvalley and south valley cities though out the Salt Lake metro.
This thread will combined other threads such as...
South Salt Lake to get a 25-story tower
http://forum.skyscraperpage.com/showthread.php?t=139631
RSL Stadium?.....Will it happen?
http://forum.skyscraperpage.com/showthread.php?t=123315
Oh My God, Gehry 5-star Hotel In Lehi Is True!!!!
http://forum.skyscraperpage.com/showthread.php?t=123793
Simple Forum Guidelines
#1 All posts that are not related to Salt Lake City Proper, but fall into the Official Salt Lake City Metro, i.e Salt Lake, Summit and Tooele Counties, will be posted on the Salt Lake City MSA Thread.
#2 Regarding the creation of individual threads for particular projects, such as 222 South Main,106th South, or Gehry. Until the Projects have broken ground, they should remain in their respective threads. Then, after they have broken ground, we should be respectful enough to get a majority consensus before creating a new thread for that specific project.
Midvalley & Southvalley rundown
Finish Projects
Sandy City
RSL Stadium
http://rslstadium.com/index2.html
Recently Finished in 2008
Floors:4-stories
Height:111 feet tall
Address: 9400 South State Street
Other: 20,000 seat soccer stadium to open in fall of 2008
Workers Compensation Fund Headquarters
Finish 2010
Floors:6
Height:Unknown
Address: 100 W. Towne Ridge Parkway (approximately 9700 South).
Other: The new facility will have enhanced structural elements and systems designed to facilitate continuous operation of the WCF in the event of a natural disaster or similar event. The facility is also being designed to improve work flow and operations as well as employee security. The facility will also have expanded resources for WCF-sponsored policyholder training on workplace safety, return to work and other workers' compensation related issues. LEED certification of the project will be sought. Phase 1 will be a 6-7 story building. Phase 2 could come later with a 2nd building that could reach up to 10-stories.
http://www.facebook.com/photo.php?pi...mpensationFund
Scheels
Finish 2010
Floors:2-3
Height:Unknown
Address:approximately 11400 South between state street and I-15
Rendering
Murray
Intermountain Medical Center
Finished in 2008
Floors:15,9,7,6,5,3 ( Six buildings )
Height:Unknown
Address: 5300 South Main Street
One of Utah's largest construction projects, with over 1.3 million square feet, IMC houses a host of engineering innovations to address the diverse of a full-service medical campus.
Valley Center Towers Phase II
http://www.valleycentertowers.com/
Finish 2009
Floors:6 ( Three 6-story building in three phases. )
Height:Unknown
Address: 5300 South Green Street
Other: Office Space
Birkhill @ Fireclay
http://www.hamlethomes.com/communiti...eo.aspx?cid=18
Finish 2010
Floors:4
Height:Unknown
Address: 4500 South Main Street
Other: Mix-use housing, Office and retail space.
H&M and Crate&Barrel @ Fashion Place
Finish 2011
Floors:2
Height:Unknown
Address:
Other: New Retail
Park City
ST. Regis
Under construction
Floors:12
Height:Unknown
The floors are all done, and the roof is going on; The exterior is beginning to receive some of the finishing details; The restaurant area, the pool area, and the funicular are all plainly visible. Construction is still pegged for completion summer of 2009.
Montage Resort
Finished in 2010
Floors:9
Height:Unknown
Other: 178 hotel rooms and suites, 94 luxury residences, two restaurants, retail shops, a 35,000-square-foot spa, and 15,000 square feet of event/meeting space.
South Jordan
Oquirrh Mountain Utah Temple
Finished in 2010
Floors:4-5
Height:Unknown
Address: Daybreak area
Other:The Oquirrh Mountain Utah Temple will be built in South Jordan on an 11-acre site along a western mountain bluff. It will be the fourth temple in the Salt Lake valley and the second with a South Jordan zip code. South Jordan will be the first city in the world with two Mormon temples.
U of U Medical Center @ Daybreak
Finished in 2011
Floors:4
Height:Unknown
Address: Daybreak area
Other:
Draper
Draper Utah Temple
Finished in 2010
Floors:4-5
Height:Unknown
Address:
Other: Draper Temple will be the 3rd temple in the Salt Lake Valley.
Cowabunga Bay
Finished in 2009
Floors:None
Height:70 feet
Address:
Salt Lake City, Utah will see the opening of a new water park come Summer 2009. Cowabunga Bay Neighborhood Waterpark will test the limits of how compact a water park can get and still be functional.
Designed by Whitewater West and founded by the Huish brothers, the park will move away from the traditional idea of an all-day park experience in lieu of a compact park meant for 3-4 hours of fun. Because the park's founders are designing this park to be an in-and-out experience, the price point falls close in line at $10-15 for entry.
The structure will stand 70 feet tall and provide the slides, giant water buckets, and lazy rivers expected of the water park experience. See the images below for an idea of how this park is going to shape up.
Photos Courtesy Cowabunga Bay Construction Blog
Projects in the works
West Valley City
Fairbournestation
Embassy Suites Hotel
U/C
Floors:7
Height:Unknown
Address:
Sandy City
The Ridge Condominiums
Under construction
Floors:4
Height:Unknown
Address:
The Ridge consists of four, 4-story luxury condominium buildings to be built in two Phases. Each building will be constructed above two-plus levels of controlled access underground parking. In all, there are 201 condominium residences planned for this exceptional eight acre site. Phase I consists of 95 total units: Building A (43 units) and Building B (52 units). Demolition and excavation activities for Phase I commenced late in 2007.
The parking structure for Building A is now complete, laying the groundwork for the vertical framing of the condominium units. Completion of the 43 units in Building A is anticipated during the next six months.
Cottonwood Heights
Old Mill Corporate Center complex
Under construction
Floors:6-8
Height:Unknown
Address:
"The fourth building in the Old Mill Corporate Center complex was approved three years ago as a six-story facility -- the tallest height for office buildings in the city.
But a few weeks ago, developers Beckstrand & Associates informally pitched Cottonwood Heights city leaders with another possibility: a 6 to 8-story structure.
old mill by
John Martin K, on Flickr
South Salt Lake
Market Station Development
Under Construction
Address: 2100 South Main Street
Other: The 18-acre development will cost $500 million and will extend from 2100 South to 2300 South and Main to State streets. The development would rise 27 stories over the city and include up to 850 housing units, pocket parks, a grocery story, fitness center, day care and restaurants.