Groundbreaking ceremony for the first tower in Westdell Sereno West project technically known as 15 Capulet Walk and 689 Oxford Street West.
Should be 26s if they keep to the most recent plan. Although the render in the article only shows 23s? Good to see Westdell actually move ahead with one of their many apartment proposals.


https://www.ctvnews.ca/london/article/sh...ast-tracked-transit-hub-apartment-tower/

Last edited by jammer139; Nov 7, 2025 at 6:52 PM.
Reply With Quote
     
     
  #42  
Old Posted Dec 9, 2025, 11:53 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
After a couple of weeks of pause they have returned with excavator and dump trucks and appear to be starting excavation of the first building. They plan to have a parking garage structure running along the railway track embankment so not sure how deep they will go or if they plan to have even one level of underground parking.
Reply With Quote
     
     
  #43  
Old Posted Jan 26, 2026, 4:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
J-ARR still working to excavate for the foundation for this Westdell building and parking garage structure.
Reply With Quote
     
     
  #44  
Old Posted Feb 18, 2026, 7:34 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Forming has started for what appears to be a retaining wall along the rail track embankment and for foundation footings. Does not appear to be any plans for an L1 level for this building or parking garage.
Reply With Quote
     
     
  #45  
Old Posted Apr 2, 2026, 2:37 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
They have made some progress with the parking garage retaining wall along the south side and footings for the building. Using small mobile crane so far with no signs of a tower crane yet.
Reply With Quote
     
     
  #46  
Old Posted May 14, 2026, 9:08 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Westdell has started assembling the tower sections of the next tower crane to go up in London this year. Capulet is still closed where they appear to be installing the utility services connection into the street.
Reply With Quote
     
     
  #47  
Old Posted May 23, 2026, 11:51 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
They added a couple more sections to the tower portion of the tower crane but not the boom or cab. Still have Capulet closed for the utility service connections.
Reply With Quote
     
     
  #48  
Old Posted May 24, 2026, 8:40 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
They have now finished setting up the tower crane boom and cab. Have also reopened Capulet Walk road to traffic. Next up will Sifton get the tower crane for their 9s in West5 before Halloway Holdings gets the tower crane up at 320 King St?
Reply With Quote
     
     
  #49  
Old Posted Jun 4, 2026, 8:20 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Have now got some of the elevator stairwell shaft for the ground floor poured and formed.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 9:12 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.