HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


Closed Thread

 
Thread Tools Display Modes
     
     
  #5941  
Old Posted Feb 17, 2015, 8:15 PM
hipster duck's Avatar
hipster duck hipster duck is online now
Registered User
 
Join Date: Oct 2014
Location: Toronto
Posts: 4,870
Quote:
Originally Posted by 1overcosc View Post
Not really. There's one critical way that SmartTrack/RER and the Scarborough subway differ: the former does not serve Scarborough Centre (instead going a few km away from it), while the latter does. And given that RER is 15 minute frequency whereas existing service to STC is every 5 or something like that, something beyond RER will be needed for STC.

The cost of the Scarborough subway could possibly be reduced by having it follow the current RT corridor instead. Maybe the savings could then be directed to extending the Eglinton line east to meet up with the Lakeshore RER? Does that work?
The Scarborough subway's cost could be reduced by eliminating it completely.

It is completely pointless to have both it and SmartTrack together. If I were to eliminate one, I would definitely eliminate the Scarborough subway, especially since the subway dangles the possibility of future extension at extravagant cost into suburbia, when the Stouffville corridor is right there for the picking.

The much cheaper alternatives for serving Scarborough Town Centre include:

1. The original Transit City LRT
2. Keeping the SRT, with some minor curve modifications, and purchasing new vehicles (I don't know why this isn't even being considered)
3. Building a SmartTrack heavy rail spur, and then running alternating service, with one train going straight downtown, and the other running as a shuttle to Kennedy. Munich runs heavy rail, 9 car S-bahns at 90 second headways, so I think we can pull off 7.5 minute headways with the same equipment.
     
     
  #5942  
Old Posted Feb 17, 2015, 8:17 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
Quote:
Originally Posted by hipster duck View Post
I'd rather see money go to transit than prisons, but building a heavy rail SmartTrack about 3 km to the east of another heavy rail Scarborough subway line seems like the biggest waste of transit money in Canadian history.
Isn't it supposed to cost like $8 billion? That's a massive transit investment...
     
     
  #5943  
Old Posted Feb 17, 2015, 8:21 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
BTW I've been following the Eglinton Crosstown construction on Youtube and I must say I'm jealous... Sure Montreal is going to get these big transit projects but they won't start construction for another 2 years...
     
     
  #5944  
Old Posted Feb 17, 2015, 9:33 PM
TorontoDrew's Avatar
TorontoDrew TorontoDrew is offline
Registered User
 
Join Date: Nov 2014
Posts: 10,684
Quote:
Originally Posted by MalcolmTucker View Post
And $1.7 billion on prisons over ten years works out to $4 million per year per million in population.

Not that much at all.

Since crime rates have been dropping it's a HUGE waste of money.
     
     
  #5945  
Old Posted Feb 17, 2015, 9:38 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,595
Quote:
Originally Posted by TorontoDrew View Post
Since crime rates have been dropping it's a HUGE waste of money.
Still, have to identify bigger pots of money if you want real higher levels of infrastructure support.
     
     
  #5946  
Old Posted Feb 17, 2015, 9:42 PM
TorontoDrew's Avatar
TorontoDrew TorontoDrew is offline
Registered User
 
Join Date: Nov 2014
Posts: 10,684
Quote:
Originally Posted by MalcolmTucker View Post
Still, have to identify bigger pots of money if you want real higher levels of infrastructure support.

You're right and there are plenty of ways to find the funds but wasting $1.7 does not help out transit in anyway.
     
     
  #5947  
Old Posted Feb 18, 2015, 2:49 AM
miketoronto miketoronto is offline
Registered User
 
Join Date: Jul 2001
Location: Toronto, Ontario, Canada
Posts: 9,932
Quote:
Originally Posted by hipster duck View Post
I'd rather see money go to transit than prisons, but building a heavy rail SmartTrack about 3 km to the east of another heavy rail Scarborough subway line seems like the biggest waste of transit money in Canadian history.
I guess Paris, London, Berlin, Milan, and other world cities have wasted billions building regional rail and subway lines next to each other?

Should we tell London to stop building Crossrail, because it is too close to other subway lines? And don't use the density excuse, because that is just that, an excuse.

The two lines will serve different travel purposes.
__________________
Miketoronto

Last edited by miketoronto; Feb 18, 2015 at 11:56 PM.
     
     
  #5948  
Old Posted Feb 18, 2015, 3:31 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
But with fare integration and frequent service, they will cannibalize each others ridership.

We'll see how it plays out.
     
     
  #5949  
Old Posted Feb 18, 2015, 3:41 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is online now
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,833
smart track will likely be too infrequent to cannibalize too much ridership from the subway.

Also, no way in hell smart track ends up costing $8 billion. GO transit is already talking about building out and electrifying their entire 400+km network for $8-10 billion, why one 50km line sharing a lot of infrastructure that GO is already planning will cost just as much leaves me mystified. are they planning to plate the trains in gold or something?
     
     
  #5950  
Old Posted Feb 18, 2015, 4:44 AM
ssiguy ssiguy is offline
Registered User
 
Join Date: Mar 2006
Location: White Rock BC
Posts: 11,912
I don't know where the $8 figure came from but seems extreme and grossly over inflated.

The corridors are there, the province is paying for the electrification, many of the stations are all ready built, there will be relatively little new track, and it will require little land acquisition. I honestly can't imagine how it would come close to even half that price.
     
     
  #5951  
Old Posted Feb 18, 2015, 3:23 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by Innsertnamehere View Post
smart track will likely be too infrequent to cannibalize too much ridership from the subway.

Also, no way in hell smart track ends up costing $8 billion. GO transit is already talking about building out and electrifying their entire 400+km network for $8-10 billion, why one 50km line sharing a lot of infrastructure that GO is already planning will cost just as much leaves me mystified. are they planning to plate the trains in gold or something?
Doesn't the SmartTrack plan include a subway tunnel on Eglinton West off the GO network? That would jack up the price...

I feel like SmartTrack, because it's basically the province's GO RER plan but with more stations in the 416 & TTC fares, will just end up as the City of Toronto contributing funds to GO RER to add more stations and fare integration.
     
     
  #5952  
Old Posted Feb 18, 2015, 11:58 PM
miketoronto miketoronto is offline
Registered User
 
Join Date: Jul 2001
Location: Toronto, Ontario, Canada
Posts: 9,932
Quote:
Originally Posted by caltrane74 View Post
But with fare integration and frequent service, they will cannibalize each others ridership.

We'll see how it plays out.
Not everyone taking rapid transit in Scarborough is headed to the Union Station area.
For many, the subway would still be the preferred option for travel to the UofT, Yonge & Bloor, and points in the east end along the subway.
Not to mention SmartTrack will not be at STC where all the buses converge.
__________________
Miketoronto
     
     
  #5953  
Old Posted Feb 19, 2015, 12:42 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is online now
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,833
Smart tracks 15 minute frequencies also mean that most of its time savings from speed will be wasted by people sitting on the platform waiting for the train to show up.
     
     
  #5954  
Old Posted Feb 19, 2015, 1:25 AM
miketoronto miketoronto is offline
Registered User
 
Join Date: Jul 2001
Location: Toronto, Ontario, Canada
Posts: 9,932
Lets give a big cheer to Brampton Transit.

In 2014 Brampton Transit surpassed 20 million riders.
__________________
Miketoronto
     
     
  #5955  
Old Posted Feb 19, 2015, 11:58 PM
hipster duck's Avatar
hipster duck hipster duck is online now
Registered User
 
Join Date: Oct 2014
Location: Toronto
Posts: 4,870
Quote:
Originally Posted by miketoronto View Post
I guess Paris, London, Berlin, Milan, and other world cities have wasted billions building regional rail and subway lines next to each other?

Should we tell London to stop building Crossrail, because it is too close to other subway lines? And don't use the density excuse, because that is just that, an excuse.

The two lines will serve different travel purposes.
You're comparing apples and oranges.

For starters, most European cities didn't build RER-type lines from scratch. They were incremental improvements to existing lines, many of which were multi-tracked, grade-separated and electrified to begin with. Much of what we know of as the RER was basically differently-branded suburban service. All they had to do was add some ticketing machines and print some lines on a map and voila.

This is quite a bit different from SmartTrack, where you have to take a single track, diesel rail line built for occasional freight haulage with grade crossings and turn it into something resembling rapid transit.

Secondly, it's not the density of these European cities - it's how they have been oriented to transportation systems. Dense or not, Scarborough is completely car-oriented. You have 4 lane arterial roads with left turn lanes every 1 km on a grid and every commercial and residential unit comes with parking standards. Find me a European city that's built like that. Not only does it make transit difficult, it makes urban village-style densification around transit lines nearly impossible.

Finally, for most people in Scarborough, SCC is not a destination in itself, but a transfer point for buses originating in the north and east to the rapid transit system. In that sense, the "need" to serve SCC with heavy rail subway is not a given. You could just as easily have buses from north of the 401 transfer to SmartTrack at Agincourt station, or closer to Finch, and you could have buses from south of the 401 transfer to a mega-station at Kennedy (SmartTrack + subway + Eglinton Crosstown LRT + SCC LRT). The remaining service that needs to go to SCC because it needs to serve that area could easily be handled by LRT (the current RT handles less than the King streetcar).

I really think that two, parallel heavy rail systems - one of which is a bonafide subway traveling underground through the suburbs - is complete overkill for this area.
     
     
  #5956  
Old Posted Feb 20, 2015, 1:27 AM
caltrane74's Avatar
caltrane74 caltrane74 is offline
gettin' rich!
 
Join Date: Aug 2002
Location: Toronto
Posts: 34,204
A nice map from www.walkerweb.ca

     
     
  #5957  
Old Posted Feb 20, 2015, 1:49 AM
travis3000's Avatar
travis3000 travis3000 is offline
Registered User
 
Join Date: Dec 2012
Location: Simcoe County, ON
Posts: 6,506
^ Hahaha yes we can only dream. That map looks perfect.
     
     
  #5958  
Old Posted Feb 20, 2015, 2:41 AM
333609543's Avatar
333609543 333609543 is offline
Registered User
 
Join Date: Jun 2013
Location: Toronto
Posts: 284
That has *Nothing* on my map.

By me
Link
Other link
Made using: http://beno.org.uk/metromapcreator/#
     
     
  #5959  
Old Posted Feb 24, 2015, 1:18 PM
SkahHigh's Avatar
SkahHigh SkahHigh is offline
More transit please
 
Join Date: Jul 2013
Location: Montreal
Posts: 3,794
From yesterday's city council, we have a few more informations concerning the South Shore LRT which will run on the new Champlain Bridge:
- The LRT will porbably be at ground level
- Entering Downtown, it will run on either Peel Street or Robert-Bourassa Blvd (replacing the elevated Bonaventure Expressway)
- The Caisse will decide the final route of the project in the next 6 months following approval from the Provincial Assembly
     
     
  #5960  
Old Posted Feb 25, 2015, 1:23 PM
SignalHillHiker's Avatar
SignalHillHiker SignalHillHiker is offline
I ♣ Baby Seals
 
Join Date: Jul 2012
Location: Sin Jaaawnz, Newf'nland
Posts: 36,272
Just read on BBC that Edmonton is adding a 7-km freeze way through the city for commuters to skate to work during the winter months. That's cool.
__________________
Note to self: "The plural of anecdote is not evidence."
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 2:49 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.