Quote:
Originally Posted by hipster duck
I'd rather see money go to transit than prisons, but building a heavy rail SmartTrack about 3 km to the east of another heavy rail Scarborough subway line seems like the biggest waste of transit money in Canadian history.
|
Not really. There's one critical way that SmartTrack/RER and the Scarborough subway differ: the former does not serve Scarborough Centre (instead going a few km away from it), while the latter does. And given that RER is 15 minute frequency whereas existing service to STC is every 5 or something like that, something beyond RER will be needed for STC.
The cost of the Scarborough subway could possibly be reduced by having it follow the current RT corridor instead. Maybe the savings could then be directed to extending the Eglinton line east to meet up with the Lakeshore RER? Does that work?