Originally Posted by bigstick
Seems like the Piedmont Tower went up pretty quick???
|
It's a bit deceiving. While outwardly the Piedmont Tower looks nearly finished, internally work will continue on the lower floors until 2022 and will continue on the upper floors for the next +/-7 years
"Until 2022, the top six stories will remain vacant. From 2022 through 2026, the upper floors will be built out, adding 276 additional beds—for a total of 408 beds and 10 operating rooms."
Given this building started in 17', you're talking about a decade timeline. Hospitals are complicated beasts: zoned HVAC, plumbing, high electrical loads, specialty equipment, gasses, etc etc. All these extra fixtures and features add complication, cost, and time. Another interesting tidbit that puts hospital's into perspective:
"A hospital rep sends this clarification regarding the building, which helps to explain its visibility from afar: “It’s 225 feet, which is built to the maximum allowed by city zoning rules for that particular neighborhood and that side of the street in Atlanta. And while 16 stories might not seem like a lot, hospital floors are considerably larger than residential floors. If it weren’t a hospital building, it would be more like 25 floors.”
https://atlanta.curbed.com/2019/3/22/18276824/buckhead-piedmont-medical-tower-vertical-construction