HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates


Reply

 
Thread Tools Display Modes
     
     
  #21  
Old Posted Mar 18, 2023, 11:06 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,190
Reply With Quote
     
     
  #22  
Old Posted Mar 19, 2023, 3:52 PM
inimrepus inimrepus is offline
Registered User
 
Join Date: Jan 2017
Location: Earth
Posts: 175
Was this one of the buildings that they were supposed to keep and renovate?
Reply With Quote
     
     
  #23  
Old Posted Mar 19, 2023, 4:57 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,190
Yes the Rec Centre building apparently.



Quote:
Originally Posted by inimrepus View Post
Was this one of the buildings that they were supposed to keep and renovate?
Reply With Quote
     
     
  #24  
Old Posted Mar 19, 2023, 10:16 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,293
Here is a CTV article from tonight regarding the heritage aspect of this: https://london.ctvnews.ca/mobile/we-re-l...ted-by-fire-cannot-be-salvaged-1.6319862

Article (and the 6pm news broadcast tonight) strangely mentions that York Developments is the property owner. I thought that it was just Old Oak that owns the entire property. Can anybody confirm this?

Quote:
York Developments, the property owner, has faced criticism in the past for failing to properly secure vacant buildings, as they move to build multiple high-rise towers at the site.
Reply With Quote
     
     
  #25  
Old Posted Mar 19, 2023, 10:57 PM
Djeffery's Avatar
Djeffery Djeffery is offline
Registered User
 
Join Date: Oct 2017
Location: London
Posts: 6,262
CTV Weekend crew at its best lol
Reply With Quote
     
     
  #26  
Old Posted Mar 19, 2023, 10:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,190
I think York Demolition is the demolition company hired to clear the old buildings and prep the site. Old Oak is still the owner as far as I know.
Reply With Quote
     
     
  #27  
Old Posted Mar 22, 2023, 9:06 AM
DemoJunkie DemoJunkie is offline
Registered User
 
Join Date: Mar 2023
Location: London
Posts: 1
I figured this was a good place to start for my first post on this forum. I worked for Delsan-AiM, the demo contractor who demolished the north complex as well as the 7 out buildings, and now work for York1, who is demolishing the remainder of the main hospital.

Old Oak is the developer, despite what CTV said, they have since fixed their error in regards to who owns the property. York1 is the demolition contractor, that is it.

As far as the project goes, the entire building requires asbestos, Lead, mould, Mercury, and PCB abatement, and that is what the interior crews do prior to structural demo. There is nothing left to salvage inside as the scavengers have had years to strip the building top to bottom.

The south complex is slated to be fully demolished in the coming weeks, and the abatement of the full hospital and any other parts of York1s scope is supposed to be completed by summertime. Full demo so the site is ready to hand back to Old Oak will be completed sometime in the late summer early fall if all goes well.

As for the CTV article, we were requested to have our excavators ready on Sunday in case the Fire Dept needed them, myself and the other operator sat around until 11:30ish Sunday before we were finally released without ever touching the Rec Hall.

If anyone has any other questions, feel free to ask and I will answer as much as I can without divulging too much.
Reply With Quote
     
     
  #28  
Old Posted Mar 29, 2023, 5:38 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,190
The south wing complex is now fully down. Lot's of rubble to sort thru and process.
Reply With Quote
     
     
  #29  
Old Posted Mar 29, 2023, 5:48 PM
MolsonExport's Avatar
MolsonExport MolsonExport is online now
Touching grass everyday.
 
Join Date: Oct 2003
Location: Otisburgh
Posts: 51,251
Quote:
Originally Posted by DemoJunkie View Post
I figured this was a good place to start for my first post on this forum. I worked for Delsan-AiM, the demo contractor who demolished the north complex as well as the 7 out buildings, and now work for York1, who is demolishing the remainder of the main hospital.

Old Oak is the developer, despite what CTV said, they have since fixed their error in regards to who owns the property. York1 is the demolition contractor, that is it.

As far as the project goes, the entire building requires asbestos, Lead, mould, Mercury, and PCB abatement, and that is what the interior crews do prior to structural demo. There is nothing left to salvage inside as the scavengers have had years to strip the building top to bottom.

The south complex is slated to be fully demolished in the coming weeks, and the abatement of the full hospital and any other parts of York1s scope is supposed to be completed by summertime. Full demo so the site is ready to hand back to Old Oak will be completed sometime in the late summer early fall if all goes well.

As for the CTV article, we were requested to have our excavators ready on Sunday in case the Fire Dept needed them, myself and the other operator sat around until 11:30ish Sunday before we were finally released without ever touching the Rec Hall.

If anyone has any other questions, feel free to ask and I will answer as much as I can without divulging too much.
Thanks for the info, and welcome to the forum
__________________
The whole problem with the world is that fools and fanatics are always so certain of themselves, and wiser people so full of doubts. (Bertrand Russell). Sweet Loretta fart thought she was a cleaner, but she was a frying pan. (John Lennon)
Reply With Quote
     
     
  #30  
Old Posted May 13, 2023, 4:45 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,190
The lecture hall theatre that fronted Highbury is now demolished. Alot of debris sorting and processing still going on for the south wing rubble.
Reply With Quote
     
     
  #31  
Old Posted Jul 23, 2023, 5:45 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,190
They have brought in a extended boom excavator with the demolition claw to start taking down the central hospital tower. They have started on the east end of the building. They have also setup a concrete crusher machine and conveyor and are working thru the mounds of concrete and brick. No indications yet that Old Oak has received approval of their draft sub division plan from City Hall. They haven't started yet on building the storm water management pond in the SE corner either. There are years of site prep still ahead before any new buildings start going up. The economy and financial situation may be very different in a few years.
Reply With Quote
     
     
  #32  
Old Posted Jul 28, 2023, 11:41 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,190
Reply With Quote
     
     
  #33  
Old Posted Aug 15, 2023, 3:28 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,190
Have got about half the central tower down now. Taking it slow and easy likely for safety reasons. They will be working for many months to clear the crushed concrete and brick and sort the steel.
Reply With Quote
     
     
  #34  
Old Posted Aug 25, 2023, 4:07 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,190
Milestone this week with the centre tower of the LPH Hospital now taken down. Will likely be months of work to dig out the basement foundations and crush and sort all the concrete and steel and remove it. Likely they will backfill the hole until such time that Old Oaks gets around to starting construction on future high rise towers.
Reply With Quote
     
     
  #35  
Old Posted Nov 9, 2023, 4:46 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,190
Interesting that the demolition company was loading up the heavy equipment onto flatbed trailers and appear to be done with their work leaving behind small mountains of crushed concrete and brick. A few hours later they were unloading the heavy machines at the Landlords former LFP office on York Street. Could there have been a demolition permit approved for the former LFP offices? There is still signage up for Lease for Sale. Maybe the "landlord" has decided to demolish the building to create a large surface parking lot?
Reply With Quote
     
     
  #36  
Old Posted May 21, 2024, 4:38 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,293
The zoning changes that will allow for the revitalization of the old hospital lands will be discussed at the July 16th planning committee meeting and then at the July 23rd council meeting.

https://london.ca/sites/default/files/2024-05/T21503-OPA-ZBA-DPSCombinedRevNotice.pdf

Last edited by CanadianTalk; May 21, 2024 at 5:44 PM.
Reply With Quote
     
     
  #37  
Old Posted May 21, 2024, 5:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,190
Not sure why they are arbitrarily limiting heights to 22s today in 2024 when in 10-20 years those blocks at 22s makes no sense and some of the buildings should be 30s plus tall. The construction of these lands will definitely take at least 20 years to be built out and the needs for more density along a BRT line will dictate the increase in height.


I would not be shocked that Fanshawe College takes over the Robarts School for the Deaf property in the next 20 years for future expansion. The demand for residential density in the Highbury and Oxford area will be very high.
Reply With Quote
     
     
  #38  
Old Posted May 22, 2024, 3:26 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,293
Here is a subdivision plan which shows how the site will be divided into blocks/zones/streets. The colours represent the following zones:
  • orange - high density mixed-use
  • purple – medium density residential
  • pink – medium density mixed-use
  • yellow – low density residential
  • red – neighbourhood facility (ie: school, community centre) OR residential
  • blue – heritage blocks (you can actually see the outlines of the old buildings)
  • green – open space / parkland / stormwater management pond

The numbers are the maximum heights that buildings can be in that particular block.


Last edited by CanadianTalk; May 22, 2024 at 3:42 PM.
Reply With Quote
     
     
  #39  
Old Posted May 22, 2024, 3:38 PM
GreatTallNorth2 GreatTallNorth2 is offline
Registered User
 
Join Date: May 2006
Posts: 1,752
I am happy to see that kind of density. London does not have a lot of that "missing middle" and so having some buildings in the 4-6 floor range is fine. I like that there is a decent amount of "mixed use" as well - meaning you can shop right in your neighbourhood, hopefully similar to West 5.
Reply With Quote
     
     
  #40  
Old Posted Jul 25, 2024, 2:01 AM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,190
New revised zoning plan with changes to height and density.

https://london.ca/sites/default/files/2024-07/T21503-OPA-ZBA-DPSCombinedRevNotice1.pdf

Key changes:

Key changes to the previously circulated proposed zoning include increasing the maximum
permitted heights from 42m (12 storeys), 54m (16 storeys), and 75m (22 storeys) to 80m (25
storeys) and 92m (30 storeys) on blocks fronting Highbury Avenue North and Oxford. The
maximum permitted densities on these blocks are also proposed to be increased from 250,
300, and 320 units per hectare to 350, 410, 440 and 560 units per hectare. In addition the
previously proposed R9-7 special provision zone requested for medium density residential
blocks in the southeast portion of the plan, has been replaced with an R8-4 special provision
zone with similar height and density special provisions.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 6:06 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.