Quote:
Originally Posted by 0773|=\
If you look at the plan, the over head walkway is at the far right end, next to the existing terminal, you can quickly see the vantage point of the rendering with a walkway in it.
|
Right... I get it now. All arrivals will walk along the perimeter of the building (as shown in the departure diagram kindof, walk down those stairs/escalator, under the departures bridge, and then to the baggage claim (as shown in the departure section).
EDIT2:
From what EdmTrekker said:
Quote:
|
I am not a designer but have taken 500+ flights at airports around the globe and have not seen double loading corridors from the dept gates to the aircraft with 4 walls (space in the middle). Surely 4 walls with a glass divider running the middle (in between) is cheaper than 4 external walls (build, heat,maintain) - knowing this may be identified in the VE sessions.
|
The inbetween space is a ramp headed down to the arrivals corridor (in white, which loops the perimeter of the building) I just identified above. So It is essential one solid extension. This is fairly common, and exists in plenty of airports.
So with the whole extension being dedicated to US/Intl., does that mean the whole old expansion goes domestic?
EDIT: I thought the old tower was coming down for expansion of the arrivals/departure lanes?