Quote:
Originally Posted by M00dy
Any new tunnel is going to be bored. They will not be allowed to dredge and submerge a tunnel similar to the original, and even if they could, it would not be seismically stable in liquifiable soils.
|
The Report says they are still examining an immersed tub tunnel (ITT) for a new supplemental tunnel.
They convened a panel to examine the issues.
Regarding a bored tunnel, they said it would be the most expensive option and may not have feasible grades
with the depth to get below liquefiable soils between the 17A and Stevston interchanges (and moreso for stacked lanes inside the tubes)
New 6 lane tunnel and retrofitted existing tunnel
- could be 10 lanes total, but they'd probably make one lane a bike path.
… and the Report rejects further consideration of a bored tunnel:
https://engage.gov.bc.ca/app/uploads/sit...g_Independent-Technical-Review_FINAL.pdf