Quote:
Originally Posted by bomberjet View Post
Still early days on the PTH 59/52 twinning. At least some news on the project continuing to move forward. Thanks for sharing the update.
Although construction is at least 4 years away, I'm really hoping this will be the time that 59 and 52 get twinned. They've been contemplating that for more than 20 years already and nothing yet. Hopefully next year they will release the design drawings to EngageMB.
Reply With Quote
     
     
  #3302  
Old Posted Mar 4, 2026, 8:54 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,233
The fact they're doing the study is great. But the Province has been considering doing many things for decades upon decades lol. So as usual I'll take the approach of until dirt is being moved, it aint happening lol
Reply With Quote
     
     
  #3303  
Old Posted Mar 5, 2026, 2:22 AM
Carboy15's Avatar
Carboy15 Carboy15 is offline
CanAutoroute1
 
Join Date: Oct 2022
Location: Centerville of Canada
Posts: 594
Quote:
Originally Posted by bomberjet View Post
The fact they're doing the study is great. But the Province has been considering doing many things for decades upon decades lol. So as usual I'll take the approach of until dirt is being moved, it aint happening lol
Totally. It's like this with most projects. They plan to do it, do a study, and they forget about it afterward. Highway 59 has been head on traffic for years already. Kind of disappointing they didn't add any passing lanes as a temporary measure to keep traffic moving.

Highway 52 is probably more dangerous because its on a correction line. Therefore lots of access points will have to be consolidated. There too, they could've started by adding service roads to improve local access to businesses and acreages. It will obviously be done when twinning starts. Thankfully the distance between the road and the houses are further apart, so service roads could easily be installed with a twinned roadway.
Reply With Quote
     
     
  #3304  
Old Posted Mar 5, 2026, 9:20 PM
Carboy15's Avatar
Carboy15 Carboy15 is offline
CanAutoroute1
 
Join Date: Oct 2022
Location: Centerville of Canada
Posts: 594
I am curious what twinning will come first? Highway 59 North from Scanterbury to Highway 12? Or Highway 59 and 52?

I feel like Highway 59 and 52 should come first due to commuter traffic. And Highway 12 and 1 (fromn Steinbach to Winnipeg) are outgrowing their capacity. But going towards Grand Beach Highway 59 is mostly seasonal traffic. But maybe once roads get built to go to the Northern Reserves (say St Theresa Point), Highway 59 won't just be a seasonal route, it will have some real connection purpose.
Reply With Quote
     
     
  #3305  
Old Posted Mar 5, 2026, 9:38 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,233
Which one has higher traffic counts? Which one has more safety incidents. That is the one.

Personal opinion. 59 to the grand beach turnoff should've been twinned decades ago.
Reply With Quote
     
     
  #3306  
Old Posted Mar 6, 2026, 8:12 PM
Carboy15's Avatar
Carboy15 Carboy15 is offline
CanAutoroute1
 
Join Date: Oct 2022
Location: Centerville of Canada
Posts: 594
https://www.steinbachonline.com/articles/roundabout-construction-scheduled-for-this-year

Great that we're finally getting a roundabout at 206 @ 311. Local traffic has increased on 311, but it also doubles down as a Bypass for Highway 52 which is outgrowing its capacity. So really if we need a roundabout on a secondary Highway and the primary roads lack modern upgrades, it's a sign that it is needed.
Reply With Quote
     
     
  #3307  
Old Posted Mar 10, 2026, 6:39 AM
bryan_ca bryan_ca is offline
Registered User
 
Join Date: Sep 2022
Posts: 26
You rarely see a post about Manitoba roads on social media, so I'm reposting it. Not sure whether the guy's data regarding the Ontario road closures is accurate. I'm sure he'll be happy when Manitoba twins its remaining short segment, as will we all.

https://www.facebook.com/reel/1239167345031366
Reply With Quote
     
     
  #3308  
Old Posted Mar 11, 2026, 9:52 PM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 1,062
Quote:
Originally Posted by bomberjet View Post
Which one has higher traffic counts? Which one has more safety incidents. That is the one.

Personal opinion. 59 to the grand beach turnoff should've been twinned decades ago.
59 from 210 to 52 should have also been twinned decades ago. AADT between 210 and 52 on 59 is more than double of the traffic to the beaches. I know there's huge seasonality to it, with summer Friday afternoons or Sunday evenings on 59 by the beaches is probably much worse, but on average 59 south of Winnipeg is probably the bigger problem.

https://www.gov.mb.ca/mti/traffic/mhtis/flowmap_2023.pdf

I know the province has talked twinning, and we've generally focused on twinning 59 towards the beaches in this forum. But do we feel the province could get away with 2+1 the whole distance between Brokenhead and the Grand Beach turnoff (or even Albert Beach)?

The AADT of that stretch is similar to highway 16 where that 2+1 was successfully implemented. It massively reduces ROW and expropriation needs, which means lower costs, so timelines don't have to be some distant thought. It might not be sufficient for Friday afternoon or Sunday evening summer traffic, but may reduce the amount of people making a risky pass at those times when they've lost patience with an RV going 80km/h.

Assuming it's sufficient, it'll probably be an adequate solution for a long time. A lot of the land up there is protected from development, and there isn't anything massive development happening, unlike southeast Manitoba that has been booming and seems to be continuing in that direction for the foreseeable future
Reply With Quote
     
     
  #3309  
Old Posted Mar 12, 2026, 5:13 AM
Carboy15's Avatar
Carboy15 Carboy15 is offline
CanAutoroute1
 
Join Date: Oct 2022
Location: Centerville of Canada
Posts: 594
Quote:
Originally Posted by WildCake View Post
59 from 210 to 52 should have also been twinned decades ago. AADT between 210 and 52 on 59 is more than double of the traffic to the beaches. I know there's huge seasonality to it, with summer Friday afternoons or Sunday evenings on 59 by the beaches is probably much worse, but on average 59 south of Winnipeg is probably the bigger problem.

https://www.gov.mb.ca/mti/traffic/mhtis/flowmap_2023.pdf

I know the province has talked twinning, and we've generally focused on twinning 59 towards the beaches in this forum. But do we feel the province could get away with 2+1 the whole distance between Brokenhead and the Grand Beach turnoff (or even Albert Beach)?

The AADT of that stretch is similar to highway 16 where that 2+1 was successfully implemented. It massively reduces ROW and expropriation needs, which means lower costs, so timelines don't have to be some distant thought. It might not be sufficient for Friday afternoon or Sunday evening summer traffic, but may reduce the amount of people making a risky pass at those times when they've lost patience with an RV going 80km/h.

Assuming it's sufficient, it'll probably be an adequate solution for a long time. A lot of the land up there is protected from development, and there isn't anything massive development happening, unlike southeast Manitoba that has been booming and seems to be continuing in that direction for the foreseeable future
Agreed. Highway 59 between 210 and 52, along with 52 itself should've been twinned decades ago. I jokingly say that they're numbered correctly because 59 and 52 indicites by how many years the Highways are out of date. Those areas just can't cop out anymore by doing a 2+1 Highway.

59 between Scanterbury South through the reserve to maybe a KM North of Bear Rd could be a divided 4-lane Highway. Within the reserve between the two signalized Intersections could be a narrow Boulevard with a raised median, which would make sense for traffic calming and pedestrian safety. Scanterbury North and Victoria Beach could get away with being a 2+1 the whole length with divided major Intersections.
Reply With Quote
     
     
  #3310  
Old Posted Mar 12, 2026, 10:23 AM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,674
Quote:
Originally Posted by bryan_ca View Post
You rarely see a post about Manitoba roads on social media, so I'm reposting it. Not sure whether the guy's data regarding the Ontario road closures is accurate. I'm sure he'll be happy when Manitoba twins its remaining short segment, as will we all.

https://www.facebook.com/reel/1239167345031366
That said, I don’t know whether he’s aware that divided highways in the Interior Plains also get closed during winter when the snow blows hard, too.
__________________
My Proposal of TCH Twinning in Northern Ontario
Disclaimer: Most of it is pure pie in the sky, so there's no need to be up in the arm about it.
Reply With Quote
     
     
  #3311  
Old Posted Mar 17, 2026, 4:42 PM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,513
interesting video on the winter roads from local lynn lake

Video Link
Reply With Quote
     
     
  #3312  
Old Posted Mar 18, 2026, 5:48 AM
Carboy15's Avatar
Carboy15 Carboy15 is offline
CanAutoroute1
 
Join Date: Oct 2022
Location: Centerville of Canada
Posts: 594
https://www.brandonsun.com/local/2026/03/13/dauphin-urges-province-to-reroute-highway

Looks like Dauphin wants Hwy 5A and 10A reroutes 1 block South (1st Ave NW).
Reply With Quote
     
     
  #3313  
Old Posted Mar 18, 2026, 2:34 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,856
The Province issued a Notice of Proposed Procurement for the Twinning of Hwy 1 though the Whiteshell. It sounds by the wording that they may have selected the twinning of the existing route.

The Project overview has a line that reads "Reconstruction of two interchanges - Falcon Lake Townsite/Ranch Access and PTH 44, and one flyover of PR 301".

The timeline reads:
2026 - Consultations and Prelim Design
2027 - Detailed Design
2029 - Minor preparatory work
2030 - Construction Start
2034 - Completion
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
Reply With Quote
     
     
  #3314  
Old Posted Mar 18, 2026, 3:57 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,233
Nice.
Reply With Quote
     
     
  #3315  
Old Posted Mar 18, 2026, 4:22 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,233
"The estimated project value is greater than $500M."

So along the lines of what I've bene hearing.
Reply With Quote
     
     
  #3316  
Old Posted Mar 18, 2026, 4:30 PM
Mr Tall Forehead's Avatar
Mr Tall Forehead Mr Tall Forehead is online now
Registered User
 
Join Date: Jul 2024
Location: Winnipeg
Posts: 831
Curious to know what the plans are for Barren Lake if they do keep the same alignment. There really isn't a lot of wiggle room.
Reply With Quote
     
     
  #3317  
Old Posted Mar 18, 2026, 4:31 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,233
I don't see any other way than building in the lake. They could re-align PR 301 and try to squeeze it southward. But even then, seems like they'll be in the lake.
Reply With Quote
     
     
  #3318  
Old Posted Mar 18, 2026, 4:37 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,233
PTH 101 Functional Design Report posted to the project information website.
https://www.gov.mb.ca/mti/projects_manag...er_functional_design_project_summary.pdf

No substantial change to the recommended options from before. Sequencing though is added.

As expected its basically Pipeline, then Dugald. Then it's the major project of McPhillips through Henderson. $1 billion project.

Good news as this is the last step in the process. Now for funding.


Last edited by bomberjet; Mar 18, 2026 at 4:48 PM.
Reply With Quote
     
     
  #3319  
Old Posted Mar 18, 2026, 5:33 PM
Winnipeg Grump's Avatar
Winnipeg Grump Winnipeg Grump is offline
Registered User
 
Join Date: Nov 2015
Location: Winnipeg
Posts: 691
Quote:
Originally Posted by bomberjet View Post
PTH 101 Functional Design Report posted to the project information website.
https://www.gov.mb.ca/mti/projects_manag...er_functional_design_project_summary.pdf

No substantial change to the recommended options from before. Sequencing though is added.

As expected its basically Pipeline, then Dugald. Then it's the major project of McPhillips through Henderson. $1 billion project.

Good news as this is the last step in the process. Now for funding.

Hopefully someone at the province learns to run their docs through a spell-check prior to publishing them.
Reply With Quote
     
     
  #3320  
Old Posted Mar 18, 2026, 7:26 PM
BorealLynx BorealLynx is offline
Registered User
 
Join Date: Aug 2025
Location: Kenora, ON
Posts: 50
Quote:
Originally Posted by Biff View Post
The Province issued a Notice of Proposed Procurement for the Twinning of Hwy 1 though the Whiteshell. It sounds by the wording that they may have selected the twinning of the existing route.

The Project overview has a line that reads "Reconstruction of two interchanges - Falcon Lake Townsite/Ranch Access and PTH 44, and one flyover of PR 301".

The timeline reads:
2026 - Consultations and Prelim Design
2027 - Detailed Design
2029 - Minor preparatory work
2030 - Construction Start
2034 - Completion
Does this suggest whether the project would be done all at once or in stages?
__________________
NOW is the time for a National Highways strategy for Canada.
One Trans-Canada Highway, federally funded, 4-lane "Interstate" quality, from coast to coast.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 4:51 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.