  #301  
Old Posted May 3, 2023, 5:49 PM
DTcrawler DTcrawler is online now
Registered User
 
Join Date: Feb 2019
Location: Ottawa
Posts: 756
Quote:
Originally Posted by Harley613 View Post
I just drove by...they are officially digging!!! If this is indeed a 99 metre 30 story building, it's going to make an amazing impact on the skyline as it really fills a gap!
As much I would love a 30 storey building on this site, I have a very strong feeling the design is going to be downgraded so drastically that we wish it would be less visible, kind of like 1960 Scott and that Trinity garbage at Rideau/Chapel.
Reply With Quote
     
     
  #302  
Old Posted May 3, 2023, 6:45 PM
RideauRat RideauRat is offline
Registered User
 
Join Date: Mar 2019
Posts: 171
Quote:
Originally Posted by DTcrawler View Post
As much I would love a 30 story building on this site, I have a very strong feeling the design is going to be downgraded so drastically that we wish it would be less visible, kind of like 1960 Scott and that Trinity garbage at Rideau/Chapel.
I don't know about that, it's kind of hard to eff this design up. straight lines, no staggered platforms or unique forms and uniform and consistent pattern.

I think the make or break it, boils down to materials.


[edit: okay it can be effed up, but to the point of scott street and story of w.e? I'm doubtful]
Reply With Quote
     
     
  #303  
Old Posted May 3, 2023, 6:49 PM
DTcrawler DTcrawler is online now
Registered User
 
Join Date: Feb 2019
Location: Ottawa
Posts: 756
Quote:
Originally Posted by RideauRat View Post
I don't know about that, it's kind of hard to eff this design up. straight lines, no staggered platforms or unique forms and uniform and consistent pattern.

I think the make or break it, boils down to materials.
Agreed, but that's if they stick with the design from the most recent renders. Now that this is being built as rentals, I can't imagine why Claridge wouldn't change the design completely and build anything other than another than the charcoal/beige brick monstrosities they've been cloning all over the city. I'd love for them to prove me wrong.
Reply With Quote
     
     
  #304  
Old Posted May 3, 2023, 7:22 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,500
I don't see how the design could have changed! For a building this size they have to go through site plan approval and design review process. since we haven't seen new documents on DevApp since the conversion to rental I think they are building the exact same tower they were going to build as Condo.
Reply With Quote
     
     
  #305  
Old Posted May 3, 2023, 7:40 PM
DTcrawler DTcrawler is online now
Registered User
 
Join Date: Feb 2019
Location: Ottawa
Posts: 756
Quote:
Originally Posted by SL123 View Post
I don't see how the design could have changed! For a building this size they have to go through site plan approval and design review process. since we haven't seen new documents on DevApp since the conversion to rental I think they are building the exact same tower they were going to build as Condo.
Please forgive my ignorance but I actually didn't know they had to do that... still learning the nuances of the city's approval processes for highrises.

With the amount of bait and switch we seem to get, I just assumed that developers could build whatever they want after getting an initial design approved. Though now that I think about it more, we do at least see renders of the dumbed-down designs when they are submitted for approval.

Hoping they at least use decent materials for the approved-design.

Edit: Just to clarify, can Claridge re-submit the SPA for a design change while the building is U/C? I seem to recall something along those lines happening at the Met when the developer asked for a height increase while the building was already rising.
Reply With Quote
     
     
  #306  
Old Posted May 3, 2023, 7:49 PM
UrbOttawa UrbOttawa is offline
Registered User
 
Join Date: Oct 2014
Posts: 414
I could see them getting rid of the alternating balcony shapes and just having a consistent floor plate all the way up. Easier to build and wouldn't have any effect on the unit floor plans. I hope they keep the alternating though
Reply With Quote
     
     
  #307  
Old Posted Jun 15, 2023, 1:11 AM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,500
As anyone been near this site lately? Are they actually digging something or is the site idle lol
Reply With Quote
     
     
  #308  
Old Posted Jun 15, 2023, 1:18 AM
yotajoe yotajoe is offline
Registered User
 
Join Date: Jan 2019
Location: Ottawa
Posts: 150
Quote:
Originally Posted by SL123 View Post
As anyone been near this site lately? Are they actually digging something or is the site idle lol
They're digging, its pretty deep right now not sure how much deeper they need to go before pouring a crane base.
Reply With Quote
     
     
  #309  
Old Posted Jun 15, 2023, 1:57 AM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,500
Quote:
Originally Posted by yotajoe View Post
They're digging, its pretty deep right now not sure how much deeper they need to go before pouring a crane base.
Thanks for the update! Glad its happening! The lack of much action this winter/early spring had me worried it was just dead at this point.
Reply With Quote
     
     
  #310  
Old Posted Jun 15, 2023, 3:14 AM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,727
It will be pretty nifty if we get the same height and design as the previous condo approval here. I cross the Alexandra Bridge every morning and admire that burgeoning Western skyline. This will be a pretty awesome addition to it, a real gap filler.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #311  
Old Posted Jun 15, 2023, 6:26 AM
originalmuffins originalmuffins is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 875
Glad to see its still alive and going through
Reply With Quote
     
     
  #312  
Old Posted Jun 20, 2023, 6:12 PM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,727
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #313  
Old Posted Jun 20, 2023, 8:13 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,757
This one is going to take forever. I can feel it.
Reply With Quote
     
     
  #314  
Old Posted Jul 12, 2023, 10:10 PM
yotajoe yotajoe is offline
Registered User
 
Join Date: Jan 2019
Location: Ottawa
Posts: 150
Drive by today and I noticed the large excavator has been demobilized from site. I'm assuming excavation is pretty much complete.
Reply With Quote
     
     
  #315  
Old Posted Jul 12, 2023, 10:53 PM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,727
Quote:
Originally Posted by yotajoe View Post
Drive by today and I noticed the large excavator has been demobilized from site. I'm assuming excavation is pretty much complete.
I've got ya covered!

From yesterday:
__________________
Instagram: https://www.instagram.com/the.harleydavis/

Last edited by Harley613; Jul 12, 2023 at 11:20 PM.
Reply With Quote
     
     
  #316  
Old Posted Jul 12, 2023, 11:16 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,500
Nice to see significant progress after such a slow start! Feels like a really small footprint tho

Last edited by SL123; Jul 12, 2023 at 11:31 PM.
Reply With Quote
     
     
  #317  
Old Posted Jul 12, 2023, 11:58 PM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,727
Quote:
Originally Posted by SL123 View Post
Nice to see significant progress after such a slow start! Feels like a really small footprint tho
I wonder if they cut the parking in half when they changed to rental...
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #318  
Old Posted Jul 12, 2023, 11:58 PM
yotajoe yotajoe is offline
Registered User
 
Join Date: Jan 2019
Location: Ottawa
Posts: 150
Quote:
Originally Posted by Harley613 View Post
I've got ya covered!

From yesterday:
Thanks for the pics!

Looks like a crane pad getting dug on the right?
Reply With Quote
     
     
  #319  
Old Posted Jul 13, 2023, 12:26 AM
skyscraperaccount skyscraperaccount is offline
Registered User
 
Join Date: Jun 2023
Posts: 138
Quote:
Originally Posted by Harley613 View Post
I wonder if they cut the parking in half when they changed to rental...
Sure doesn't seem like 7 stories under grade per the Sept 2022 devapp.
Reply With Quote
     
     
  #320  
Old Posted Jul 13, 2023, 12:33 AM
skyscraperaccount skyscraperaccount is offline
Registered User
 
Join Date: Jun 2023
Posts: 138
There is an article here from Jun 2023 that include discussion of this building and is quoting Malhotra/Claridge...I assume this kind of site gives editorial control to the buiders so what they want said gets said.

Still showing the same tower design, 272 units, late 2024/early 2025 occupancy. Couldnt see any more info on the below grade.

https://allthingshome.ca/new-homes/a...91LGtwFAEndwsA

I think the Sept 2022 devapp shows 262 units...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & City of Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 4:26 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.