Quote:
Originally Posted by MalcolmTucker
In Lakeview I count less than 90 homes in an 85m corridor pushed right against the boundary, plus two phases of the apartments right at 37th and Glenmore. Plenty of homes loose back lane access, and part of their backyards, but the number even with those is below 200. Maybe 80 apartments on top of that.
To get to 500 homes he must be thinking a full corridor including the future hypothetical outer ring road.
A map with 85 m corridors:
http://maps.google.com/maps/ms?ie=UTF8&h...820091103928423336.00049d0d11b5f061fc7ee
Depends where and what we are asking it to do. Certainly I wouldn't want to just add a lane to Glenmore and 14th St and call it a day. Cars aren't bad in and of themselves, and stopping the project won't eliminate the trips that this project is destined to serve.
|
I was doing some more thinking of the 37th St alignment, and it occurred to me that if the tunnels were built using a TBM machine, the western tunnel (for southbound traffic) could be built entirely under the 37th St ROW and the eastern tunnel (for northbound traffic) could be built under the existing housing along the east side of 37th St. (after the appropriate legalities are taken care of). With this concept, it's doubtful any houses would need to be expropriated & demolished.
The new SkyTrain in Vancouver was built through the downtown core using a TBM machine starting from the south side of False Creek, and there is a curved section of tunnels (between Yaletown Stn and Vancouver City Centre Stn for those of you who know the area) that pass under existing condo towers and office towers.
Tunneling under houses isn't without risk, but when there is 100 to 150 feet of earth between your basement and the tunnel, would you even know it's there? I suspect the property owners would rather have a tunnel 100+ feet below them than be kicked off their property. And the homeowners facing the prospect of their back alley becoming the edge of a freeway would also support a TBM tunnel built this way.
The construction pits would need to temporarily use some of the park space at the SE corner of 37th @ Glenmore during construction, but when the tunnels are finished the construction pits would be covered over (or filled in again) and the park re-landscaped.
An alternative location for the construction pits would be at the open space where Southland Dr would extend west to 37th St. From these pits, the TBM tunnels would be dug out north to Glenmore.
With the construction pits located here, a temporary construction road could be built north from Anderson Rd @ 37th St so the construction traffic could use Anderson Rd, or the construction traffic could bypass most of the communities by using the existing 37th St south from Anderson to 22x, then east to connect with MacLeod, Deerfoot or the SERR (which would likely be finished by the time SWRR construction gets going). This may be preferred to get construction traffic separated from regular traffic.
At the final stages of SWRR construction, this temporary construction road would be rebuilt as the SWRR so the 37th St tunnel and the western extension of Southland Dr. can connect to 37th St @ Anderson Rd.