HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #2721  
Old Posted Mar 19, 2010, 2:58 AM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
We're a little (?) off-topic for this thread, but it's an interesting discussion...

I was wondering if the best way to get "rail to the valley" would be to build a commuter rail line mostly along the Hwy 1 right-of-way. It would deviate from Hwy 1 to pass closer to the town centres of Chilliwack, Abby, Langley, and Surrey, but would return to the highway in between them.

I saw a HSR line being built alongside a freeway in Greece, and it seemed to be an effective way to build it. All of the overpasses were just extended to cross over the rail line. Obviously HSR was a little more complicated since the curves had to be shallower than those of the freeway.

Any rail line out through the valley will have to terminate in Surrey, I think. Surrey is supposed to become this huge metropolitan core of the valley, and Surrey is already connected to the rest of Metro Vancouver by a form of rapid transit. I just can't see anyone paying for yet another commuter rail crossing of the Fraser, on top of the SkyBridge and Canada Line bridge - unless perhaps the line crosses the Fraser on the new Port Mann bridge.

Actually, I wonder if the Golden Ears Bridge was built to be compatible with future rail?
     
     
  #2722  
Old Posted Mar 19, 2010, 4:31 AM
racc racc is offline
BANNED
 
Join Date: Oct 2008
Posts: 1,241
Quote:
Originally Posted by Zassk View Post

Any rail line out through the valley will have to terminate in Surrey, I think. Surrey is supposed to become this huge metropolitan core of the valley, and Surrey is already connected to the rest of Metro Vancouver by a form of rapid transit. I just can't see anyone paying for yet another commuter rail crossing of the Fraser, on top of the SkyBridge and Canada Line bridge - unless perhaps the line crosses the Fraser on the new Port Mann bridge.

Actually, I wonder if the Golden Ears Bridge was built to be compatible with future rail?
The New West rail bridge is 100 years old and will need replacing sooner or later. There has been some talk of including rail on the replacement for the Pattullo instead of building a new rail bridge.
     
     
  #2723  
Old Posted Mar 19, 2010, 5:48 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Mayors fear province will create new tax for Translink.
Source: http://www.theglobeandmail.com/news/nati...te-new-tax-for-translink/article1505216/
     
     
  #2724  
Old Posted Mar 19, 2010, 6:02 AM
idunno idunno is offline
Registered User
 
Join Date: Feb 2010
Posts: 939
I wouldn't say the North Shore is exactly begging for rail transit, so the issue of NIMBYism isn't really as much of a factor compared to other areas (Point Grey?). The bus service on the north shore is pretty good right now, but in the future I guess an LRT on marine drive would be nice. Also something up Lower Lonsdale (probably the first priority). Either way those kinds of projects are far away in a time where the NS is a lot denser than it is now and after most of the other major Vancouver/South of Fraser projects have already been completed.

For now, let's just keep that third Seabus!
     
     
  #2725  
Old Posted Mar 19, 2010, 6:12 AM
Vonny Vonny is offline
Registered User
 
Join Date: Sep 2009
Posts: 155
Quote:
Originally Posted by Metro-One View Post
...

Also for the record, much of the money spent on highways over the last 10 years also helps transit greatly as well, for many bus routes are using the upgrades.

For example, I see there are now buses using the Coast Meridian Overpass, now avoiding congestion.

The 701 and other bus routes that use the new Pitt River Bridge are no longer jammed up for 20+ minutes at a time as in the old counter flow. These buses are now much more reliable on their schedules.
To be sure, you could have achieved the same result with queue jumper and traffic metering if necessary at choke point, and as pointed by HumnaTransit those choke point are rather an incredible opportunity to promote transit use, than an impediment (see Lion Bridge and George Massey)

Roads construction are primarily for car usage, and because it is in competition with transit, they don't help it at all. Instead one could say that they tend to promote more sprawling making transit service less efficient

Quote:
Originally Posted by Metro-One View Post
Surrey, Langley, Maple Ridge and Pitt meadows are now connected by bus via the new Golden Ears Bridge.
that is certainly a good thing , and Golden Ears is how the thing should be done (market priced bridge)

Also, note Lezard, this Golden Ears bridge is the single most important Translink investment: near to $1Billion, order of magnitude more than the Translink share in the Canada line, and it is this investment alone mostly which is limiting the Translink capacity to borrow money for new project
(no matter people say it will pay for itself, banks will don't lend to you if you are above a certain debt/revenue ratio...): have you noticed how this bridge is not in Vancouver?

Quote:
Originally Posted by lezard View Post
Much of the road investment is necessary in view of the aging infrastructure
Road infrastructure in Lower Mainland is not aged, it is even pretty young by common standard. so it is not in need to be replaced: (may be you are messing up with maintenance?)

all capital spending on road infrastructure are not justified by replacing aging structure, just by increasing road capacity, for good or bad reason is another story.
     
     
  #2726  
Old Posted Mar 19, 2010, 8:23 AM
CoryHolmes CoryHolmes is offline
Registered User
 
Join Date: Sep 2008
Posts: 1,031
Quote:
Originally Posted by tybuilding View Post
Personally I would rather see a rapid bus service East from King George Skytrain out to Langley, Aldergrove, Abbotsford, Chilliwack.
Good idea, but the terminus should probably be at Surrey Central Station rather than King George. With the relocation of City Hall and all the major investing going in in the Central City area, plus the already sizable bus exchange present, it makes more sense to have as many people as possible using that area. Even if it's just to walk from one train to the next, it'll do wonders for the urban feeling that Surrey is desperate to cultivate in that area.

Also, I'd avoid having the train follow Highway 1. It's a nice, probably cheaper way of doing it but most of the heavy population centres are a fair distance from the highway itself. To encourage people to use such a system, it has to be convienent to use and get to/from; Highway 1 is anything but convienent from a transit perspective.
     
     
  #2727  
Old Posted Mar 19, 2010, 11:13 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,947
Quote:
Originally Posted by Vonny View Post
To be sure, you could have achieved the same result with queue jumper and traffic metering if necessary at choke point, and as pointed by HumnaTransit those choke point are rather an incredible opportunity to promote transit use, than an impediment (see Lion Bridge and George Massey)

Roads construction are primarily for car usage, and because it is in competition with transit, they don't help it at all. Instead one could say that they tend to promote more sprawling making transit service less efficient



that is certainly a good thing , and Golden Ears is how the thing should be done (market priced bridge)

Also, note Lezard, this Golden Ears bridge is the single most important Translink investment: near to $1Billion, order of magnitude more than the Translink share in the Canada line, and it is this investment alone mostly which is limiting the Translink capacity to borrow money for new project
(no matter people say it will pay for itself, banks will don't lend to you if you are above a certain debt/revenue ratio...): have you noticed how this bridge is not in Vancouver?
About the first point, queue jumping would not have solved the need for the Coast meridian Overpass, for it creates a far more direct (faster) route for bus service from the northern area of PoCo to the southern area of PoCo, because it travels over a 500 meter wide rail yard that cuts the city in half. The alternative routes are both far to its sides and congested to the point where simple queue jumping would not have been a cheep alternative (the Mary Hill is backed up at ever traffic light during the rush hours, so an entire third lane would need to be constructed, very expensive, especially since it would have meant the reconstructing of the CP underpass. On the other side, the Shaughnessy underpass (again, CN) is only 2 lanes wide (one in each direction) and again, even with queue jumper lanes, would add several minutes (maybe even 10) on any cross regional bus trip.

Here is a map of the area: http://maps.google.com/?ie=UTF8&ll=49.258451,-122.756209&spn=0.026104,0.057077&t=h&z=15

You will see how the new overpass is much more direct link for many areas of the two sides of the city, and was needed (essentially it is the continuation of a normal street grid).

As for the Pitt River Bridge, those bridges needed to be replaced! First of all, even with the HOV lane (which acted much like a queue jumper for buses) buses would still be delayed up to 20 minutes merging two lanes over during counter flow and idling on the bridge deck for the by pass traffic light (now gone)

Also, the bridges were swing bridges, and it would take up to 30 minutes for the bridges to swing open, allow the boat traffic to pass, and then close again. That caused severe delays for buses and motorists alike (and even cyclists)

Also, I remember a few times when the counter flow system was out (due to power outages) the delays to get over the bridge were insane. Once during a bridge power outage (this is no exaggeration) it took me over 2 hours of waiting in traffic to get over the bridge. In fact, the entire street grid on the Pitt Meadows side was gridlock all the way to 216th in Maple Ridge! No queue jumping lanes were helping buses that day!

So yes, some road expansion projects are necessary to more directly link regions and to replace poorly designed infrastructure.

As for the second point I highlighted in your post, what does it mean? hehehehe

Sorry to be so off topic, but we are talking about projects built in Metro Vancouver and how it all relates back to transit and what project deserves priority next.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #2728  
Old Posted Mar 19, 2010, 11:23 AM
lezard lezard is offline
Closed account
 
Join Date: Jun 2008
Posts: 143
Quote:
Originally Posted by Vonny View Post

Also, note Lezard, this Golden Ears bridge is the single most important Translink investment: near to $1Billion, order of magnitude more than the Translink share in the Canada line, and it is this investment alone mostly which is limiting the Translink capacity to borrow money for new project
(no matter people say it will pay for itself, banks will don't lend to you if you are above a certain debt/revenue ratio...): have you noticed how this bridge is not in Vancouver?



Road infrastructure in Lower Mainland is not aged, it is even pretty young by common standard. so it is not in need to be replaced: (may be you are messing up with maintenance?)

all capital spending on road infrastructure are not justified by replacing aging structure, just by increasing road capacity, for good or bad reason is another story.
Don't get me wrong, I'm not necessarily satisfied with the some of the elements of the Gateway Program. And it has drained funds away from public transit investments that I thought were more important.

What I understood from the infrastructure funding details is that not all was for expansion. The Province is justifying some of the spending by calling attention to the aging I alluded to.
     
     
  #2729  
Old Posted Mar 19, 2010, 5:46 PM
flight_from_kamakura's Avatar
flight_from_kamakura flight_from_kamakura is offline
testify
 
Join Date: Mar 2008
Location: san francisco and montreal
Posts: 1,319
the courier article notes that :

Options on how the masses should be shuttled on rapid transit between Commercial Drive and UBC will be unveiled to the public as soon as next month.

The report will lay out four to six rapid transit options, consider the route and whether the line should be underground, elevated or at street level.

A technical and public review of the short-listed options is scheduled to run this spring through winter. It is expected to be completed by next February.

Work on the detailed design and business case for the UBC Line has not been scheduled.

also, no surprise that the merchants association is pushing hard for surface rail, and the article reminded me that i still haven't filled out the city's broadway corridor survey.
http://www.surveymonkey.com/s/ZHR5F3R

i'm 3/3 on surveys so far, with the city going along with my recommendation though, at this point, i regret being bamboozled into the "flex" parking on granville street.
     
     
  #2730  
Old Posted Mar 19, 2010, 7:10 PM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,947
Quote:
Originally Posted by lezard View Post
Don't get me wrong, I'm not necessarily satisfied with the some of the elements of the Gateway Program. And it has drained funds away from public transit investments that I thought were more important.

What I understood from the infrastructure funding details is that not all was for expansion. The Province is justifying some of the spending by calling attention to the aging I alluded to.
The Golden Ears Bridge was not part of Gateway. It was a project that had been planned for well over 20 years and is a critical link now connecting 4 of our cities together.
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
  #2731  
Old Posted Mar 19, 2010, 8:24 PM
cabotp cabotp is offline
Registered User
 
Join Date: Mar 2009
Location: Vancouver, BC
Posts: 2,813
Quote:
Originally Posted by idunno View Post
I wouldn't say the North Shore is exactly begging for rail transit, so the issue of NIMBYism isn't really as much of a factor compared to other areas (Point Grey?). The bus service on the north shore is pretty good right now, but in the future I guess an LRT on marine drive would be nice. Also something up Lower Lonsdale (probably the first priority). Either way those kinds of projects are far away in a time where the NS is a lot denser than it is now and after most of the other major Vancouver/South of Fraser projects have already been completed.

For now, let's just keep that third Seabus!
I think a B-Line type of bus service could be beneficial to the North Shore. Something that maybe starts from Brentwood station and crosses the iron workers. Then goes along Marine.

I don't see the North Shore needing an LRT anytime soon. Or better yet it is way down the list. SoF is a bigger priority.
     
     
  #2732  
Old Posted Mar 19, 2010, 9:14 PM
lezard lezard is offline
Closed account
 
Join Date: Jun 2008
Posts: 143
Quote:
Originally Posted by Metro-One View Post
The Golden Ears Bridge was not part of Gateway. It was a project that had been planned for well over 20 years and is a critical link now connecting 4 of our cities together.
Yes, I know.
     
     
  #2733  
Old Posted Mar 19, 2010, 9:42 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,623
From the Seattle Times - of interest

Quote:
Thursday, March 11, 2010 - Page updated at 11:46 PM

Sound Transit to do more drilling, filling to close 9 voids in Beacon Hill
By Mike Lindblom

Seattle Times transportation reporter

Sound Transit needs to conduct another round of drilling and filling inside Beacon Hill to completely close the nine voids discovered there last year.

These air pockets in the hill were caused by soil slides above a drilling machine, while it crawled some 160 feet below the hilltop clearing a tunnel for the Link light-rail line. When too much soil falls into the grinding teeth at the head of the machine and is whisked away by conveyor belts, that leaves gaps in the soil layers above.

Transit CEO Joni Earl called it "a miss" that officials didn't immediately recognize during construction, from 2004-09. "Had we seen and realized there was excess, we would have stopped then," she told a transit-board committee Thursday.

The voids were discovered last year when a homeowner, gardening in her yard, noticed a deep hole.

Sound Transit has spent $1.6 million since then, and injected 2,550 cubic yards of cement — about 250 truckloads. The follow-up work could cost a similar amount, officials say.

"There is no imminent danger to the public and our structure," Joe Gildner, deputy director for Link light rail and a tunneling expert, said Thursday.

But a follow-up round of scientific investigations, including test drilling from hilltop properties, will be needed.

Officials don't know precisely where they need more cement. They arrived at a 430-cubic-yard estimate by comparing what they injected last year with records of the soil volumes removed during the tunnel boring.

Voids occurred only within a 300-foot-long zone of wet sands that are especially unstable, Gildner said.

The twin tunnel tubes carry trains between Rainier Valley and Sodo. There is a deep underground station at Beacon Hill.

The one-mile Beacon Hill segment was built by Obayashi Corp., under a $280 million contract that has increased to $312 million — and further millions in claims are scheduled for arbitration.

This is despite extensive pre-drilling investigations, including a wide test shaft near where the station's elevator shaft operates now. Even before the sand slides, Sound Transit had already shifted the underground station site to reduce sand risks.

Ahmad Fazel, light-rail director, said Sound Transit noticed discrepancies during the drilling work, but the contractors attributed that to conveyor-belt issues. "Unfortunately, we took that explanation and accepted it at the time," he told board members. Sound Transit considers void costs to be Obayashi's responsibility, he said.

Beacon Hill is part of the $2.6 billion, 16-mile rail corridor that opened last year from Westlake Center to Seattle-Tacoma International Airport, now serving roughly 16,000 riders a day.

Other bored tunnels are planned for a Capitol Hill light-rail corridor to Husky Stadium; and for an Alaskan Way Viaduct replacement through downtown Seattle.

The Brightwater sewer tunnel near the King-Snohomish county line has caused sinkholes.

Transit leaders said there are "lessons learned" from the Beacon Hill episode, to be applied to the Capitol Hill Tunnel. Voids or sinkholes are a known risk in bored-tunnel projects around the world.

Mike Lindblom: 206-515-5631 or [email protected]
     
     
  #2734  
Old Posted Mar 19, 2010, 10:36 PM
lezard lezard is offline
Closed account
 
Join Date: Jun 2008
Posts: 143
A similar problem hit the M2 metro project in Lausanne, Switzerland 5 years ago. A sinkhole opened up above the bored tunnel during the excavation work. A supermarket above lost a large part of their wine cellar when part of the building's basement fell through the tunnel roof.

Some pictures on the local tv station's archive pages.

http://www.tsr.ch/tsr/index.html?siteSect=200001&sid=5556228
http://www.tsr.ch/tsr/index.html?siteSect=200001&sid=5559035

I was in Lausanne when it happened, it created quite a stir.
     
     
  #2735  
Old Posted Mar 22, 2010, 12:27 AM
AMTDGT AMTDGT is offline
Registered User
 
Join Date: Jul 2009
Posts: 133
Quote:
Originally Posted by lezard View Post
A sinkhole opened up above the bored tunnel during the excavation work.
.
I don't know for sure BUT, a sink hole opened up on the west side of Davie street where the CL begins its turn to Granville, just after the TBM went by on the first pass (It was along the curb and they blocked off the parking for a few months while they fixed it).

On the second pass, The day the TDM broke into Yaletown Stn, we were talking to a fellow who was part of a team hired to pressurize the second pass tunnel north of Yaletown because some of the soil was unstable fill. The air pressure was to be used to hold the soil back until the liners were in place.

Not saying the 2 were connected but.......
     
     
  #2736  
Old Posted Mar 22, 2010, 4:29 AM
Vonny Vonny is offline
Registered User
 
Join Date: Sep 2009
Posts: 155
Just quick answer

Quote:
Originally Posted by Metro-One View Post
About the first point, queue jumping would not have solved the need for the Coast meridian Overpass, for it creates a far more direct (faster) route for bus service from the northern area of PoCo to the southern area of PoCo, because it travels over a 500 meter wide rail yard that cuts the city in half.
sure, but it also creates a far more direct route for cars, so it doesn't bring a competitive edge for bus.


Quote:
Originally Posted by Metro-One View Post
As for the Pitt River Bridge, those bridges needed to be replaced! First of all, even with the HOV lane (which acted much like a queue jumper for buses) buses would still be delayed up to 20 minutes merging two lanes over during counter flow and idling on the bridge deck for the by pass traffic light (now gone)
it is where traffic metering could have help to keep clear the bridge spam, hence avoiding the "20mn" delay for bus

Quote:
Originally Posted by Metro-One View Post
Also, the bridges were swing bridges, and it would take up to 30 minutes for the bridges to swing open, allow the boat traffic to pass, and then close again. That caused severe delays for buses and motorists alike (and even cyclists)
Again agree, but in other part of the world this thing is usually resolved by short turning the bus service on each end of the bridge-
like what is typically done on rail system when the line is obstructed on some of its point- that allow to keep a seamless service for most of the people not crossing the bridge.


It is not to say that those solutions are ideal, but to say that if you want to address transit need, you don't need to resort to a new 8 lane spam bridge...

and that primarily those infrastructure upgrade are done exclusively for increase the road capacity. I don't prejudge of their relevance, but just say that Transit improvement can not be a justification.


Quote:
Originally Posted by Metro-One View Post
As for the second point I highlighted in your post, what does it mean? hehehehe
that was for Lezard.

OK, go back to the topic.
     
     
  #2737  
Old Posted Mar 22, 2010, 6:33 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,079
Quote:
Originally Posted by Vonny View Post
Again agree, but in other part of the world this thing is usually resolved by short turning the bus service on each end of the bridge-
like what is typically done on rail system when the line is obstructed on some of its point- that allow to keep a seamless service for most of the people not crossing the bridge.
How would you short turn a bus route when the traffic backed up all the way to the first or second stop of the route?
     
     
  #2738  
Old Posted Mar 22, 2010, 7:31 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
I hadn't seen this report on the subject before.
It seems like it would be tough for surface LRT to meet these targets, like not blocking north/south streets and carrying 38% of the corridor traffic at rush hour twenty years from now.

http://vancouver.ca/ctyclerk/cclerk/20100119/documents/ttra4.pdf
     
     
  #2739  
Old Posted Mar 22, 2010, 5:32 PM
andcarne andcarne is offline
Registered User
 
Join Date: Apr 2009
Posts: 30
Some information on how things are going from UBC's perspective can be gleaned from this report to the UBC Board of Governors at their upcoming meeting tomorrow.

Page three is particularly interesting as it suggests UBC has retained their own consultant and is fighting TransLink over their ridership numbers:

Quote:
Analysis completed by UBC's specialized transit consultants suggest that the study's assumptions regarding Central Broadway peak transit load may be overestimated by 10% while the Blanea/UBC peak load may be underestimated by 29%. The first table in Attachment 2 illustrates that UBC's consultants estimate that peak transit demand at the UBC end of the corridor is 3,875 trips and the peak demand in the central Broadway section is 3,190 trips. While this type of analysis is not an exact science, this level of difference is a cause for concern, particularly when very significant investment decisions are made in part based on this technical analysis.
UBC staff will continue to work with TransLink staff and their consultants to resolve these important data Issues.
It's also nice to see them pushing the problem with pass-ups, and trying to ensure capacity for growth and 'latent demand':

Quote:
TransLink has estimated there are 900 'pass ups' at the Commercial Drive station in the AM peak hour, based on a study they undertook in November
2009. A consultant study for UBC estimated that 2,000 transit passengers are passed up during the aM peak at this same station, based on a special consulting study completed in early February 2010 before the Olympic Games period.
They also seem to be pressuring TransLink into holding consultations sooner on campus so that students will be around and able to attend. I'm looking forward to seeing how wins some of these fights, particularly over the ridership numbers for different portions of the corridor. The previous assumption seems to have always been that ridership drops off around granville for the rest of the trip to UBC, but this seems to be showing rather the opposite.
     
     
  #2740  
Old Posted Mar 22, 2010, 6:56 PM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
Council favoring taking the streetcar to UBC rather than skytrain?

Streetcar technology could come to Broadway corridor
Quote:
VANCOUVER (NEWS1130) - The Olympic streetcar is being hailed as a big success, having moved more than half a million riders over the past two months.

The line between the Athletes Village and Granville Island made its final voyage yesterday but a version of it could one day move passengers to UBC and back. Councillor Andrea Reimer tells the 24 Hours streetcar technology could be the affordable solution to transportation down the Broadway Corridor.

Mayor Gregor Robertson says it wouldn't happen tomorrow, more likely once construction of the Evergreen Line out to the Tri-Cities is complete, sometime after 2014.
http://www.news1130.com/news/local/artic...chnology-could-come-to-broadway-corridor
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:37 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.