  #2661  
Old Posted Feb 14, 2009, 5:32 PM
chi-arch chi-arch is offline
Registered User
 
Join Date: Feb 2006
Location: Chicago
Posts: 266
...........

Last edited by chi-arch; Feb 23, 2009 at 2:44 PM.
     
     
  #2662  
Old Posted Feb 25, 2009, 12:13 AM
Mehow Mehow is offline
Registered User
 
Join Date: May 2008
Posts: 25
Quote:
Originally Posted by chi-arch View Post
This project is as good an example of any that deserves a "construction loan" from a US bank right now. It will put people immediately back to work, bring a higher tax base to that property into perpetuity, create another 5 star hotel for the city along with jobs associated with that, beautify that corner, etc.
I swear some of you would just as soon see this thing torn down and returned to a parking lot out of spite.

Maybe we can enclose it under Obama's weatherization program.
This thread is drifting again and should be locked down until some new news.
Latest news = City of Chicago walks through building with citation book and damn near runs out of ink.
1) Board up ALL elevator shaft openings for safety.
2) Replace/repair all blue safety netting around building from top to bottom.
3) All material on site needs to be moved into core and secured.
4) If crane will not be used soon, remove it. To remove "it" shoring needs to be installed five floors below to set the pieces of crane on it while disassembling. BIG MONEY!!!
     
     
  #2663  
Old Posted Feb 25, 2009, 6:06 AM
ChicagoChicago ChicagoChicago is offline
Chicago carpetbagger
 
Join Date: Jul 2008
Location: Chicago, Atlanta, Nashville
Posts: 662
Quote:
Originally Posted by Mehow View Post
Latest news = City of Chicago walks through building with citation book and damn near runs out of ink.
1) Board up ALL elevator shaft openings for safety.
2) Replace/repair all blue safety netting around building from top to bottom.
3) All material on site needs to be moved into core and secured.
4) If crane will not be used soon, remove it. To remove "it" shoring needs to be installed five floors below to set the pieces of crane on it while disassembling. BIG MONEY!!!
Good. Shit or get off the pot.
     
     
  #2664  
Old Posted Feb 25, 2009, 8:02 PM
chi-arch chi-arch is offline
Registered User
 
Join Date: Feb 2006
Location: Chicago
Posts: 266
Quote:
Originally Posted by Mehow View Post
If Central crane needed that rig on another project,it would be down by now.
So what is BIG MONEY(point 4 in your post above) to get the crane down now? 500K? one Million? Got a clue/guess?
     
     
  #2665  
Old Posted Feb 25, 2009, 10:17 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
Me thinks this will become some unfinished landmark that we will all grow to like it along the city buildings at that particular area and then in 20 years there going to try to save it but end up knocking it down.
     
     
  #2666  
Old Posted Feb 26, 2009, 2:14 AM
Mehow Mehow is offline
Registered User
 
Join Date: May 2008
Posts: 25
Quote:
Originally Posted by chi-arch View Post
So what is BIG MONEY(point 4 in your post above) to get the crane down now? 500K? one Million? Got a clue/guess?
I would think with all the reshore install/removal, installing a derick to remove the crane, paying U.S.A. Hoist to jump the skip to the top floor (to remove the derick) it would go for 100-200K. I believe they would have to go with the derick vrs. a 500 ton hydro or fixed boom crane because there are vaults under clark and lower Wacker under Wacker drive.
     
     
  #2667  
Old Posted Feb 27, 2009, 3:47 AM
jjk1103 jjk1103 is offline
Registered User
 
Join Date: Mar 2006
Posts: 878
Quote:
Originally Posted by Plokoon11 View Post
Me thinks this will become some unfinished landmark that we will all grow to like it along the city buildings at that particular area and then in 20 years there going to try to save it but end up knocking it down.
.....unfortunately, I think I agree with you (bummer)
......can't they just turn it into a multistory parking garage ?
     
     
  #2668  
Old Posted Feb 27, 2009, 3:56 AM
the urban politician the urban politician is offline
The City
 
Join Date: Jul 2004
Location: Chicago region
Posts: 21,329
So when does this project get landed in the "Never Built" category?
__________________
Supercar Adventures is my YouTube channel:

https://www.youtube.com/channel/UC4WNEwTDZlUKB1w8ED5bV2Q

People who say housing is a human right deserve to be homeless
     
     
  #2669  
Old Posted Feb 27, 2009, 4:44 AM
jcchii's Avatar
jcchii jcchii is offline
Content provider
 
Join Date: Jul 2003
Location: city on the take
Posts: 3,118
can't blame the city for jamming them
     
     
  #2670  
Old Posted Feb 27, 2009, 5:30 AM
JDRCRASH JDRCRASH is offline
Registered User
 
Join Date: Mar 2007
Location: San Gabriel Valley
Posts: 8,099
Quote:
Originally Posted by the urban politician View Post
So when does this project get landed in the "Never Built" category?
I don't know if it should be called "Never Built", because at least part of it was completed.
__________________
Revelation 21:4
     
     
  #2671  
Old Posted Feb 27, 2009, 4:55 PM
brian_b brian_b is offline
Registered User
 
Join Date: Oct 2005
Location: Chicago
Posts: 1,572
Quote:
Originally Posted by jcchii View Post
can't blame the city for jamming them
Nope, it's a good thing.

Teng is just sitting on the project because it doesn't want to turn paper losses into actual losses, and as long as someone allows them they're going to delay in the hopes that some sucker comes along and makes them whole on the project. In the mean time you've got a construction site that poses a danger to the general public. The city allows such a thing as long as progress is being made, but clearly that's not happening and shows no sign that it will happen in the future as long as Teng is allowed to stall.

Sell the thing at whatever the market will bear and admit you lost money.
     
     
  #2672  
Old Posted Feb 27, 2009, 5:40 PM
Tom In Chicago's Avatar
Tom In Chicago Tom In Chicago is offline
Moderator
 
Join Date: Jul 2001
Location: Sick City
Posts: 7,576
Quote:
Originally Posted by the urban politician View Post
So when does this project get landed in the "Never Built" category?
When Teng sells the property? I suspect they're going to sit on it and wait out the storm. . . might be on hold for a while though. . .
__________________
Tom in Chicago
. . .
Near the day of Purification, there will be cobwebs spun back and forth in the sky.
     
     
  #2673  
Old Posted Feb 28, 2009, 10:12 AM
Mehow Mehow is offline
Registered User
 
Join Date: May 2008
Posts: 25
A lot of vehicles on site Thursday and Friday, hoist running, making repairs per city request.
     
     
  #2674  
Old Posted Feb 28, 2009, 8:00 PM
harryc's Avatar
harryc harryc is offline
Registered User
 
Join Date: Jun 2007
Location: Oak Park, Il
Posts: 14,941
Feb 23 - am - a quite site - aside from the faint tinkling of saftey straps in the wind.


Feb 23 - pm - catching some rays.


Feb 26 - a rainy day.


As reported work was going on Friday with rolls of new blue fence/cloth stuff and stacks of plywood, there was much hammering and sawing coming from inside. (click on thumbs for full size )



the end of a busy week.
__________________
Harry C - Urbanize Chicago- My Flickr stream HRC_OakPark
The man who trades freedom for security does not deserve nor will he ever receive either. B Franklin.
     
     
  #2675  
Old Posted Mar 2, 2009, 10:02 AM
Mehow Mehow is offline
Registered User
 
Join Date: May 2008
Posts: 25
Awesome pictures Harry C. !!!
     
     
  #2676  
Old Posted Mar 2, 2009, 7:35 PM
observer observer is offline
Registered User
 
Join Date: May 2006
Posts: 74
Teng should just try and find $2,000,000 so they can put two parking elevators and two exit stairs (that's at a huge discount of what they would normally cost...but they should benefit from sinking comodity prices and hungry contractors). They could undercut adjacent parking garages and still make $100,000 a month (400 spaces x $14/day x 20 days a month - opperating costs)....that would give them income to take crane down and tidy up a bit....as well a means to pay back 2 million dollar loan...and then god forbid...start paying there bills from the contractors who built what they have out there now. This would also give them time to wade out the financial storm.
     
     
  #2677  
Old Posted Mar 2, 2009, 7:55 PM
aaronrosen26's Avatar
aaronrosen26 aaronrosen26 is offline
Registered User
 
Join Date: Feb 2006
Posts: 30
I'm not a contractor nor an architect, but I would imagine there's probably a lot more systems besides the elevators that would have to be in place (lots of electrical work, lighting, parking infrastructure like gates and boothes, a contractor to run the lot, etc.) and that this is much easier said than done in what amounts to little more than a concrete shell disconnected from the grid.
     
     
  #2678  
Old Posted Mar 2, 2009, 8:21 PM
ChicagoChicago ChicagoChicago is offline
Chicago carpetbagger
 
Join Date: Jul 2008
Location: Chicago, Atlanta, Nashville
Posts: 662
Quote:
Originally Posted by aaronrosen26 View Post
I'm not a contractor nor an architect, but I would imagine there's probably a lot more systems besides the elevators that would have to be in place (lots of electrical work, lighting, parking infrastructure like gates and boothes, a contractor to run the lot, etc.) and that this is much easier said than done in what amounts to little more than a concrete shell disconnected from the grid.
I've got to believe much of that would be required to finish the building anyway, such as sprikler systems, plumbing, lighting, exterior paneling to obscure the garage, etc. But it would likely be well north of $2M.
     
     
  #2679  
Old Posted Mar 3, 2009, 12:09 AM
EarlyBuyer's Avatar
EarlyBuyer EarlyBuyer is offline
Registered User
 
Join Date: Jul 2007
Location: Chicago
Posts: 885
Published today in a hotel industry trade journal:

Shangri-La Hotel, Chicago Hotel Project Suspended


March 2, 2009

"Shangri-La Asia Ltd’s wholly owned subsidiary SLIM (USA) Inc. signed contracts with Waterview LLC, the project’s developer, to provide pre-opening technical assistance services and later to operate the Shangri-La Hotel, Chicago . Under the current economic environment, regrettably, the implementation of the hotel project has been suspended with no indication of when activities will resume. Accordingly, SLIM (USA) Inc., in exercise of its contractual rights under the agreements, has served a notice on the developer terminating its contracts relating to this project. Shangri-La’s commitment to the North American market remains strong. The group’s first North American property opened on January 24, 2009 in Vancouver."

http://www.hotel-online.com/News/PR2009_1st/Mar09_ShangriLaChicago.html


.
     
     
  #2680  
Old Posted Mar 3, 2009, 1:27 AM
jcchii's Avatar
jcchii jcchii is offline
Content provider
 
Join Date: Jul 2003
Location: city on the take
Posts: 3,118
I hope they look at other chicago projects
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Never Built & Visionary Projects > Cancelled Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 3:06 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.