ACC are now working on the site.
The foundation is due to be poured in december, we will see if that will happen or not.
Completion of this is supposed to be at the end of 2013 but as usual, I think delays will mean it will actually be completed at the end of 2014. I'd say topping out will happen at the end of 2013 though.
They are breaking the pile caps now. This excavation is insanely deep. I think there are supposed to be 6 basements.
You can also see the ACC sign on the site offices.
Quote:
Originally Posted by Imre
|