Permanent solution? Do we have one yet? It sounds like those curves between Lees and Tremblay are the big culprit.
     
     
  #16722  
Old Posted Jul 18, 2023, 2:11 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by lrt's friend View Post
Permanent solution? Do we have one yet? It sounds like those curves between Lees and Tremblay are the big culprit.
And yet the city wants to repeat the problem in Stage 3 because they don't want to expropriate the land that the owner is planning to renovict the tenants anyway to convert them to luxury townhomes.
__________________
Pronouns: He/Him/His
     
     
  #16723  
Old Posted Jul 18, 2023, 2:40 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,947
Quote:
Originally Posted by roger1818 View Post
And yet the city wants to repeat the problem in Stage 3 because they don't want to expropriate the land that the owner is planning to renovict the tenants anyway to convert them to luxury townhomes.
They're repeating it for stage 2 as well. One just need to look at those curves right after Blair station to know its a disaster in the making.


From Rail Fans
     
     
  #16724  
Old Posted Jul 18, 2023, 3:39 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,626
In fairness; the curves in that image look more severe than they really are. That photo appears to have been taken with a telephoto lens; which gives a foreshortened view.
     
     
  #16725  
Old Posted Jul 18, 2023, 3:45 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
At this point I have to wonder whether replacing the 100% low for trains with 70% low floor trains would solve the various associated problems with the axles by going to a more conventional bogie layout like the one for the S70 on page 28 of this https://web.archive.org/web/201907222304...onents-and-systems/bogies-catalog-en.pdf

versus the low floor one on page 22.

Maybe just maybe acknowledge that the original output specifications (100% low floor with high floor speeds edit: was heavily preferred) is a tradeoff where all bidders would have had similar failures.

Last edited by MalcolmTucker; Jul 18, 2023 at 4:10 PM.
     
     
  #16726  
Old Posted Jul 18, 2023, 3:47 PM
Kelnoz Kelnoz is offline
Registered User
 
Join Date: Dec 2020
Posts: 175
Quote:
Originally Posted by MalcolmTucker View Post
Maybe just maybe acknowledge that the original output specifications (100% low floor with high floor speeds) is a tradeoff where all bidders would have had similar failures.
Was 100% low floor a requirement? Low floor was, but I'm pretty sure 70% was accepted.
     
     
  #16727  
Old Posted Jul 18, 2023, 4:08 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Quote:
Originally Posted by Kelnoz View Post
Was 100% low floor a requirement? Low floor was, but I'm pretty sure 70% was accepted.
I haven't looked at things in detail (and I can't find the original output spec in a quick google, alas) since I was a consultant on a small aspect of the procurement design process more than a decade ago. The process included a long period called competitive dialog in P3 parlance, where bidders and procurers can iterate. Optional things can be requirements if scored high enough.

I can tell you that the somewhat simultaneous TTC streetcar project that preferenced 100% low floor to a great degree (but allowed 70%) was big in bidders minds. There is a reason during this process the winning bidders were able to get the requirement for a proven vehicle removed (which likely was a 70% low floor RegioCitadis) and replaced with what Ottawa got. The procurers didn't want the lowest bid screened out for proposing a 70% train.
     
     
  #16728  
Old Posted Jul 18, 2023, 4:23 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,781
Is this really a train problem or was the track improperly designed for the trains? Nevertheless, how long will closure last this time? Days, weeks, months? It seems to me that go slow orders, which was designed to reduce stress on the trains has not worked. Is it now time to find a permanent solution even if means a substantial closure?
     
     
  #16729  
Old Posted Jul 18, 2023, 4:33 PM
Spoonsy's Avatar
Spoonsy Spoonsy is offline
You call that a knife?
 
Join Date: Jul 2016
Location: Centretown West
Posts: 326
did they really discover this the day after bluesfest or did they just cross their fingers for a week?
     
     
  #16730  
Old Posted Jul 18, 2023, 4:38 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
Quote:
Originally Posted by lrt's friend View Post
Is this really a train problem or was the track improperly designed for the trains? Nevertheless, how long will closure last this time? Days, weeks, months? It seems to me that go slow orders, which was designed to reduce stress on the trains has not worked. Is it now time to find a permanent solution even if means a substantial closure?
Well, it is all meant to be an optimization, with different bidders adjusting things to best meet the output specification while minimizing overall costs (the balance of capital, operations, and maintenance) over the contract term.

Clearly the bidder felt pressure to be over optimistic about the vehicle given the design of the tracks, or didn't reevaluate maintenance needs for vehicles after design changes driven by costs for tracks.

In any case now is a mitigation point. And the problem comes back to money - does the city want to push the project into failure to solve the problem? What is the best way to solve the problems?

I'd bet there are two options:
  • accept slower service as in full compliance with the contract but make up for the loss in ppdph with additional consists
  • replace the vehicles (likely at majority city expense)
     
     
  #16731  
Old Posted Jul 18, 2023, 4:38 PM
Fading Isle Fading Isle is offline
Registered User
 
Join Date: Aug 2022
Posts: 149
If this was only a matter of inspecting all the trains, they should have a pretty clear idea of how long that takes and be able to give a timeline. The fact that they’ve specifically said the closure is indefinite suggests a bigger issue and a potentially quite lengthy closure doesn’t it?
     
     
  #16732  
Old Posted Jul 18, 2023, 4:44 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,781
Quote:
Originally Posted by MalcolmTucker View Post
Well, it is all meant to be an optimization, with different bidders adjusting things to best meet the output specification while minimizing overall costs (the balance of capital, operations, and maintenance) over the contract term.

Clearly the bidder felt pressure to be over optimistic about the vehicle given the design of the tracks, or didn't reevaluate maintenance needs for vehicles after design changes driven by costs for tracks.

In any case now is a mitigation point. And the problem comes back to money - does the city want to push the project into failure to solve the problem? What is the best way to solve the problems?

I'd bet there are two options:
  • accept slower service as in full compliance with the contract but make up for the loss in ppdph with additional consists
  • replace the vehicles (likely at majority city expense)
The ultimate solution might require a new bridge over the Rideau (pointing more to the east) and relocation of Hurdman Station, a very expensive solution.

We have had go slow orders for a year and still are having axle problems. How slow can we go to keep these trains running? Walking speed instead of bicycle speed? This will be a catastrophe for Ottawa transit, since the problem area is so central to the system.
     
     
  #16733  
Old Posted Jul 18, 2023, 5:54 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,844
Quote:
Originally Posted by SL123 View Post
They're repeating it for stage 2 as well. One just need to look at those curves right after Blair station to know its a disaster in the making.


From Rail Fans
Quote:
Originally Posted by Richard Eade View Post
In fairness; the curves in that image look more severe than they really are. That photo appears to have been taken with a telephoto lens; which gives a foreshortened view.
Not quite as severe as what the picture suggests, but still a questionable design choice. Originally, they were planning building a new underpass, but decided not to to cut costs.



Quote:
"This improvement will decrease construction complexity and costs associated with the life cycle maintenance and inspection of the tunnel structures," Swail wrote in the memo, adding that the new design allows for future integration with the planned Cumberland Transitway.
True it decreases construction complexity, but saving costs on life cycle maintenance is an outright lie. Swail had no issues straight up lying to the public and Council, under the direction of Watson.

I also fail to understand how the rail line and Cumberland Transitway can co-exist in one underpass.

https://www.cbc.ca/news/canada/ottawa/cleary-station-lrt-ottawa-1.3506075

Quote:
Originally Posted by MalcolmTucker View Post
At this point I have to wonder whether replacing the 100% low for trains with 70% low floor trains would solve the various associated problems with the axles by going to a more conventional bogie layout like the one for the S70 on page 28 of this https://web.archive.org/web/201907222304...onents-and-systems/bogies-catalog-en.pdf

versus the low floor one on page 22.

Maybe just maybe acknowledge that the original output specifications (100% low floor with high floor speeds edit: was heavily preferred) is a tradeoff where all bidders would have had similar failures.
I don't think 70% low floor would allow for open gangways. Even if it did, it would result in far less efficient movement of people through the train.

I wonder if smaller modules (and therefore, shorter wheel bases) would help.
     
     
  #16734  
Old Posted Jul 18, 2023, 6:37 PM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 1,664
Are the boogies on each side of the train car fixed?

I feel like i remember hearing some rumblings about pivoting boogies but rejected to save cost. I have no clue where I might have got that information from and it could all be a feverish dream after using this transit system.

If a pivoting boogie could be adapted I think that would pretty much solve this issue no?

Here is a quick blurb from Wiki under 'Low-floor tram'

"Many low floor trams have fixed bogies[3] which increase track wear and tear, while decreasing the speed at which a tram can drive through a curve (usually 4–15 km/h in 20 m radius curve).[4] The Škoda ForCity and the newest Alstom Citadis X04 try to counter the effect with low floor pivoting bogies while maintaining 100% low floor design. Prior to the new design, pivoting bogies could only be used under high floors, hence such trams could only be part low-floor, with high-floor sections over the pivoting bogies."
__________________
I don't understand how communism works.
     
     
  #16735  
Old Posted Jul 18, 2023, 6:57 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,596
I imagine they're much like this:
http://www.ipernity.com/doc/288839/42811068

It is likely the high-speed operations creates stress that is hard to mitigate. Might even be the semi-automated operating manner creates the exact same stress each time operating through curves at speed, compounding the problem that the randomness introduced by human operation causes.
     
     
  #16736  
Old Posted Jul 18, 2023, 8:15 PM
Tesladom Tesladom is offline
Registered User
 
Join Date: May 2019
Posts: 581
Quote:
Originally Posted by ponyboycurtis View Post
Are the boogies on each side of the train car fixed?
Your Avatar says it all
     
     
  #16737  
Old Posted Jul 18, 2023, 8:15 PM
Tesladom Tesladom is offline
Registered User
 
Join Date: May 2019
Posts: 581
Quote:
Originally Posted by ponyboycurtis View Post
Are the boogies on each side of the train car fixed?
Your Avatar says it all
     
     
  #16738  
Old Posted Jul 19, 2023, 1:08 PM
OTownandDown OTownandDown is offline
Registered User
 
Join Date: Jul 2018
Posts: 1,618
Did we have a track layout design decision based on a radius spec, followed by a cost saving non-pivoting bogie that would ultimately require a larger radius and now we're in a jamb and RTG are internally finished pointing fingers and have burned that particular file.
     
     
  #16739  
Old Posted Jul 19, 2023, 1:32 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,781
Quote:
Originally Posted by OTownandDown View Post
Did we have a track layout design decision based on a radius spec, followed by a cost saving non-pivoting bogie that would ultimately require a larger radius and now we're in a jamb and RTG are internally finished pointing fingers and have burned that particular file.
On time, on budget, well the latter anyways.
     
     
  #16740  
Old Posted Jul 19, 2023, 1:49 PM
daud's Avatar
daud daud is offline
Registered User
 
Join Date: Jun 2012
Location: Ottawa
Posts: 762
honest question:

Is there a train in the market that could replace our trains and run on our system?

Comments (not a train expert at all)

It really seems to me Alstom delivered a prototype product that didn't meet the spec (higher speeds and higher volume). That's on them.

It also seems to me that our city procurement chose a solution that had elements that were simply just prototypes. Modified from the original models to increase speed and capacity. Hindsight is 20/20 but we should have stuck to something that was tested and known. That part is on us.

I, like many others have been calling this system a lemon for years now. Some of the other issues are not "deal breakers" per say but this bearing issue seems to be a critical one. Wilson Lo on CTV today admitted there are going to likely be some very difficult decisions and conversations to be had about this line and any long term solution.

I love this system when it works, the trains look awesome, the tunnel and stations for the most part look awesome too but this is probably the biggest mess our city has ever managed to get themselves into-and there have been a few!
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 11:22 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.