Quote:
Originally Posted by FarmerHaight
Has the cost of just running the streetcar between GI and Science World been studied? Is there space for a maintenance facility on that ROW? I have to think the capital costs for that section would be low, since the stretch between Granville and Cambie is already there. I wonder if the city could partner with the federal government (owner of GI IIRC) to fund the project.
|
Eeyup. Granville Island to Science World and a maintenance facility in the Flats works out to $600-700 million in 2019 dollars, which is actually cheaper by distance than the rest of the line; extending to Arbutus Station makes it $807 million, Waterfront is $912 million, and Yaletown (which just should not happen) rounds it up to $1.07
billion.
In return, we're getting... 8-minute frequency and 14,260 riders a day, or about the same frequency as the 16 and 59% of its peak ridership; from other threads, the City's current plan is to
fill in the CP ROW for development and run the tram on the
north side of 6th, so we can expect the cost/km to go up and the cost/benefit ratio (not to mention average speed) down. I used to be a strong advocate for this, but the more they talk about it, the more it sounds like we're buying a SkyTrain and getting a bus.
For a slightly more ludicrous
but possibly more effective solution, there's been suggestions to build
an elevator from Granville Island itself upwards to the bridge. That'd sync it to the incoming
Connector and possibly a future bus stop (4, 7, 10, 14, 16, 50, basically all the buses on the Mall).