Quote:
Originally Posted by Truenorth00
Going to move this to a more relevant thread....
In any other city, the Trillium Corridor would be twin tracked and electrified and we wouldn't be having this discussion. The best solution to any moderate frequency urban or suburban rail corridor is electrification. Battery or fuel cells are at best a compromise solution. Full electrification has the lowest operating cost, the least disruption (no refuelling time, lower maintenance) and the highest reliability (fewer components and no novel technology).
Second to the above is battery-electric. And that's largely because there's no need to buildout a whole storage and distribution infrastructure, as you would have to for hydrogen. Installing charging gantries at the terminii is relatively easy. Hooking them up to the grid is not an issue.
Hydrogen fuel cells have a very specific application which really doesn't apply to the Trillium Line. Hydrogen fuel cells are great for long, low frequency routes where batteries can't provide enough range and the cost of electrification is not justified because of low frequency. If you want to run a train 95 km through the countryside, a few times a day, hydrogen fuel cells might make sense. A 24 km suburban rail line running 5-6 trains per hour in each direction? Full electrification or battery with charging at the terminii is more sensible.
|
Good Day.
Good choice , good move. Thx.
Twinned and electrified - the ultimate no brainer. Unfortunately, City keeps AVOIDING opportunities to even incrementally get there - Ellwood flyover, Heron and Walkley underpasses, Carling underpass, Carling trench all the way to the Dow's tunnel, Rideau River overpass, Hunt Club overpass , etc. - each providing an incremental opportunity as the moment comes (and goes). Yes, some of this would have been the Phase 2 stuff, but a lot could have been done before, and a lot could still be done since, if the desire is there, which I do not see being there. Even the Carling (Dow's Lake) station expansion is going to be a real B to everyone.
As for the interim - hydrogen or B-E..... as I noted before I have no numbers, but then that is what trials are supposed to be for. In the early days of a tech, which is what/when I had been pushing for when the iLint trains first came out, Alstom would have jumped at a trial opportunity in a location that was already exclusively Lint diesels. Limited - yes, but still useful. We would have been world first - the timing was right then and there. My opinion is that they would have bought the infrastructure for us to run the test, and 'loaned' us the trains at minimal cost (esp. with the bonus of involving a Canadian company product), just when the 'upgrade' to service was happening.
Work or not work would have been a conclusion of the trial, but everybody would have gotten numbers. Comparison to B-E would have been another matter - that tech has improved enormously in the past decade, so a different test now.