HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #1621  
Old Posted May 30, 2023, 3:17 AM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
Imagine living sandwiched between two downtowns and expecting it to be quiet.

4 to 3.8 out of 5 sounds like a rounding error.
Reply With Quote
     
     
  #1622  
Old Posted May 30, 2023, 3:21 AM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,793
Quote:
Originally Posted by phil235 View Post
I think that it is a bit of a leap to conclude that the lower satisfaction rating is due to festivals and shows. Do you have any actual evidence that was the reason? I can think of lots of reasons that satisfaction may have decreased for downtown condo dwellers during that period, starting with the pandemic and the convoy.
And the Chaudière Bridge closures, and the continued lack of retail at Zibi.

The slight decrease in satisfaction is statistically insignificant. A rounding error. I wouldn't read too much into it.
Reply With Quote
     
     
  #1623  
Old Posted May 30, 2023, 4:37 AM
DTcrawler DTcrawler is offline
Registered User
 
Join Date: Feb 2019
Location: Ottawa
Posts: 998
Quote:
Originally Posted by Richard Eade View Post
Honestly, I don’t think that this is a meaningful response. What is your data for such a statement?

According to the 2022 Annual Report on Zibi, there have been residents on the site since July 2020, but that number has been small (140 residents) until the population more than doubled with the opening of Aalto in 2022. The population reached about 360 by the end of 2022. With a small population, it is likely that there would be few complaints.

Also, the CoViD-19 pandemic meant that Cirque du Soleil was on the sight for the second time in 2022. There were no residents within Zibi the last time Cirque was there, in 2017. Thus, this was the first year that they experienced it. It might have been fun and exciting the first year, but we have no idea if they will get tired of hosting it in the future.

According to the surveys carried out by Zibi, there has been a decline in the happiness of the residents living there. In 2020, the happiness rating averaged out to 4 out of 5, with 5 representing ‘Very Happy’. By 2022, that had dropped to 3.8 out of 5. Perhaps with your apparent knowledge of how the Zibi residents feel, you can shed some light on why the level of happiness is falling. Could it be because of the festivals and shows being a disruption?

See the 2022 Annual Report for yourself here: https://zibi.ca/wp-content/uploads/2023/04/UDEV2926_Zibi_2022OnePlanetReport_EN_FA.pdf
Is it much more substantive to suggest that programming isn't feasible due to the residential nature of the development, like the comment I was responding to?

Granted, no, I didn't study the data before making my comment. I based it off anecdotal evidence speaking to the few local residents I met at Festibiere, and from the lack of any CBC articles featuring scowling, cross-armed residents after Cirque du Soleil.

You're right though, those two events, along with any others held at Place des Festivals, may have contributed to the 4% decrease in resident satisfaction you noted.

However, as others have said, I think it's much more likely that those moving into a development like Zibi are seeking the opposite of peace and quiet, and that the slight decrease can be attributed to things like the Chaudiere Bridge construction.
Reply With Quote
     
     
  #1624  
Old Posted May 30, 2023, 2:47 PM
Spoonsy's Avatar
Spoonsy Spoonsy is offline
You call that a knife?
 
Join Date: Jul 2016
Location: Centretown West
Posts: 324
Quote:
Originally Posted by Richard Eade View Post
Could it be because of the festivals and shows being a disruption?
Appendix A

the happiness question is linked with health questions.

"reflecting on your activities and life circumstances, how would you rate your happiness?"

i don't read that as an indicator of satisfaction with the location of nearby events. in 2022 it was largely two outliers responding "1" that pulled the average down

they only had 38 respondents out of 300+ units but yeah if i had a landlord ask me if i was happy or healthy id probably tell them to pound sand too


https://i.imgur.com/lFcovmD.png


https://i.imgur.com/vWSa987.png
Reply With Quote
     
     
  #1625  
Old Posted May 30, 2023, 4:53 PM
DTcrawler DTcrawler is offline
Registered User
 
Join Date: Feb 2019
Location: Ottawa
Posts: 998
Quote:
Originally Posted by Spoonsy View Post
Appendix A

the happiness question is linked with health questions.

"reflecting on your activities and life circumstances, how would you rate your happiness?"

i don't read that as an indicator of satisfaction with the location of nearby events. in 2022 it was largely two outliers responding "1" that pulled the average down

they only had 38 respondents out of 300+ units but yeah if i had a landlord ask me if i was happy or healthy id probably tell them to pound sand too


https://i.imgur.com/lFcovmD.png


https://i.imgur.com/vWSa987.png
Funny how the second respondent from the bottom actually noted “more concerts” in their response. Someone in the 56-65 age range at that.
Reply With Quote
     
     
  #1626  
Old Posted Jun 7, 2023, 12:31 AM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,943
So the new building on the Gatineau Side is officially going to be called Aalto II instead of O II
Reply With Quote
     
     
  #1627  
Old Posted Jun 7, 2023, 2:00 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,886
World Class View + Zero Architectural Merit. This building is almost a non-building, it's so boring to look at that I can barely see it.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1628  
Old Posted Jun 7, 2023, 3:02 AM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
Zibi is really filling up the view from Champlain Bridge. It is almost a continuous skyline.

(I just noticed it going to Calabogie this past weekend with my kids to watch some racing action)
Reply With Quote
     
     
  #1629  
Old Posted Jun 7, 2023, 11:24 AM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,943
Quote:
Originally Posted by Harley613 View Post
World Class View + Zero Architectural Merit. This building is almost a non-building, it's so boring to look at that I can barely see it.
I'm "ok" with Aalto I, but man O and Aalto II are such a disappointment for such a prominent location. Thankfully the Ontario side is a totally different story so far.
Reply With Quote
     
     
  #1630  
Old Posted Jun 7, 2023, 12:48 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,793
What bothers me about Aalto I is the podium and the split beige and charcoal colour. Pick one colour for the podium and one for the tower. The tower and podium are supposed to be distinguishable from one another, not each half of the tower.

O is very bland, but seems high quality. Aalto 2, I'll have to wait for the finished product, but it does seem it will be even blander than O.

They've been doing quite well overall on the Ottawa side, but I'm afraid they are kind of realizing the region has low standards and slowly trying to reach that lower bar.
Reply With Quote
     
     
  #1631  
Old Posted Jun 11, 2023, 3:56 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,943
HERITAGE AT ZIBI: CELEBRATING OUR INDUSTRIAL PAST WITH AN EYE TO THE FUTURE

News May 26, 2023

... What’s next?

Visitors to Zibi will soon have the opportunity to experience the full restoration and adaptive reuse of a former JR Booth building located on the South edge of Albert Island, overlooking the War Museum. The building, which was built after the great fire of 1900, will soon become an office space with retail, weaving the old with the new, including exposed brick walls, and repurposed wood and steel .

Zibi is also in the process of developing conceptual designs for the former stonewalled E.B. Eddy buildings along Taché Boulevard and Eddy Street. Some sections of these buildings have the highest level of heritage protection in Québec with some of the foundations pre-dating the 1900 fire. Consultation on the proposed approach to rehabilitation will take place with the Québec Ministry of culture...

https://zibi.ca/heritage-at-zibi-celebra...A9AA6dd1teCFMs77SOfLYpqX39Kbws47MqY6NNKE
Reply With Quote
     
     
  #1632  
Old Posted Jun 11, 2023, 5:19 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,886
I was hoping the Booth Board Mill would be next up.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1633  
Old Posted Jun 12, 2023, 4:19 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,793
Quote:
Originally Posted by Harley613 View Post
I was hoping the Booth Board Mill would be next up.
Same. The planned hotel for that building would be a huge boon for the area. That will help greatly in supporting restaurants and entertainment.
Reply With Quote
     
     
  #1634  
Old Posted Jun 13, 2023, 1:53 PM
OTownandDown OTownandDown is offline
Registered User
 
Join Date: Jul 2018
Posts: 1,618
I'm apprehensive and excited for the E.B. Eddy Buildings. It's a challenging restoration, and probably will require large swathes of complete dismantling and rebuild, based on the extent of weathering. This has the potential to be really great.

What I'd REALLY like to see is a better cycling connection through the gap to the south of E.B. Eddy, towards the park to the west.


Quote:
Originally Posted by SL123 View Post
HERITAGE AT ZIBI: CELEBRATING OUR INDUSTRIAL PAST WITH AN EYE TO THE FUTURE

News May 26, 2023

... What’s next?

Visitors to Zibi will soon have the opportunity to experience the full restoration and adaptive reuse of a former JR Booth building located on the South edge of Albert Island, overlooking the War Museum. The building, which was built after the great fire of 1900, will soon become an office space with retail, weaving the old with the new, including exposed brick walls, and repurposed wood and steel .

Zibi is also in the process of developing conceptual designs for the former stonewalled E.B. Eddy buildings along Taché Boulevard and Eddy Street. Some sections of these buildings have the highest level of heritage protection in Québec with some of the foundations pre-dating the 1900 fire. Consultation on the proposed approach to rehabilitation will take place with the Québec Ministry of culture...

https://zibi.ca/heritage-at-zibi-celebra...A9AA6dd1teCFMs77SOfLYpqX39Kbws47MqY6NNKE
Reply With Quote
     
     
  #1635  
Old Posted Jun 13, 2023, 2:00 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,886
I wonder if the new triangular building at the West end of the JR Booth Building will be built along with the restoration. We are all wondering if there will be a passageway under it, so I would love to see a detailed plan asap.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1636  
Old Posted Jun 13, 2023, 2:13 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,793
Quote:
Originally Posted by Harley613 View Post
I wonder if the new triangular building at the West end of the JR Booth Building will be built along with the restoration. We are all wondering if there will be a passageway under it, so I would love to see a detailed plan asap.
You'd think that would be essential, since construction equipment will need to go through the courtyard.
Reply With Quote
     
     
  #1637  
Old Posted Jun 13, 2023, 4:24 PM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,363
That stretch of Alexandre-Taché along E.B.Buildings sucks. Speeding cars, dust everywhere, shadows for most of the day. Will be hard to make the building look good with that road as it is right now.

I hope they remove one lane and plant some trees or bushes, add some lighting and pavers. That one lane has been closed for more than a year.

Reply With Quote
     
     
  #1638  
Old Posted Jun 13, 2023, 4:36 PM
Kelnoz Kelnoz is offline
Registered User
 
Join Date: Dec 2020
Posts: 175
Quote:
Originally Posted by zzptichka View Post
I hope they remove one lane and plant some trees or bushes, add some lighting and pavers. That one lane has been closed for more than a year.
Well it's closed because it's the turn lane to get into the bridge, which is closed for now.

One of the proposals for implementation of the tramway through downtown had vehicles shifted North in front of Terrasses where the bus stops are right now, with Taché/Laurier converted to tram only from Montcalm to Portage bridge. That would nicely solve that problem, with plenty of space for wide sidewalks and bike lanes.

I doubt there will be any reorganization of the roads until there's clarity on whether the tramway happens or not, since it's so central to its route.
Reply With Quote
     
     
  #1639  
Old Posted Jun 14, 2023, 6:52 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,793
From Pat on Rail Fans Discord.





Reply With Quote
     
     
  #1640  
Old Posted Jun 15, 2023, 1:16 AM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,943
^it looks just like the renderings! I really appreciate how on the Ontario side we get exactly what we were shown! Cant say the same for the Gatineau side. I remember seeing high quality rendering with very different look from what we've got
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 10:38 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.