Quote:
Originally Posted by J.OT13
Gotta say OCCheetos, I really disagree with you on implementing King Street type transit priority on Bank. In Toronto, drivers have countless other options outside of King to go north-south. In Ottawa, we have three, one of which is poorly linked to the Glebe via residential streets, and the other many advocate for its full closure, either for cars, buses or trams.
Bank remains an important north-south artery from downtown to Alta-Vista and beyond.
|
I think this is an excessively narrow view of what counts as a "north-south" corridor in Ottawa. Riverside->417->Nicholas is a great example of one that is very under-utilized outside of peak periods. Then you have others like Main->Elgin, or Prince of Wales->Preston, etc. These all run north-south, and I'm assuming these some or all of these weren't the ones you were counting.
A north-south corridor for cars doesn't need to be a straight line from start to finish. There are plenty of other options for people coming from Alta Vista and beyond. I'm reminded of this picture after reading these posts:
Anyway, it's not like the King Street priority corridor makes zero exceptions to the rules at some intersections (e.g. King and Bay). We can, and should, implement strict transit priority on Bank, even if it's just more restricted left turns and a few parking spots replaced with proper bus platforms.
Quote:
|
Even removing street parking is a tough sell considering the activity at Lansdowne. Maybe when we have our downsized facilities.
|
Isn't street parking on Bank already prohibited during major events?
If anything, events at Lansdowne are all the more reason to ban street parking on Bank. The amount of traffic caused by drivers trying to parallel park on an already packed arterial road is unjustifiable.
Now if by "tough sell" you mean to local residents and businesses, then I guess so, as bad as that is. But it really shouldn't be this difficult to sell the removal of street parking to members of an urbanism forum, especially when the goal is to improve transit services along said corridor.
Quote:
|
I've made my point before that I think using QED as a Transitway is the best way forward to not only improve accessibility by transit, but as a proof of concept for any large investment in rail (be it tram or light-metro, usage of a QED transitway will tell).
|
This is just recycling the same old formula of building transit on out-of-the-way corridors that are cheaper and easier to build on. I'm sure it'll work, but is that really going to shut the Bank Street subway people up? I doubt it.
At the end of the day, there are still a lot of hand-wavy car-centric arguments being made here.