A Bank Street subway WILL happen, but only after decades of environmental and feasibility studies, arguments between the four levels of government, and endless community consultation and obstruction. We can't build things in Ottawa until we have spent more studying building them than they would have cost when they were first needed.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #3122  
Old Posted Jun 8, 2023, 7:08 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
I'd argue that applies to Canada in general.

Edmonton, us, and Toronto seem to be fighting for the incompetence in transit projects crown, and Montreal seems to be a runner up with it's perpetual planned and cancelled Metro extensions. Hopefully REM has a smooth launch
Reply With Quote
     
     
  #3123  
Old Posted Jun 8, 2023, 7:22 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is online now
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,691
A Bank Street Subway can only happen if the city nurtures a transit culture and demand on that corridor. Start by putting 5-minute frequency on the buses there, then maybe a tram from Wellington to Billings Bridge. If there's no demand or need, it's not going to happen.
Reply With Quote
     
     
  #3124  
Old Posted Jun 8, 2023, 7:27 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Quote:
Originally Posted by Kitchissippi View Post
A Bank Street Subway can only happen if the city nurtures a transit culture and demand on that corridor. Start by putting 5-minute frequency on the buses there, then maybe a tram from Wellington to Billings Bridge. If there's no demand or need, it's not going to happen.
Absolutely no investment in a tramway. That's hundreds of millions down the toilet. There was a tram there from 1891 to 1959. It didn't work well then (buses were faster on a parallel route) and it will work worse now.

The city absolutely no interest in running more frequent buses on Bank. OC Transpo is not mandated to increase ridership. Besides, there is close to 5 minute frequency between Route 6 and 7 already.
Reply With Quote
     
     
  #3125  
Old Posted Jun 8, 2023, 8:58 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by lrt's friend View Post
Absolutely no investment in a tramway. That's hundreds of millions down the toilet. There was a tram there from 1891 to 1959. It didn't work well then (buses were faster on a parallel route) and it will work worse now.

The city absolutely no interest in running more frequent buses on Bank. OC Transpo is not mandated to increase ridership. Besides, there is close to 5 minute frequency between Route 6 and 7 already.
The official frequency is pretty decent, it's that bus bunching is terrible. The easy way to fix that involves removing the sacred cow of on street parking and making permanent bus lanes
Reply With Quote
     
     
  #3126  
Old Posted Jun 9, 2023, 2:52 AM
OCCheetos OCCheetos is online now
Registered User
 
Join Date: Aug 2017
Posts: 2,113
Quote:
Originally Posted by lrt's friend View Post
Absolutely no investment in a tramway. That's hundreds of millions down the toilet.
And a far more expensive subway would be different because...?

Quote:
There was a tram there from 1891 to 1959. It didn't work well then (buses were faster on a parallel route) and it will work worse now.
For the sake of discussion, a streetcar is not a tram.

Grade separated transit is built to support needed capacity, not speed. Speed is often a side benefit, but you do not spend several times more money than you may need to in order to shave a few minutes off a trip.

There is no guarantee that a Bank Street subway would be faster than a bus, or a tram.
Quote:
OC Transpo is not mandated to increase ridership.
I don't know what level of pedanticism you are willing to descend to this time, but that's not true.

Straight from the Transit Commission's terms of reference:
Now there's no argument that the commission isn't fulfilling this mandate, but these are decisions that come from above OC Transpo.

Quote:
Besides, there is close to 5 minute frequency between Route 6 and 7 already.
You are complaining that OC Transpo doesn't care to increase ridership, but then you give them a free pass for this...?

The 6 and 7 only run at that level during peak periods. Outside of those periods, the fall off in service levels is steep, particularly in evenings. On top of that, you only get this level of service between Sunnyside and Rideau. Beyond that, you get the base level of service on each route which isn't very good.

Quote:
Originally Posted by kmcamp View Post
The official frequency is pretty decent, it's that bus bunching is terrible. The easy way to fix that involves removing the sacred cow of on street parking and making permanent bus lanes
lrt's friend has made their opinion on this clear in the past, and frankly I think they share the lack of vision that they accuse OC Transpo of having.

If you want to make transit a priority on Bank Street, we can already do it! We don't need to build a subway. Just reimplement the King Street transit priority project on Bank. End of story.
Reply With Quote
     
     
  #3127  
Old Posted Jun 9, 2023, 2:01 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,044
Reply With Quote
     
     
  #3128  
Old Posted Jun 9, 2023, 3:27 PM
Spoonsy's Avatar
Spoonsy Spoonsy is online now
You call that a knife?
 
Join Date: Jul 2016
Location: Centretown West
Posts: 326
most of the rail-based heavy machinery from bayview disappeared in the last two days, today they are removing construction fencing and installing final chain-link

i walk my dog past bayview a few times a day so i'll be sure to take a pic of the first train i see
Reply With Quote
     
     
  #3129  
Old Posted Jun 9, 2023, 3:35 PM
OTSkyline OTSkyline is offline
Registered User
 
Join Date: Jun 2012
Posts: 2,826
12 minutes is really a shame, and the bare minimum.

Is there no way to improve frequency without more double-tracking?
And is 12 minutes going to be offered day/week long? Or is that the "peak" frequency and frequency drops down to 15-20minutes nights & weekends?
Reply With Quote
     
     
  #3130  
Old Posted Jun 9, 2023, 4:00 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,044
Quote:
Originally Posted by OTSkyline View Post
12 minutes is really a shame, and the bare minimum.

Is there no way to improve frequency without more double-tracking?
And is 12 minutes going to be offered day/week long? Or is that the "peak" frequency and frequency drops down to 15-20minutes nights & weekends?
There's no way of improving that without double tracking Walkley Station, which would bring frequency up to 10 minutes. I'm sure someone could provide more precise numbers, but the cost of that was estimated at around $20 million about 4 years ago. Since then, the City spent a couple million rehabilitating the overpass that would need to be replaced for that double tracking.

The 12 minute frequency should be all day, expect maybe when the Confederation Line drops to 15 minutes after 11pm.
Reply With Quote
     
     
  #3131  
Old Posted Jun 9, 2023, 8:48 PM
kmcamp kmcamp is offline
Registered User
 
Join Date: Sep 2016
Posts: 1,401
Quote:
Originally Posted by J.OT13 View Post
There's no way of improving that without double tracking Walkley Station, which would bring frequency up to 10 minutes. I'm sure someone could provide more precise numbers, but the cost of that was estimated at around $20 million about 4 years ago. Since then, the City spent a couple million rehabilitating the overpass that would need to be replaced for that double tracking.

The 12 minute frequency should be all day, expect maybe when the Confederation Line drops to 15 minutes after 11pm.
The 12 minute frequency I can live with, if the train actually keeps up a good pace.

When they "upgraded" the line last time, I found myself wishing for the old 15 minute frequency they used to have while sitting in that siding at Walkley. The slightly higher frequency was more than offset by much slower trains
Reply With Quote
     
     
  #3132  
Old Posted Jun 9, 2023, 9:53 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Quote:
Originally Posted by OCCheetos View Post
And a far more expensive subway would be different because...?
The original comment was to invest in a tramway as a step towards a subway. It seems that investing twice for rail transit on Bank is unlikely and wasteful.

Quote:
Originally Posted by OCCheetos View Post
For the sake of discussion, a streetcar is not a tram.
My understanding that the term 'streetcar' is only used in North America. Elsewhere, they are called 'trams'. Let's not micro-define various types of rail transit vehicles.


Quote:
Originally Posted by OCCheetos View Post
Grade separated transit is built to support needed capacity, not speed. Speed is often a side benefit, but you do not spend several times more money than you may need to in order to shave a few minutes off a trip.

There is no guarantee that a Bank Street subway would be faster than a bus, or a tram.
It is a revelation to me that transit operating in traffic and facing numerous traffic signals would operate as fast as grade-separated transit.


Quote:
Originally Posted by OCCheetos View Post
I don't know what level of pedanticism you are willing to descend to this time, but that's not true.

Straight from the Transit Commission's terms of reference:


Now there's no argument that the commission isn't fulfilling this mandate, but these are decisions that come from above OC Transpo.
I don't know what the point of this is. Comments have been made in this discussion group just recently that OC Transpo will only increase service based on demand. I don't know how we increase ridership without some selective investment. Does it really matter what the 'official' mandate is? What matters is the policies that have been followed in the last several years and comments that have been made by transit officials.


Quote:
Originally Posted by OCCheetos View Post
You are complaining that OC Transpo doesn't care to increase ridership, but then you give them a free pass for this...?

The 6 and 7 only run at that level during peak periods. Outside of those periods, the fall off in service levels is steep, particularly in evenings. On top of that, you only get this level of service between Sunnyside and Rideau. Beyond that, you get the base level of service on each route which isn't very good.
You take my comment out of context. The original comment was that we need to start with 5 minute service as a first step. My comment is that we are already close to this, perhaps not in all service hours, but in many service hours. I am all for making Bank Street a very frequent transit corridor sooner than later.


Quote:
Originally Posted by OCCheetos View Post
lrt's friend has made their opinion on this clear in the past, and frankly I think they share the lack of vision that they accuse OC Transpo of having.

If you want to make transit a priority on Bank Street, we can already do it! We don't need to build a subway. Just reimplement the King Street transit priority project on Bank. End of story.
This is your opinion. I believe that this would be disastrous for Bank Street businesses. We seem to believe that 'all' north-south transportation routes can be sacrificed.
Reply With Quote
     
     
  #3133  
Old Posted Jun 9, 2023, 10:51 PM
OCCheetos OCCheetos is online now
Registered User
 
Join Date: Aug 2017
Posts: 2,113
Quote:
Originally Posted by lrt's friend View Post
My understanding that the term 'streetcar' is only used in North America. Elsewhere, they are called 'trams'. Let's not micro-define various types of rail transit vehicles.
You know that wasn't the point.

The Bank Street tram/streetcar did not operate in a segregated right of way.


Quote:
I don't know what the point of this is. Comments have been made in this discussion group just recently that OC Transpo will only increase service based on demand. I don't know how we increase ridership without some selective investment. Does it really matter what the 'official' mandate is? What matters is the policies that have been followed in the last several years and comments that have been made by transit officials.
It's true. OC Transpo will only add more service as existing demand increases. It shouldn't be difficult for anyone who follows transit matters to understand why though: OC Transpo can't exceed their approved budget.

You're right that it requires selective investment, but it's very important to understand the distinction of responsibilities here. The people who set transit policies clearly have a mandate to attract more riders.

Yes, the transit commission and city council have not done a good job of that over the years, but please don't drag this conversation down with nonsense claims like this.


Quote:
This is your opinion. I believe that this would be disastrous for Bank Street businesses. We seem to believe that 'all' north-south transportation routes can be sacrificed.
All the more evidence that you'd be okay with spending literally billions of dollars specifically to save on-street parking.
Reply With Quote
     
     
  #3134  
Old Posted Jun 10, 2023, 12:08 AM
Williamoforange's Avatar
Williamoforange Williamoforange is offline
Registered User
 
Join Date: Sep 2020
Location: Ottawa
Posts: 873
Quote:
Originally Posted by lrt's friend View Post
This is your opinion. I believe that this would be disastrous for Bank Street businesses. We seem to believe that 'all' north-south transportation routes can be sacrificed.
There are no north-south transportation option being sacrificed through the removal of parking on bank st. Opposite is true in that Buses would get better, and it would provide actual local rapid transit, unlike a stubway for the suburbs.

It also would not be disastrous for the majority of the businesses on Bank, most of which customers are local, this could also be dealt with through building parking garages if truly required. Instead your defending on-street parking for major corridor over better bus transit....
Reply With Quote
     
     
  #3135  
Old Posted Jun 10, 2023, 1:27 AM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
Quote:
Originally Posted by OCCheetos View Post
It's true. OC Transpo will only add more service as existing demand increases. It shouldn't be difficult for anyone who follows transit matters to understand why though: OC Transpo can't exceed their approved budget.

You're right that it requires selective investment, but it's very important to understand the distinction of responsibilities here. The people who set transit policies clearly have a mandate to attract more riders.

Yes, the transit commission and city council have not done a good job of that over the years, but please don't drag this conversation down with nonsense claims like this.
The thing that bothers me though is no one at OC Transpo seems to provide Council with options to increase ridership. Like, "OK, Transit Commission, you say you want to increase ridership, here are X, Y, and Z options to do so". Then if Transit Commission votes those options down, at least they were given the choices.

Perhaps you could say that OC Transpo is being held-back politically from even presenting those options, but that isn't how it's supposed to work so I still blame them (at least partially) for not having the political bravery to present the options that might help them break out of their ridership decline.
Reply With Quote
     
     
  #3136  
Old Posted Jun 10, 2023, 2:06 AM
YOWetal YOWetal is offline
Registered User
 
Join Date: Oct 2006
Posts: 7,742
Quote:
Originally Posted by Multi-modal View Post
The thing that bothers me though is no one at OC Transpo seems to provide Council with options to increase ridership. Like, "OK, Transit Commission, you say you want to increase ridership, here are X, Y, and Z options to do so". Then if Transit Commission votes those options down, at least they were given the choices.

Perhaps you could say that OC Transpo is being held-back politically from even presenting those options, but that isn't how it's supposed to work so I still blame them (at least partially) for not having the political bravery to present the options that might help them break out of their ridership decline.
With near certainty there is nothing that could make a substantial difference to the 2023 ridership numbers. Even if money was no object what would make a big difference? Small increases could happen from some new or more frequent routes but at great cost per additional rider.
Reply With Quote
     
     
  #3137  
Old Posted Jun 10, 2023, 2:59 AM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
Quote:
Originally Posted by YOWetal View Post
With near certainty there is nothing that could make a substantial difference to the 2023 ridership numbers. Even if money was no object what would make a big difference? Small increases could happen from some new or more frequent routes but at great cost per additional rider.
To quote the Simpsons: "We've tried nothing and we're all out of ideas"
Reply With Quote
     
     
  #3138  
Old Posted Jun 10, 2023, 4:59 AM
OCCheetos OCCheetos is online now
Registered User
 
Join Date: Aug 2017
Posts: 2,113
Quote:
Originally Posted by Multi-modal View Post
The thing that bothers me though is no one at OC Transpo seems to provide Council with options to increase ridership. Like, "OK, Transit Commission, you say you want to increase ridership, here are X, Y, and Z options to do so". Then if Transit Commission votes those options down, at least they were given the choices.

Perhaps you could say that OC Transpo is being held-back politically from even presenting those options, but that isn't how it's supposed to work so I still blame them (at least partially) for not having the political bravery to present the options that might help them break out of their ridership decline.
This is expressly not the responsibility of OC Transpo. That is what the Transit Commission is for.

OC Transpo's role is to execute the direction of the Transit Commission, or otherwise tell the Commission that something isn't possible for X, Y, or Z reasons. Beyond that, they are limited to whatever they can do under the authority that has been delegated to them by the Commission, which isn't a lot.

Laying out an entire plan to increase ridership goes beyond the scope of work that the Commission has approved (other than the current route review, if you count it), and coming up with such a plan would require more staff resources than are available.

In short: the Commission has to ask for those options. Staff preparing those options on their own terms would (presumably) be a violation of their delegated authority.
Reply With Quote
     
     
  #3139  
Old Posted Jun 10, 2023, 2:15 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,805
Quote:
Originally Posted by Williamoforange View Post
There are no north-south transportation option being sacrificed through the removal of parking on bank st. Opposite is true in that Buses would get better, and it would provide actual local rapid transit, unlike a stubway for the suburbs.

It also would not be disastrous for the majority of the businesses on Bank, most of which customers are local, this could also be dealt with through building parking garages if truly required. Instead your defending on-street parking for major corridor over better bus transit....
When we talk about King Street transit priority, this is more than the elimination of on street parking.

On the subject of implementing or even suggesting proposals to increase ridership, from the public perspective, it does not matter the involvement of the commission or staff, it is all the OC Transpo bureaucracy. We need to cut through this and make some progress.
Reply With Quote
     
     
  #3140  
Old Posted Jun 10, 2023, 10:10 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,805
I keep trying to make transit work but it becomes embarrassing.

The R2 bus is unreliable sh*t. The schedule isn't even a suggestion. I tried to allow ample time to meet friends at the Italian festival, but the bus didn't show up. Another family of 4, gave up and decided to skip the Italian festival and went directly to another location.

I eventually got there and with both Line 1 and Line 2 not functioning (or not operating as normal) and all the bus routes detoured, I believe that the vast majority of the thousands who went arrived by private vehicle or some other non-transit means. Virtually nobody used the R2 to reach the festival.

The city would consider this a success with thousands in attendance, but what are we doing having most people drive to an urban festival? And making transit unviable alternative for most points to a future where alternative transportation is not considered a reasonable choice.

One of our group from Orleans commented on never taking the Confederation Line again after having to use it daily starting in 2019 and the awful experience that followed. It doesn't take much for most people to right off transit.

I understand that this is all anecdotal, but we ignore this at our peril.

Regarding Trillium Line construction, the station at Carleton University is not close to completion and the new pedestrian bridge across the Rideau still has no floor. I think there is still time for a fall completion of both, but progress seems behind other locations.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 3:13 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.