Quote:
Originally Posted by superelevation
I think you need to consider these numbers with a grain of salt, the way ridership and capacity is calculated from system to system varies and Vancouver tends to predict higher than average capacity (based on a given train frequency and size) than a lot of other cities.
TTC uses a pretty reasonable crowding standard for crush loaded trains as well iirc.
At the end of the day the capacities are just not in the same ballpark. TTC uses fully open gangway 6 car trains with cars that are wider and longer than the cars used on the Canada Line. (A Toronto Rocket Subway Train is ~138m x 3.1m when compared to a Mark V which is ~82m x 2.7m - plus the rockets have 24 doors on each side while the MV has 15) The theoretical frequency is also not far off the Expo Line as Toronto recently implemented moving block signalling on Line 1.
|
It's that TTC normally estimate capacity on the lower side, but not by that much as you suggested.
Typical capacity estimate for a MkV train is 660 passengers (I use the average for 650-675).
TTC Rocket is stated at 1080 passengers capacity.
For SkyTrain, the maximum design frequency is 75s, so 48 trains per hour.
TTC after signaling upgrade can run up to 30-32 trains per hour (instead of 25 before upgrade)
So just do the math:
Van SkyTrain: 660 passengers/train * 48 trains/hour = 31,680 pphpd
TTC Subway: 1080 passengers/train *32 trains/hour = 34,560 pphpd
Although neither of the above had been achieved or may not even proven to be possible yet. TTC I believe only ran up to 30 trains/hr after the upgrade, and Vancouver ran the system consistently with 43 trains/hr during the Olympics. Both are lower now due to COVID and lack of rolling stock. The TTC capacity quoted is using the 30 trains/hr maximum.
And for the second part about capacity per train... again, just do some calculation:
Van SkyTrain: 660 passengers / (85m x 2.7m) = 2.87 passengers/m^2
TTC Subway: 1080 passengers / (138m x 3.1m) = 2.52 passengers/m^2
Keep in mind that you have to take off a few meters on both end of TTC for the driver's cab. So the estimate should be even closer to the number above.
Typically, maximum capacity is 4 pass/m^2, and crush load is 6 pass/m^2
So both estimate are well below industry standard. I believe in one of the Bombardiar brochure for the ART system, the stated maximum capacity is something like 54,000 pphpd for a 6 car train