Probably this summer? They had some semi-trailer unloading steel beams in May 2023.
Quote:
>BP: To construct a 1-storey with crawl space, vertical addition to the roof of Level 9, to house additional emergency generators and they are backups for the existing emergency generators, as approved by
Quote:
12th Floor
Exterior and Interior alterations to provide improvements to this existing mixed use building on this site.
Scope of work:
- Install three new mechanical units on root.
- Deconstruct interior walls, light fixtures and outlets.
- Construct new walls
- Electrical and HVAC to suit.
- Remove existing glazing unit at NW and Install new Louver in existing opening
- New kitchen millwork and finishes
- New HRV Unit
Yeah they took the crane down around the first week of June for Butterfly and the panels seem to match around that time. There's still two cranes in the 3D walkthrough.
He meant they took down the first crane at the Butterfly in June,
and in the VCII 3D walkthrough video, there are still 2 cranes at the Butterfly,
so the 3D walkthrough must have been at or before June.