HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


Reply

 
Thread Tools Display Modes
     
     
  #1581  
Old Posted May 23, 2023, 7:32 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
One tall signature tower would do wonders for the island for sure, it would really draw the eye and make the development stand out.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1582  
Old Posted May 23, 2023, 8:55 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,394
Quote:
Originally Posted by rocketphish View Post
March 2023

Updated design for 315 Miwate/505 Prive de la Chaudiere (Block 204):
https://devapps.ottawa.ca/en/applications/D02-02-22-0040/details
Are there similar PDFs for the Quebec side somewhere?
Reply With Quote
     
     
  #1583  
Old Posted May 23, 2023, 10:55 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
Quote:
Originally Posted by rocketphish View Post
March 2023

Updated design for 315 Miwate/505 Prive de la Chaudiere (Block 204):
https://devapps.ottawa.ca/en/applications/D02-02-22-0040/details

Weird that they plopped this rendering into an early rendering of the completed site, with none of the completed projects in sight.

Quote:
Originally Posted by OTownandDown View Post
The pointy red building on the right, does that contain a pass-thru so I can walk from the Albert Island courtyard to Chaudiere Private bridge? Or is this going to be a 'private' courtyard?
No clue a this point, but I certainly hope so. I have faith they will figure that out.

Quote:
Originally Posted by zzptichka View Post
Are there similar PDFs for the Quebec side somewhere?
Sort of. Here's the website, but it's pretty terrible. You have to look at it month per month instead of by address or a map.

https://www.gatineau.ca/portail/default.aspx?p=nouvelles_annonces/avis_publics&ref=haut-de-page
Reply With Quote
     
     
  #1584  
Old Posted May 24, 2023, 11:39 AM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,976
According to DevApp Block 204's application has been Approved. If they do in fact get shovels in the ground this year I'll be very impressed at how fast they're building Zibi on the Ontario side
Reply With Quote
     
     
  #1585  
Old Posted May 25, 2023, 10:13 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896


__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1586  
Old Posted May 25, 2023, 11:04 PM
Coho Coho is offline
Registered User
 
Join Date: Apr 2022
Posts: 130
Any plans for a grocery store somewhere in Zibi?
Reply With Quote
     
     
  #1587  
Old Posted May 26, 2023, 12:01 AM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,127
Na man... zipline uber delivery.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #1588  
Old Posted May 26, 2023, 12:39 PM
OTSkyline OTSkyline is offline
Registered User
 
Join Date: Jun 2012
Posts: 2,826
So if I'm not mistaken this is only the 2nd residential project on the islands, right? The midrise to the side was condos I believe and this tower will be rentals?

Surprised they have just as much if not more office space on the islands than residential at this point.
Reply With Quote
     
     
  #1589  
Old Posted May 26, 2023, 1:43 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
Quote:
Originally Posted by Coho View Post
Any plans for a grocery store somewhere in Zibi?
Only spot where one is planned at this time is in, what was supposed to be, an office tower on Laurier in Hull.

Good thing is, a grocery store is planned at W/E 2 on Eddy, which isn't too far.

Quote:
Originally Posted by OTSkyline View Post
So if I'm not mistaken this is only the 2nd residential project on the islands, right? The midrise to the side was condos I believe and this tower will be rentals?

Surprised they have just as much if not more office space on the islands than residential at this point.
Pre-pandemic, the plan was to build more office space than residential (at least, in terms of employee/residents ratio). At the time, the region had an office space shortage. Expect a lot of the planed office space to be built as condos/apartments now.
Reply With Quote
     
     
  #1590  
Old Posted May 26, 2023, 1:44 PM
OTownandDown OTownandDown is offline
Registered User
 
Join Date: Jul 2018
Posts: 1,636
Geeze, you'd think they were trying to build a community or something.
Reply With Quote
     
     
  #1591  
Old Posted May 26, 2023, 2:17 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,394
Grocery is supposed to go in block 07. No work started on it yet.



Reply With Quote
     
     
  #1592  
Old Posted May 26, 2023, 2:18 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
Interesting that this one is getting clad with very light beige brick, I don't think we had that in any renders.

__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1593  
Old Posted May 26, 2023, 2:31 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,394


According to their 2022 map, we are supposed to be in Phase 3 on Quebec side already. Nothing from Phase 2 has been started yet though.
Reply With Quote
     
     
  #1594  
Old Posted May 26, 2023, 2:43 PM
OTSkyline OTSkyline is offline
Registered User
 
Join Date: Jun 2012
Posts: 2,826
I was thinking the same. Looking at that timeline, it seems they are a bit behind in Ontario (they haven't started anything in Phase 2 yet and won't be finished phase 1 next year).

But on the Quebec side, they have maybe 4 buildings in phase 1 completed or started (still many to go) and nothing in phase 2 or 3 started yet.
Reply With Quote
     
     
  #1595  
Old Posted May 26, 2023, 3:05 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
No doubt the pandemic, labour shortage and high interest rates slowed down the project. Still going up at a relatively quick pace for local standards, and with high quality designs and builds (at least, on the Ontario side).
Reply With Quote
     
     
  #1596  
Old Posted May 26, 2023, 3:08 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
I'm sure a good chunk of all that planned office space is being redesigned as residential as well, I can't see them building/renovating around 20 buildings for office use post pandemic.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1597  
Old Posted May 26, 2023, 6:39 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,976
Quote:
Originally Posted by Harley613 View Post
I'm sure a good chunk of all that planned office space is being redesigned as residential as well, I can't see them building/renovating around 20 buildings for office use post pandemic.
Block 204 is a prime example. it was supposed to be commercial/office and its now been proposed has a residential tower
Reply With Quote
     
     
  #1598  
Old Posted May 29, 2023, 2:10 AM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
When the temporary shipping container tower comes down, they should replace it with something like this in Montreal:


https://twitter.com/Montreal/status/1658957519320915969

https://www.port-montreal.com/en/the-port-of-montreal/news/news/press-release/tower-opening
Reply With Quote
     
     
  #1599  
Old Posted May 29, 2023, 10:49 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
Quote:
Originally Posted by J.OT13 View Post
When the temporary shipping container tower comes down, they should replace it with something like this in Montreal:


https://twitter.com/Montreal/status/1658957519320915969

https://www.port-montreal.com/en/the-port-of-montreal/news/news/press-release/tower-opening
If they built a permanent observation tower like this they would have to move it, because there is nothing to see now that the three towers are up.
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #1600  
Old Posted May 29, 2023, 12:58 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,116
Quote:
Originally Posted by Harley613 View Post
If they built a permanent observation tower like this they would have to move it, because there is nothing to see now that the three towers are up.
Best spot might be somewhere in the grassy area here, in front of O1, or on the other side of the stairs. Or anywhere between the stairs and the Portage Bridge. Could be part of the ZibiLine on the Hull side.

Quote:
Originally Posted by Harley613 View Post
The new building is getting uglier by the minute

Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 8:31 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.