Quote:
Originally Posted by DyAm00394
Construction has to be starting very soon. Today they are continuing with moving the white-wrapped material from the area where the 6-storey SW building will be to closer to the seawall. (The material is lined up in a straight line right at the edge).
|
Not to burst your bubble, but Harbour Passage will be removed from Water St and wrapped around the perimeter of FQ this summer (as soon as the Market Slip public space is completed). It's almost definitely for that.
I do hope the city opens the northeast and northwest sites for parking or something more exciting this summer too. Leaving money on the table to let it sit un-used.