  #461  
Old Posted Mar 10, 2023, 6:15 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by Hybrid247 View Post
Not really. It's labelled as "Protected Transportation Corridor" in Ottawa's new Official Plan, which is a downgrade from its previous status as part of the ultimate O-Train network in the previous OP. Tunney's Pasture to Bayview eastbound represents the AM rush hour peak load in ridership forecasts, so I think they realized that Bayview wouldn't be able to handle the extra ridership that would come from Gatineau if they extended Line 2 over the river.
Bayview makes a decent alternate transfer point for those not heading towards downtown, but a direct line is needed for those who are. As a result, I could see the Chief William Commanda Bridge being a secondary or tertiary crossing, but it should never be the primary crossing.
Reply With Quote
     
     
  #462  
Old Posted Mar 13, 2023, 12:45 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by roger1818 View Post
Bayview makes a decent alternate transfer point for those not heading towards downtown, but a direct line is needed for those who are. As a result, I could see the Chief William Commanda Bridge being a secondary or tertiary crossing, but it should never be the primary crossing.
Reply With Quote
     
     
  #463  
Old Posted Apr 17, 2023, 4:57 PM
stolenottawa stolenottawa is offline
Registered User
 
Join Date: May 2019
Posts: 132
Reply With Quote
     
     
  #464  
Old Posted Apr 17, 2023, 5:19 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,963
Quote:
Originally Posted by stolenottawa View Post
I agree with this paragraph below a 100%
Quote:
I can see a case for extending light rail from Moodie Drive as far as Eagleson Road or Terry Fox Drive, then connecting to a bus-only transitway in two directions: north along March Road toward the technology park, and west towards Stittsville.
Reply With Quote
     
     
  #465  
Old Posted Apr 17, 2023, 5:32 PM
Takingoff Takingoff is offline
Registered User
 
Join Date: Sep 2022
Posts: 41
Quote:
Originally Posted by SL123 View Post
I agree with this paragraph below a 100%
I second this. In Germany, these suburbs would be considered satellite towns, served by a single s-bahn with good frequency and links to the larger urban core.

This model works when paired with good bus service to the main rail line. This is cheaper, more flexible, and ultimately provides better service to more people.
Reply With Quote
     
     
  #466  
Old Posted Apr 17, 2023, 9:01 PM
originalmuffins originalmuffins is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 877
Quote:
Originally Posted by stolenottawa View Post
Stupid. That's almost 300k of Ottawa's population not getting access to LRT. I don't care what people think of them being satellite towns, they are important areas to have access to stop sprawl and define city limits between already existing BOROUGHS of our city. Our city hasn't had good bus service, and got worse with our new council, it's not going to magically get better because we call it "Stage 3 BRT".
Reply With Quote
     
     
  #467  
Old Posted Apr 17, 2023, 9:49 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Quote:
Originally Posted by originalmuffins View Post
Stupid. That's almost 300k of Ottawa's population not getting access to LRT. I don't care what people think of them being satellite towns, they are important areas to have access to stop sprawl and define city limits between already existing BOROUGHS of our city. Our city hasn't had good bus service, and got worse with our new council, it's not going to magically get better because we call it "Stage 3 BRT".
Agree 100%

We keep getting told that a good transit system means transfers. In the case of Ottawa, the more transfers the better.

Our transit system and our downtown are both sunk if getting to downtown mean two transfers for much of the city.

I have commented repeatedly that permanently terminating the Trillium Line at Limebank and using BRT for the remainder of the line to Barrhaven, guarantees failure of the BRT portion and considerably lower ridership. Will we ever have more than 30 minute frequency beyond LImebank? I doubt it. A mandatory transfer on a major transit line guarantees ridership loss. It becomes a mobility barrier.
Reply With Quote
     
     
  #468  
Old Posted Apr 17, 2023, 10:03 PM
JHikka's Avatar
JHikka JHikka is offline
ハルウララ
 
Join Date: Jul 2009
Location: Toronto
Posts: 12,853
Quote:
Originally Posted by originalmuffins View Post
Stupid. That's almost 300k of Ottawa's population not getting access to LRT. I don't care what people think of them being satellite towns, they are important areas to have access to stop sprawl and define city limits between already existing BOROUGHS of our city. Our city hasn't had good bus service, and got worse with our new council, it's not going to magically get better because we call it "Stage 3 BRT".
For me, Ottawa City Limits are whatever is inside the Greenbelt. Everything outside of that is sprawling suburb that I don't have any interest in. I don't see any particular reason why we should extend LRT to these far reaches when there are still such obvious improvements to be made to transit in the core.

And they would still get BRT anyway, which most of the time would suit the needs of these areas.
Reply With Quote
     
     
  #469  
Old Posted Apr 17, 2023, 11:01 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,072
Quote:
Originally Posted by originalmuffins View Post
Stupid. That's almost 300k of Ottawa's population not getting access to LRT.
Much like 200k of central and eastern Ottawa's population also not getting access to LRT. If we're in no rush to bring higher-order urban transit to the core, I see no reason any more to rush building it out to Kanatahaven.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #470  
Old Posted Apr 17, 2023, 11:02 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,072
Quote:
Originally Posted by JHikka View Post
For me, Ottawa City Limits are whatever is inside the Greenbelt. Everything outside of that is sprawling suburb that I don't have any interest in. I don't see any particular reason why we should extend LRT to these far reaches when there are still such obvious improvements to be made to transit in the core.
It's pretty clear by now that the only role that the core has to play in transit policy in this supposed city, is that it subsidizes the construction and operation of transit in the suburbs.
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #471  
Old Posted Apr 17, 2023, 11:44 PM
originalmuffins originalmuffins is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 877
Quote:
Originally Posted by JHikka View Post
For me, Ottawa City Limits are whatever is inside the Greenbelt. Everything outside of that is sprawling suburb that I don't have any interest in. I don't see any particular reason why we should extend LRT to these far reaches when there are still such obvious improvements to be made to transit in the core.

And they would still get BRT anyway, which most of the time would suit the needs of these areas.
It would not suit the needs of the area, it creates a disjointed system. And we aren't going to sit here and think an archaic city limit line such as the failed greenbelt are the city limits lol. They are as much as the city is as any other district is, and if you want to avoid MORE sprawl, then you bring LRT to it and allow more TOD in their boroughs.

Quote:
Originally Posted by Uhuniau View Post
Much like 200k of central and eastern Ottawa's population also not getting access to LRT. If we're in no rush to bring higher-order urban transit to the core, I see no reason any more to rush building it out to Kanatahaven.
It is very laughable if you think that 200k of central and eastern Ottawa are getting anything in lieu of Stage 3. We aren't, what we are getting is a city council looking to scrape dollars. If we don't get stage 3, then we aren't all of a sudden getting a Bank St subway. They're already cutting back on bus service yet they want to replace a plan for LRT expansion on a service they're cutting back on? What a smart idea.

300,000 people are people that have been paying into their taxes, are some of them NIMBYs? Sure, but not all, and the plans around their future development is high density and conversions to street level walkability to combat the sprawl that was to happen even longer. If we say "oh ho ho ho kanata and barrhaven far, who cares about them", then none of us should be complaining about further sprawl and the city being car centric, because that is what will happen without LRT to these areas. That TOD and density is planned because there's a plan for stage 3 LRT.

Last edited by originalmuffins; Apr 18, 2023 at 12:39 AM.
Reply With Quote
     
     
  #472  
Old Posted Apr 17, 2023, 11:45 PM
originalmuffins originalmuffins is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 877
Quote:
Originally Posted by Uhuniau View Post
It's pretty clear by now that the only role that the core has to play in transit policy in this supposed city, is that it subsidizes the construction and operation of transit in the suburbs.
That's laughable, considering LRT is primarily only in the core at the moment. These further stages expand it so that people wherever they are in the city can access wherever they want to go within Ottawa without relying on a car.
Reply With Quote
     
     
  #473  
Old Posted Apr 18, 2023, 12:38 AM
GeoNerd GeoNerd is offline
Registered User
 
Join Date: May 2010
Location: Ottawa, ON.
Posts: 552
Quote:
Originally Posted by originalmuffins View Post
That's laughable, considering LRT is primarily only in the core at the moment. These further stages expand it so that people wherever they are in the city can access wherever they want to go within Ottawa without relying on a car.
How is LRT primarily in the core? It skims the edge of the inner city on it's way from the downtown business district out to the suburbs (evenutally). Almost no dense inner-city neighbourhoods have access to LRT. The suburbs are the priority for this dysfunctional municipal government and have been for quite some time.
Reply With Quote
     
     
  #474  
Old Posted Apr 18, 2023, 12:41 AM
originalmuffins originalmuffins is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 877
Quote:
Originally Posted by GeoNerd View Post
How is LRT primarily in the core? It skims the edge of the inner city on it's way from the downtown business district out to the suburbs (evenutally). Almost no dense inner-city neighbourhoods have access to LRT. The suburbs are the priority for this dysfunctional municipal government and have been for quite some time.
Stage 1 is located within the core only. Stage 2 creates access to more areas, and then Stage 3 provides more access than that, which means if someone needs to get anywhere from the core to another area (east, west, or south), they can utilize the LRT fairly well.
Reply With Quote
     
     
  #475  
Old Posted Apr 18, 2023, 12:46 AM
orleans_man orleans_man is offline
Registered User
 
Join Date: Dec 2009
Posts: 65
Quote:
Originally Posted by originalmuffins View Post
That's laughable, considering LRT is primarily only in the core at the moment. These further stages expand it so that people wherever they are in the city can access wherever they want to go within Ottawa without relying on a car.
Although, I agree it would be awesome to see Phase 3 built out as LRT. I think the numbers are becoming really hard to justify. 6.5 Billion is a lot of money, costs have also risen since the pandemic, so those numbers are probably low.

Also, the commuting patterns since the pandemic have changed and may not return. I don't know if the operational savings that were projected for Phase 1 - LRT will ever come to pass? This was one of the key rationales used to justify the cost -> here supposed to be $100 Million a year in Operational Savings (Buses and Drivers). So even with Phase 1 we are facing a major revenue miscalculation right now.

Prior to the pandemic there would be 100's of buses hourly during rush hour coming into Ottawa from the suburbs. Those numbers have been drastically reduced. I know my own express route in Orleans went from 10 AM runs to 3 and anecdotally from 500-600 daily users to maybe 50-75 users at most.

So back to the numbers, the idea of spending 6500 Millions - so basically 6500 per resident (or in my case, for my family of 4). $26,000 is tax dollars to extend Phase 3 as LRT, I think real hard questions and analysis need to be done.

What made sense before the pandemic from a transit planning perspective may need to be re-examined.

BTW - I am just ignoring the fact the Phase 1 has any problems. Let's just pretend they are able to address the operational challenges and Phase 2 is seamlessly executed and all that - I still think some people smarter than me should re-examine the options
Reply With Quote
     
     
  #476  
Old Posted Apr 18, 2023, 12:58 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Maybe the phase 3 of the LRT is making it reliable so that it can run year round regardless of weather. Doing that will show the citizens that they can rely on it. Doing that will mean that they will return to using it.
Reply With Quote
     
     
  #477  
Old Posted Apr 18, 2023, 1:53 AM
DirectionNorth's Avatar
DirectionNorth DirectionNorth is offline
Registered User
 
Join Date: Oct 2020
Posts: 236
Quote:
Originally Posted by originalmuffins View Post
Stage 1 is located within the core only. Stage 2 creates access to more areas, and then Stage 3 provides more access than that, which means if someone needs to get anywhere from the core to another area (east, west, or south), they can utilize the LRT fairly well.
Stage 1 is physically located in the urban core. It doesn't serve urban travel patterns, but rather is designed to get people from their suburban transfer station to their office job in downtown.
__________________
My YouTube Channel
Reply With Quote
     
     
  #478  
Old Posted Apr 18, 2023, 2:44 AM
originalmuffins originalmuffins is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 877
Quote:
Originally Posted by swimmer_spe View Post
Maybe the phase 3 of the LRT is making it reliable so that it can run year round regardless of weather. Doing that will show the citizens that they can rely on it. Doing that will mean that they will return to using it.
This.
Reply With Quote
     
     
  #479  
Old Posted Apr 18, 2023, 1:19 PM
OTSkyline OTSkyline is offline
Registered User
 
Join Date: Jun 2012
Posts: 2,825
Also, our city council has repeatedly shown that they are not interested in limiting sprawl and focusing on densification. Look at the extension of the urban boundary again lately. If we spend over $6B to bring LRT to Kanata, the sea of SFH with continue to be built at the edge of town and next thing you know, we will be studying the feasibility of spending another $2B to bring it to Stittsville, etc...
Reply With Quote
     
     
  #480  
Old Posted Apr 18, 2023, 1:21 PM
YOWetal YOWetal is online now
Registered User
 
Join Date: Oct 2006
Posts: 7,724
Quote:
Originally Posted by orleans_man View Post
Although, I agree it would be awesome to see Phase 3 built out as LRT. I think the numbers are becoming really hard to justify. 6.5 Billion is a lot of money, costs have also risen since the pandemic, so those numbers are probably low.

Also, the commuting patterns since the pandemic have changed and may not return. I don't know if the operational savings that were projected for Phase 1 - LRT will ever come to pass? This was one of the key rationales used to justify the cost -> here supposed to be $100 Million a year in Operational Savings (Buses and Drivers). So even with Phase 1 we are facing a major revenue miscalculation right now.

Prior to the pandemic there would be 100's of buses hourly during rush hour coming into Ottawa from the suburbs. Those numbers have been drastically reduced. I know my own express route in Orleans went from 10 AM runs to 3 and anecdotally from 500-600 daily users to maybe 50-75 users at most.

So back to the numbers, the idea of spending 6500 Millions - so basically 6500 per resident (or in my case, for my family of 4). $26,000 is tax dollars to extend Phase 3 as LRT, I think real hard questions and analysis need to be done.

What made sense before the pandemic from a transit planning perspective may need to be re-examined.

BTW - I am just ignoring the fact the Phase 1 has any problems. Let's just pretend they are able to address the operational challenges and Phase 2 is seamlessly executed and all that - I still think some people smarter than me should re-examine the options
I think this is all good analysis. The Phase 2 numbers already look very shaky and we will be in real trouble without some kind of new revenue sharing arrangement on Transit that doesn't seem likely with post 2025 possible two hostile governments to deal with.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:04 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.