Originally Posted by originalmuffins
That's laughable, considering LRT is primarily only in the core at the moment. These further stages expand it so that people wherever they are in the city can access wherever they want to go within Ottawa without relying on a car.
|
Although, I agree it would be awesome to see Phase 3 built out as LRT. I think the numbers are becoming really hard to justify. 6.5 Billion is a lot of money, costs have also risen since the pandemic, so those numbers are probably low.
Also, the commuting patterns since the pandemic have changed and may not return. I don't know if the operational savings that were projected for Phase 1 - LRT will ever come to pass? This was one of the key rationales used to justify the cost -> here supposed to be $100 Million a year in Operational Savings (Buses and Drivers). So even with Phase 1 we are facing a major revenue miscalculation right now.
Prior to the pandemic there would be 100's of buses hourly during rush hour coming into Ottawa from the suburbs. Those numbers have been drastically reduced. I know my own express route in Orleans went from 10 AM runs to 3 and anecdotally from 500-600 daily users to maybe 50-75 users at most.
So back to the numbers, the idea of spending 6500 Millions - so basically 6500 per resident (or in my case, for my family of 4). $26,000 is tax dollars to extend Phase 3 as LRT, I think real hard questions and analysis need to be done.
What made sense before the pandemic from a transit planning perspective may need to be re-examined.
BTW - I am just ignoring the fact the Phase 1 has any problems. Let's just pretend they are able to address the operational challenges and Phase 2 is seamlessly executed and all that - I still think some people smarter than me should re-examine the options