  #3001  
Old Posted Mar 30, 2023, 4:47 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,813
Quote:
Originally Posted by Multi-modal View Post
But the northbound track is between the bus platform and the train platform. NO cross-platform transfers to/from the southbound bus platform are possible, even if they "opened up" between the bus and train areas.
Why not? You could have a platform on both sides of the tracks, and the trains could open doors on both sides. The biggest problem is the confusion that two platforms with different destinations would create. Mind you, this could be solved by signage 'To Bayview/Downtown' on one side, To buses/shopping centre' on the other side. It is just weird how the bus platform is adjacent to the tracks but you can only get to the train by going down stairs and then back up again.
Reply With Quote
     
     
  #3002  
Old Posted Mar 30, 2023, 5:28 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by lrt's friend View Post
Why not? You could have a platform on both sides of the tracks, and the trains could open doors on both sides. The biggest problem is the confusion that two platforms with different destinations would create. Mind you, this could be solved by signage 'To Bayview/Downtown' on one side, To buses/shopping centre' on the other side. It is just weird how the bus platform is adjacent to the tracks but you can only get to the train by going down stairs and then back up again.
For shopping and northbound busses you would still need to go down (and up back up for the buses). It would only be useful when transferring between northbound trains and southbound buses. Building a whole other platform just to serve a small minority of transfers seems a bit over the top.
Reply With Quote
     
     
  #3003  
Old Posted Mar 30, 2023, 7:34 PM
Multi-modal Multi-modal is offline
Registered User
 
Join Date: Jul 2014
Posts: 1,154
Quote:
Originally Posted by lrt's friend View Post
Why not? You could have a platform on both sides of the tracks, and the trains could open doors on both sides. The biggest problem is the confusion that two platforms with different destinations would create. Mind you, this could be solved by signage 'To Bayview/Downtown' on one side, To buses/shopping centre' on the other side. It is just weird how the bus platform is adjacent to the tracks but you can only get to the train by going down stairs and then back up again.
Ahh, I understand now. Thanks for the explanation.
Reply With Quote
     
     
  #3004  
Old Posted Apr 4, 2023, 3:06 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
Quote:
Originally Posted by J.OT13 View Post
Why do the entrances to underground stations have to be fully enclosed while the above ground are nearly fully open? Is there some sort of a law?

Not complaining. Just curious.

Though I feel like we missed an opportunity here for skylights (station box was designed for it) and more impressive stations entrances.
Also, why do Algonquin College/Centrepointe get a proper sized station while Carleton University gets a line of bus shelters and the new Mega Hospital/Thousands of new living units at Dow's Lake get a couple of bus shelters in a narrow trench.
Reply With Quote
     
     
  #3005  
Old Posted Apr 4, 2023, 3:26 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by Harley613 View Post
Also, why do Algonquin College/Centrepointe get a proper sized station while Carleton University gets a line of bus shelters and the new Mega Hospital/Thousands of new living units at Dow's Lake get a couple of bus shelters in a narrow trench.
For sure. I have no issue with Algonquin getting a big underground station. Terminus, major educational institution, City services, but Dow's and Carleton should have received major upgrades. We should have doubled tracked to double the frequency instead of buying longer trains. That would have saved money by allowing us to build smaller new station (like massive Limebank). We could have saved money by eliminating Bowesville and reinvesting in Dow's and Carleton.
Reply With Quote
     
     
  #3006  
Old Posted Apr 4, 2023, 3:28 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,683
I’ve always felt that Line 2 with the single track is but a money burner…
Reply With Quote
     
     
  #3007  
Old Posted Apr 4, 2023, 4:15 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by J.OT13 View Post
For sure. I have no issue with Algonquin getting a big underground station. Terminus, major educational institution, City services, but Dow's and Carleton should have received major upgrades. We should have doubled tracked to double the frequency instead of buying longer trains. That would have saved money by allowing us to build smaller new station (like massive Limebank). We could have saved money by eliminating Bowesville and reinvesting in Dow's and Carleton.
While I agree that double tracking would have been the better option, it would have been more expensive than building the larger stations.
Reply With Quote
     
     
  #3008  
Old Posted Apr 4, 2023, 6:03 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by roger1818 View Post
While I agree that double tracking would have been the better option, it would have been more expensive than building the larger stations.
It would have been marginally more expensive, but cheaper in the long run.
Reply With Quote
     
     
  #3009  
Old Posted Apr 4, 2023, 6:55 PM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,610
Quote:
Originally Posted by J.OT13 View Post
It would have been marginally more expensive, but cheaper in the long run.
How would it be cheaper in the long run? I agree it would provide better service, but it costs more to run more shorter trains than fewer longer trains.

Personally, I don't think the original Trillium line will ever be double tracked (at least not in our lifetime), as once they need that capacity, they will need a direct route downtown. Don't forget that the riders bound for downtown can be divided between the Trillium Line and the South-East Transitway.
Reply With Quote
     
     
  #3010  
Old Posted Apr 4, 2023, 8:14 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,813
What we don't consider are the lost opportunities because the fewer trains don't offer reliable bus transfers which will negatively impact ridership for everything connected to Line 2
Reply With Quote
     
     
  #3011  
Old Posted Apr 4, 2023, 8:20 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,813
While many line 1 stations have very expensive overhead walkways, Dow's Lake has only a signalled intersection to cross a wide boulevard
Reply With Quote
     
     
  #3012  
Old Posted Apr 4, 2023, 11:06 PM
zzptichka zzptichka is offline
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,399
Quote:
Originally Posted by lrt's friend View Post
While many line 1 stations have very expensive overhead walkways, Dow's Lake has only a signalled intersection to cross a wide boulevard
The National Capital Commission gave its blessing to the new Ottawa Hospital Civic Campus site plan Tuesday, but is insisting the hospital include a “seamless, intuitive and weather-protected” link to the nearby Trillium LRT line.
Oct 5, 2021
https://ottawacitizen.com/news/local-new...ivic-site-plan-demands-connection-to-lrt

Wonder where it went from there.
Reply With Quote
     
     
  #3013  
Old Posted Apr 4, 2023, 11:21 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
I guess they decided that getting off a train onto a crowded 8 foot wide platform in a trench and walking up snowy stairs in a blizzard then waiting at a crosswalk with gusting cold wind to cross a stroad before cutting through a massive parking garage to get to the hospital was acceptable?
Reply With Quote
     
     
  #3014  
Old Posted Apr 4, 2023, 11:34 PM
Kelnoz Kelnoz is offline
Registered User
 
Join Date: Dec 2020
Posts: 176
Quote:
Originally Posted by zzptichka View Post
Wonder where it went from there.
The parking garage has a nice enclosed walkway on top of it with plans to connect onto a pedestrian bridge across Carling, but it seems like the city is putting off actually thinking of solutions for Dow's Lake station.
Reply With Quote
     
     
  #3015  
Old Posted Apr 4, 2023, 11:38 PM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
Quote:
Originally Posted by Kelnoz View Post
The parking garage has a nice enclosed walkway on top of it with plans to connect onto a pedestrian bridge across Carling, but it seems like the city is putting off actually thinking of solutions for Dow's Lake station.
Better than what I imagined, but how many flights of stairs will people have to climb to get to that walkway from the trench?
Reply With Quote
     
     
  #3016  
Old Posted Apr 4, 2023, 11:55 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,813
Quote:
Originally Posted by Harley613 View Post
Better than what I imagined, but how many flights of stairs will people have to climb to get to that walkway from the trench?
3 to 4 flights I would guess from the bottom of the trench to the top of an over the street walkway. A more elegant under street walkway will be another significant shutdown of the Trillium line. Why not? It has become a tradition.
Reply With Quote
     
     
  #3017  
Old Posted Apr 5, 2023, 12:06 AM
Harley613's Avatar
Harley613 Harley613 is offline
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,896
Quote:
Originally Posted by lrt's friend View Post
3 to 4 flights I would guess from the bottom of the trench to the top of an over the street walkway. A more elegant under street walkway will be another significant shutdown of the Trillium line. Why not? It has become a tradition.
There is nothing I love more than a pre-emergency room workout when it's not bad enough to pay $150 for an ambulance.
Reply With Quote
     
     
  #3018  
Old Posted Apr 5, 2023, 12:20 AM
Kelnoz Kelnoz is offline
Registered User
 
Join Date: Dec 2020
Posts: 176
Quote:
Originally Posted by Harley613 View Post
Better than what I imagined, but how many flights of stairs will people have to climb to get to that walkway from the trench?
The best case scenario would be to have a tower over the station à la Queensview with elevators going all the way to the top.

Of course that would be expensive... ugh
Reply With Quote
     
     
  #3019  
Old Posted Apr 5, 2023, 12:24 AM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,813
Quote:
Originally Posted by Kelnoz View Post
The best case scenario would be to have a tower over the station à la Queensview with elevators going all the way to the top.

Of course that would be expensive... ugh
The current elevator shaft is a distance from Carling
Reply With Quote
     
     
  #3020  
Old Posted Apr 5, 2023, 1:08 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by roger1818 View Post
How would it be cheaper in the long run? I agree it would provide better service, but it costs more to run more shorter trains than fewer longer trains.

Personally, I don't think the original Trillium line will ever be double tracked (at least not in our lifetime), as once they need that capacity, they will need a direct route downtown. Don't forget that the riders bound for downtown can be divided between the Trillium Line and the South-East Transitway.
There's station maintenance for one. Also, as LRT's Friend alluded to, higher frequency would attract more ridership, increasing revenues for OC Transpo.

Quote:
Originally Posted by Harley613 View Post
Better than what I imagined, but how many flights of stairs will people have to climb to get to that walkway from the trench?
That's Blair for someone coming from the Gloucester Centre and areas to the North. Got to go up two flights of stairs (three for anyone transferring from a local bus), walk to the fare gates and go down another two flights of stairs.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 8:17 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.