Quote:
Originally Posted by Catenary
Greenboro is limited to the north by the location of the switch to the south connecting track, which is why the platform extension goes so far south. The existing platform is basically as far north as it could be.
|
Ok that's a fair point. Now that you mention it, I now realize how close the north end of the station is to the switch. It's been so long since I've been on the train
I'm both glad and appalled my comment about the SE transitway garnered so much discussion. As you can imagine I am a big fan for what it is. Billings Bridge station is built to last. Many bus bays, full coverage walkways, 2 levels, heated shelters etc. It's pretty baller IMO.
I've wanted to ask(oh boy)... in theory... What would you all have said if for Phase 1/2 of Confederation Line.. they mostly kept the existing stations as is aside from tunneling downtown.
For example, Westboro and Lincoln Fields stations remained largely the same but they dug the asphalt down to install track? Refurbish the concrete/metal/glass where needed and perhaps twin the elevators etc.
It's a crazy idea but I wonder how practical it would have been cost wise and how much more the system could have been spread out. After all... if we have 5 minute or less service.. who gives a shit what the station looks like right? We don't even have bathrooms or working escalators half the time(which is another major beef I have).
We blew our load on a fancy jacket but never bought a pair of underwear or pants.
Personally I would take a system that is a fully fleshed out phase 3 with a Gatineau tram and or loop with red steel and milky aging glass panels over what we have now as far as the stations go. The platform widths could have been extended into the center as you don't need a bypass lane. The existing shelter would probably been enough in many cases of inclement weather or at least equivalent.
Food for thought.