Quote:
Originally Posted by josh_cat_eyes
I noticed on the Moncton future roads map that they have a connection to the new downtown east-west street to Canada Street behind the Hyatt Place hotel. This in turn connection to Ivan Rand as shown on the map too. This Street connection is interesting as it would be another at grade crossing of the rail tracks, and make some of the parking south of the tracks, that much closer to Avenir Centre.
They also have Assumption connecting to the traffic circle at the end of Wheeler/Main Street.

|
Interesting. I mapped these out (light colours for built, dark for proposed) over satellite imagery (
https://imgur.com/a/SDWg6Y6) and hadn't realized how much of Ivan Rand/Canada has already been built. The 'missing' pieces range from street upgrades (train station to SW of Avenir Centre) to extensive projects that won't happen without serious development (Tannery Place to behind the car lot) to downright questionable (at-grade crossing SE of Avenir).
The yet-unnamed new street that was supposed to run from Downing to Foundry is pictured, but instead of stopping at Foundry, it crosses the tracks to Canada. There's also ANOTHER new street in the area: an extension of Record from Lutz to Westmorland, just west of the courthouse.
Is the Assomption extension even necessary at this time? Or, is this just an ambitious end-goal of connecting southwest and central Moncton while avoiding another at-grade interchange?