Quote:
Originally Posted by craner
Well that’s depressing & frustrating. 
|
In regards to that I posted this in the Kelowna thread:
How can they “not even be close to construction even if given the money today” for the interchanges at Boucherie and Westlake roads? Have these not been in the design phase for nearly a decade now? I think that’s enough time to plan two interchanges.
Also curious to how they will approach the elimination of the couplet through downtown Westbank…
The sensible approaches would be to tunnel the highway under downtown Westbank followed by the less favorable option of a new free flow bypass around the core.
But those are the more big thinking long term solutions that would be done in all other developed countries.
I bet what we get is converting either Dobbin Rd. or Main St. into an even busier at grade stroad.
At bare minimum the 20 year plan should be upgrading the 97 between the Connector interchange and the bridge into a free flow artery and upgrading the 97 between UBC and the south end of Vernon into a free flowing artery, especially since the far superior second crossing and free flowing relocated 97 via Clement is dead.
Sure bookending Kelowna with two free flowing sections of the 97 will cause huge issues for Harvey, but this is the path the province (and city now) have chosen, so may as well demand the best we can get out of that…