Sections of highway are probably a lot quicker to rip up and repave versus doing the same thing with concrete.

An article about the I-5 Revive project:

https://www.seattletimes.com/seattle-new...will-the-freeway-need-another-face-lift/

Video Link


Giant metal "blade" that drops onto the old concrete panels to crack them so they can asphalt over it. The second paragraph talks about how the metal dowels that aberdeen was talking about.

Quote:
Several relatively new techniques make it possible for concrete contractors to rehabilitate and resurface highways efficiently with minimum traffic interruption. Among these is fast-track concrete pavement technology, in which high-early-strength concrete is used to allow reconstructed roads to open more quickly. While conventional concrete mixes might require a curing time from five to 14 days, fast-track concrete can meet roadway opening strengths in 12 hours or less. Although combinations of ingredients vary, high-early-strength concrete commonly includes a higher proportion of the standard Type I cement to water or contains high-early-strength cement, known as Type III cement. Type III cement is virtually identical to Type I, except that Type III cement particles are ground much smaller. The smaller cement particles increase the surface area, allowing more cement contact with the water in the concrete mix, meaning faster hydration is achieved. Generally, fast-track concrete provides good durability because most of these concretes are air entrained and have a relatively low water content—factors that improve strength and decrease the chloride or salt permeability that damages steel reinforcement and contributes to deterioration.

Another relatively new technique that promises to improve highway smoothness and longevity is dowel retrofitting of existing concrete pavement that has undowelled slab joints. Since 1980, the slab joints of most new concrete highway pavements in areas where heavy loading is anticipated have been dowelled with 18-inch long smooth steel bars. The dowels bridge the joint sawed between the pavement slabs and help transfer traffic loads from one concrete slab to the next. The retrofitting technique involves cutting slots across the pavement joints, inserting the bars, patching the slots with fast-track concrete mixes, and then diamond-grinding the road to obtain a smooth surface. Department of Transportation officials in Washington—the first state to undertake dowel retrofitting on a large scale—expect to extend the life of some of the state's 30-year-old concrete highways by 10 to 15 years using the new technique.
https://www.cement.org/cement-concrete/paving/concrete-paving-types/highways

I wonder if asphalt provides better control for preventing water from pooling versus having to grind the concrete down or installing grooves in a concrete road surface.

Last edited by jollyburger; Jan 9, 2023 at 8:36 PM.
Reply With Quote
     
     
  #5662  
Old Posted Jan 9, 2023, 8:27 PM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,310
Quote:
Originally Posted by WarrenC12 View Post
I hate concrete on US Interstate highways. Loud and lumpy. Hard pass.
What are your thoughts on concrete streets though? Especially brand new ones. Seattle new waterfront boulevard is all concrete. It looks and drives fantastic.
Reply With Quote
     
     
  #5663  
Old Posted Jan 9, 2023, 9:17 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,630
Quote:
Originally Posted by libtard View Post
What are your thoughts on concrete streets though? Especially brand new ones. Seattle new waterfront boulevard is all concrete. It looks and drives fantastic.
I haven't been down there. I remember driving up to SFU, they had concrete on the Gaglardi side in the 90s. It was fine but below average.

Nothing beats new asphalt.
Reply With Quote
     
     
  #5664  
Old Posted Jan 11, 2023, 3:52 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,709
BCMoTI twitter today:


Emergency pothole repairs on the #LionsGateBridge
https://twitter.com/TranBC
Reply With Quote
     
     
  #5665  
Old Posted Jan 12, 2023, 5:16 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,705
Sure dream on.

Quote:
Building a new North Shore bridge a 'huge priority' for BC Liberal leader

Issues plaguing North and West Vancouver are caused by an NDP government that’s too slow to act, says B.C.’s leader of the opposition.

Kevin Falcon, Vancouver-Quilchena MLA and head of the BC Liberal Party, took questions from reporters on Wednesday at a roundtable discussion hosted by Kirk LaPointe, columnist and vice-president of editorial at Glacier Media.

Answers provided by Falcon, who lives in North Van and previously worked for developer Anthem Properties, were often characterized by criticism of Premier David Eby and the BC NDP for its inability to push projects ahead, and the need to remove excessive red tape from the private sector.

When asked how to solve congestion related to the Ironworkers Memorial Second Narrows Crossing, Falcon said the issue is going to required a new bridge, “no question about it.”

“That crossing is now over 60 years old – it literally is starting to fall apart,” he said. “I was just going over about a week ago, when a chunk of the bridge literally fell through and created a hole.”

“What the current government is doing is time wasting: They do studies and then they’ll do more studies and study the studies,” Falcon continued.

As minister of transportation from 2004-2009, Falcon said he prioritized urgent issues like the Sea to Sky highway upgrade and the Canada Line.

“We’ve gotten those things done. The Evergreen Line got done, and now they’re starting to do the corridor through Vancouver. That’s great, but we now have to look at the North Shore. It’s a huge priority for me,” he said.
https://www.nsnews.com/local-news/new-no...e-priority-for-bc-liberal-leader-6364565
Reply With Quote
     
     
  #5666  
Old Posted Jan 12, 2023, 5:19 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is online now
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,150
"Spend X billion to replace capacity that's already there" doesn't seem like a very effective way to flip the North Shore blue.
Reply With Quote
     
     
  #5667  
Old Posted Jan 12, 2023, 6:09 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,705
Quote:
Originally Posted by Migrant_Coconut View Post
"Spend X billion to replace capacity that's already there" doesn't seem like a very effective way to flip the North Shore blue.
I wonder if they plan on a totally new bridge or just a redecking for the Second Narrows when it reaches it's end of life in 35-45 years.
Reply With Quote
     
     
  #5668  
Old Posted Jan 12, 2023, 6:23 AM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,257
Quote:
Originally Posted by jollyburger View Post
I wonder if they plan on a totally new bridge or just a redecking for the Second Narrows when it reaches it's end of life in 35-45 years.
When they announced the current renovation work on the structural elements of the bridge in 2021, the statement was that with proper maintenance the bridge wouldn't need replacing for up to 45 years. So that suggests that when it reaches that point it's a total replacement, not just a new deck.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #5669  
Old Posted Jan 13, 2023, 2:23 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,709
Remember that the City of Vancouver has a policy of no new (additional) lanes into the City.

Last edited by officedweller; Jan 13, 2023 at 5:12 AM.
Reply With Quote
     
     
  #5670  
Old Posted Jan 13, 2023, 4:04 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by officedweller View Post
Remember that the City of Vancouver has a policy of no new (additional) lanes onto the City.
true, though the province can ignore that if they want to.
Reply With Quote
     
     
  #5671  
Old Posted Jan 13, 2023, 4:54 AM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,785
Quote:
Originally Posted by officedweller View Post
Remember that the City of Vancouver has a policy of no new (additional) lanes onto the City.
Delta wants a new bridge out of Delta and New West didn't want a new bridge into New West, but neither is getting what they wanted either. If the province decides that an infrastructure project is going to get done, it's going to get done.
Reply With Quote
     
     
  #5672  
Old Posted Jan 13, 2023, 4:56 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,789
Quote:
Originally Posted by officedweller View Post
Remember that the City of Vancouver has a policy of no new (additional) lanes onto the City.
Traffic lanes out of the city, sure - but absolutely no new lanes INTO the city!
Reply With Quote
     
     
  #5673  
Old Posted Jan 13, 2023, 5:10 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,181
Quote:
Originally Posted by chowhou View Post
New West didn't want a new bridge into New West
That's not true, New West got exactly what they wanted.
Reply With Quote
     
     
  #5674  
Old Posted Jan 13, 2023, 5:13 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,709
I would say Oak St. Bridge should be high priority for 2 more lanes, but even the Liberals did not have it in their Hwy 99 plans.
Reply With Quote
     
     
  #5675  
Old Posted Jan 13, 2023, 5:49 AM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,785
Quote:
Originally Posted by madog222 View Post
That's not true, New West got exactly what they wanted.
Not exactly, New West didn't want 6 lanes but the bridge is designed and built for 6 lanes with only 4 used for vehicles but nothing stopping that changing in the future. Only takes one BC Liberal (BC United...) car enthusiast government to make that happen.
Reply With Quote
     
     
  #5676  
Old Posted Jan 13, 2023, 6:51 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by chowhou View Post
Not exactly, New West didn't want 6 lanes but the bridge is designed and built for 6 lanes with only 4 used for vehicles
i disagree with this statement. you make it sound like its just a matter of repainting lines and moving barriers (what was done with the Alex Fraser Bridge). it was not built for 6 lanes at this time.

but that's misleading, it'll take a fairly major construction project to cantilever the bridge, and this will probably have 9 figures of money attached to it.
Reply With Quote
     
     
  #5677  
Old Posted Jan 13, 2023, 10:04 PM
mcj mcj is offline
Registered User
 
Join Date: Dec 2021
Location: New West
Posts: 1,204
Quote:
Originally Posted by madog222 View Post
That's not true, New West got exactly what they wanted.
New West wanted to remove Royal, East 8th Ave, and portions of East Columbia & Ewen Ave from official truck routes and was denied, the city did not get exactly what we wanted, still have heavy trucks polluting residential streets all day long.

https://www.newwestrecord.ca/local-news/...for-truck-route-changes-rejected-2982657

The bridge is only 4 lanes because the province has never approached the city about a better solution to traffic management with the increased traffic volume, even though it's well within the city's traffic management plan to have a tunnel under 3rd avenue to deal with that, it would just require some funding to the tune of billions from the province (this is also mentioned as one of only two new road links in Translink's Transport 2050 plan, so here's hoping it eventually happens).
Reply With Quote
     
     
  #5678  
Old Posted Jan 14, 2023, 6:53 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,705
Quote:
Originally Posted by chowhou View Post
I've noticed that Google Maps has messed up a lot of factual information that was previously correct for seemingly no good reason.

The borders they have for the Seymour Creek 2 IR for instance are seemingly just completely made up.



The actual surveying can be found on the Government of Canada survey site here.



It makes fantasy transit planning difficult.
Except for maybe the roads intersecting the reserve the Google Maps version seems like it's identical to the survey map you posted.

The borders are a complete mess so I wouldn't blame Google Maps for that.



https://storyoflandclaiminbc.files.wordpress.com/
Reply With Quote
     
     
  #5679  
Old Posted Jan 14, 2023, 11:28 PM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,785
Quote:
Originally Posted by jollyburger View Post
Except for maybe the roads intersecting the reserve the Google Maps version seems like it's identical to the survey map you posted.

The borders are a complete mess so I wouldn't blame Google Maps for that.
I would encourage you to look closer. It's pretty evident that the borders are completely off pretty much everywhere.

I'll reiterate, this used to be correct on Google Maps but at some point they updated and messed up their information, so I think it's completely fair to blame Google Maps for that.
Reply With Quote
     
     
  #5680  
Old Posted Jan 23, 2023, 3:11 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,705
I assume there's some problems with potholes or something?

Quote:
TRAFFIC ALERT: Homer Street Upgrades - Removal of historical heritage pavers

������Full road closure on Homer Street, from Pender - Cordova. Bus lane will be retained.

������ Monday, January 23 - Until further notice
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:09 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.