the National street shift I predicted happened the other day/much smoother through there now. (removal of the stop sign on Station)
Reply With Quote
     
     
  #822  
Old Posted Oct 17, 2022, 12:01 AM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,833
From SRC.

Photo says taken Oct 15th.

Quote:
Originally Posted by City Of Rain, post: 1871551, member: 70034
Reply With Quote
     
     
  #823  
Old Posted Oct 31, 2022, 11:45 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
From a few weeks ago

Quote:
Construction is humming along at the site of the new St. Paul’s Hospital. The project officially broke ground last year, and since then, construction has been moving right on schedule. Concrete has been poured for parking levels P3 and P4, and work is now underway on Level P2.

Get an on-the-ground look at the hospital’s construction progress with Kevin Little, senior manager of design and project delivery:


By the end of December, we should have a large area of concrete poured for the hospital’s main floor (Level 1). And in 2023, you’ll really start to see the hospital take shape above ground! It’ll be a few more years of construction before the new hospital is expected to complete in 2026 and open to patients in 2027.
• Video Link


https://thenewstpauls.ca/on-the-ground-at-new-st-pauls-hospital/
Reply With Quote
     
     
  #824  
Old Posted Nov 1, 2022, 2:13 AM
Tvisforme's Avatar
Tvisforme Tvisforme is offline
 
Join Date: Sep 2014
Posts: 2,185
Quote:
Originally Posted by jollyburger View Post
Thanks!
Reply With Quote
     
     
  #825  
Old Posted Nov 22, 2022, 6:30 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
Looks like they removed that temporary/future shift for National a day or two ago.

Might be up at ground level in 2 months?
Reply With Quote
     
     
  #826  
Old Posted Nov 22, 2022, 10:06 PM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is online now
 
Join Date: Oct 2001
Posts: 6,395
rebar is now above grade.
Reply With Quote
     
     
  #827  
Old Posted Nov 23, 2022, 9:05 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
Quote:
Originally Posted by hollywoodnorth View Post
rebar is now above grade.
Yeah they just are prepping the formwork for the ground level floor now?

Reply With Quote
     
     
  #828  
Old Posted Dec 5, 2022, 4:19 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
Ground level slab is being poured on the west side of the site


Last edited by jollyburger; Dec 5, 2022 at 7:23 PM.
Reply With Quote
     
     
  #829  
Old Posted Dec 10, 2022, 1:25 AM
madog222 madog222 is offline
 
Join Date: Jan 2014
Posts: 4,235
I think these table forms at the SW corner will be ground level.
Reply With Quote
     
     
  #830  
Old Posted Dec 10, 2022, 3:01 AM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
Quote:
Originally Posted by madog222 View Post
I think these table forms at the SW corner will be ground level.
Yeah the cameras are so far away it seemed like it was at ground level.

• Video Link
Reply With Quote
     
     
  #831  
Old Posted Dec 16, 2022, 9:58 AM
madog222 madog222 is offline
 
Join Date: Jan 2014
Posts: 4,235
Drone view from CTV that looks recent, probably from within the past week.


Image from CTV https://bc.ctvnews.ca/staff-provides-sneak-peek-at-vancouver-s-new-st-paul-s-hospital-1.6197193
Reply With Quote
     
     
  #832  
Old Posted Dec 20, 2022, 2:48 AM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,833
Pic by me yesterday:

Reply With Quote
     
     
  #833  
Old Posted Dec 20, 2022, 5:46 AM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
I'm still waiting to see if they install a 5th crane or not.
Reply With Quote
     
     
  #834  
Old Posted Dec 20, 2022, 7:26 AM
Changing City's Avatar
Changing City Changing City is online now
 
Join Date: Nov 2016
Posts: 8,364
Quote:
Originally Posted by jollyburger View Post
I'm still waiting to see if they install a 5th crane or not.
Although they indicated five last spring, I think they've said they now only need four for the hospital. However, if you look on the extreme left hand edge, you can see the piling rig that has already sunk secant piles round 50% of the Keltic office building that they're developing for Masimo. My guess is they should be digging not too far into the new year, and have a crane up some time around the middle of next year?
Reply With Quote
     
     
  #835  
Old Posted Dec 20, 2022, 7:58 PM
madog222 madog222 is offline
 
Join Date: Jan 2014
Posts: 4,235
Plus we should see the research centre starting soon.
Reply With Quote
     
     
  #836  
Old Posted Dec 20, 2022, 8:09 PM
Changing City's Avatar
Changing City Changing City is online now
 
Join Date: Nov 2016
Posts: 8,364
Quote:
Originally Posted by madog222 View Post
Plus we should see the research centre starting soon.
That seems unlikely in the next year. They haven't submitted a development application yet.

They were supposed to announce in mid 2022 which of the three teams that were selected would be building it. As far as I know that hasn't happened.
Reply With Quote
     
     
  #837  
Old Posted Dec 27, 2022, 11:21 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
Quote:
Concrete continues to be poured every day at the new St. Paul’s Hospital near Station Street. The concrete floors on levels P4, P3, and P2 of the underground parkade have now been poured, and we’re 30% through pouring floors for P1.
From Dec 21. Still on P1.

https://thenewstpauls.ca/reflecting-back-on-2022/
Reply With Quote
     
     
  #838  
Old Posted Jan 18, 2023, 10:00 PM
officedweller officedweller is offline
 
Join Date: Jul 2001
Posts: 41,833
Pic by a friend yesterday:

Reply With Quote
     
     
  #839  
Old Posted Jan 19, 2023, 10:37 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
 
Join Date: Nov 2005
Posts: 13,169
Nice to see the rigs on the Keltic site in action too, lots going on here, hopefully Strand can get going on their site soon too.
Reply With Quote
     
     
  #840  
Old Posted Jan 20, 2023, 11:43 PM
jollyburger jollyburger is online now
 
Join Date: Dec 2015
Posts: 15,840
Quote:
​​In 2023, the new hospital will start to appear above ground​
In January, PCL will start pouring the concrete floor (or ‘slab’) for the main floor. And from there, the building will start to take shape…with rebar and concrete walls and columns.
By December, floors 2 through 7 will also appear. We’ll have to wait until 2024 before the hospital reaches its full 11-storey height — equivalent to a 21-storey high-rise condo — ​but even with 7 storeys, it’s going to be an impressive sight.
We’ll continue building new roads and installing underground utilities around the site too.


https://thenewstpauls.ca/lookahead-2023-construction-of-the-new-hospital/
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 6:02 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.