HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


Reply

 
Thread Tools Display Modes
     
     
  #3901  
Old Posted Nov 15, 2022, 7:52 PM
Tvisforme's Avatar
Tvisforme Tvisforme is offline
Registered User
 
Join Date: Sep 2014
Location: Metro Vancouver
Posts: 2,176
Quote:
Originally Posted by chowhou View Post
...The KVR switchbacks coming up out of Penticton are dozens of kilometres long for a 2km climb. Honestly, that's probably not even enough for the 10k feet trains they're running nowadays.
Looking at the first link, it mentions "distributed power" for the longer trains. Does having locomotives positioned in the middle of long trains help with overall stability when cornering? I'm not especially familiar with the physics involved in rail travel, but it does seem that (for example) a three kilometre long train would have issues on sharper corners. How do they keep these trains from pulling themselves off of the tracks?
Reply With Quote
     
     
  #3902  
Old Posted Nov 15, 2022, 8:53 PM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,861
Quote:
Originally Posted by Tvisforme View Post
Looking at the first link, it mentions "distributed power" for the longer trains. Does having locomotives positioned in the middle of long trains help with overall stability when cornering? I'm not especially familiar with the physics involved in rail travel, but it does seem that (for example) a three kilometre long train would have issues on sharper corners. How do they keep these trains from pulling themselves off of the tracks?
You're exactly right.

For cornering in order to not derail you have keep side loads within a certain tolerance. Distributing power through the train helps because you'll be reducing the potential side load for each segment that has had power taken off of it and applied to another section. You can kind of think of distributed power as multiple smaller trains tailgating each other (power wise).

I don't think they still do it, but I believe they used to have extra engines on call for particularly demanding terrain that they'd stich into trains in order to distribute (and add) more power before removing them and returning them to home base. If the KVR was reactivated by some hairbrained miracle they'd probably need a half dozen engines per train to handle those switchbacks.
Reply With Quote
     
     
  #3903  
Old Posted Nov 15, 2022, 9:53 PM
scottN scottN is offline
Registered User
 
Join Date: Mar 2019
Posts: 286
There are switchbacks on the CP mainline too - the spiral tunnels. However if you look at the physics of a railcar being pulled off the tracks going around a corner, I don't think the length of the curve matters much. It's the radius of the corner, and the tension load pulling through the railcar. Long trains make the tension loads higher, unless there are many engines distributed throughout the trains. Steep grades also make the tension higher.
Reply With Quote
     
     
  #3904  
Old Posted Nov 15, 2022, 9:56 PM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,861
Quote:
Originally Posted by scottN View Post
There are switchbacks on the CP mainline too - the spiral tunnels. However if you look at the physics of a railcar being pulled off the tracks going around a corner, I don't think the length of the curve matters much. It's the radius of the corner, and the tension load pulling through the railcar. Long trains make the tension loads higher, unless there are many engines distributed throughout the trains. Steep grades also make the tension higher.
For a constant speed, variance in car weight as it goes through the curve will create spikes in tension too.

Also right, but if you want a wider turn you're going to need even longer switchbacks.

Last edited by chowhou; Nov 15, 2022 at 10:19 PM.
Reply With Quote
     
     
  #3905  
Old Posted Nov 15, 2022, 11:01 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Changing City View Post
You're bored again? Maybe you need to find another hobby besides trolling up dumb ideas on the other side of the country. There's a reason the Kettle Valley route was closed over 60 years ago. Since then sections have had the tracks removed, some of it has been made into a bike and walking trail (part of the Trans Canada Trail), bridges have burned down and been rebuilt for trail use, some tunnels are now unsafe, (but might be reopened for trail use), and you can ride a steam train on a short section that still has rails. It would cost billions to reinstate it for trains, and would still have all the problems it faced before it was closed, and with more extreme weather events these days it would be a constant repair nightmare.

If the existing rail routes have issues because weather events potentially close them down, then it's worth spending money on making them more resiliant, not on diverting it to a different project that would still be a potential money pit.
I do not do what I do to troll. I do what I do to learn.

It was a CP line, and the fact that many other CP lines were removed, it was most definitely a cost saving/profit raising reason.

If the line was still around they would have been making it more resilient.

Quote:
Originally Posted by chowhou View Post
I'm starting to think you don't understand rail at all. How tight do you think rail switchbacks are?

In 2018 the average CP train length was over 7200 feet which is over 2 kilometres.

CN guidelines allow for trains up to 12000 feet which is over 3 and a half kilometres.

Do you think switchbacks for these behemoths are on the scale of cars and people? The KVR switchbacks coming up out of Penticton are dozens of kilometres long for a 2km climb. Honestly, that's probably not even enough for the 10k feet trains they're running nowadays.
Maybe I am misunderstanding what you mean by a switchback.
https://www.google.ca/search?q=switchbac...EHfkpBJUQ4lYoAHoECAEQJQ&biw=1349&bih=598
That to me is a switchback.

Quote:
Originally Posted by scottN View Post
There are switchbacks on the CP mainline too - the spiral tunnels. However if you look at the physics of a railcar being pulled off the tracks going around a corner, I don't think the length of the curve matters much. It's the radius of the corner, and the tension load pulling through the railcar. Long trains make the tension loads higher, unless there are many engines distributed throughout the trains. Steep grades also make the tension higher.
Speed can exacerbate or mitigate it. That is why trans go slower through the spiral tunnels than elsewhere.
Reply With Quote
     
     
  #3906  
Old Posted Nov 15, 2022, 11:10 PM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,300
Quote:
Originally Posted by swimmer_spe View Post
I do not do what I do to troll. I do what I do to learn.
Your first question was perfectly reasonable. You had several responses that explained why resurrecting a decommissioned railway that had a whole host of issues when it was operating over 60 years ago wasn't a good idea, and is not likely to ever happen, (and there was a third line in BC you'd overlooked). You then started to argue in long posts that ignore the points that were made, where what you write shows you haven't learned anything. You've bumped this thread several times in a similar fashion. You constantly argue with points that are from members who have local knowledge. That's trolling. The appropriate response at some point (quite early in the exchange) is 'Fair enough, I see why that's not a great idea, thinks for the replies'. Then you should stop.

If you're interested in the Kettle Valley Railway's history you should read Barrie Sanford's 'McCulloch's Wonder'. There you could read how CPR took over the railway in 1931, and started closing it down in 1935 around the time the Great Northern abandoned their Crow's Nest Pass line. They also abandoned the GN line west of Keremeos when heavy rains washed out a bridge at Princeton. The weather did so much damage in 1935 that service was severely disrupted. Forest fires in 1938 took out three of the bridges. In 1939 CPR said they would abandon their Coquihalla line, but reopened it because of the war. It was constantly closed for avalanches and rockslides, and then reopened after repairs. But demand fell off (for both freight, and passengers) that the costs of operating any service were greater than the revenue.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/

Last edited by Changing City; Nov 15, 2022 at 11:30 PM.
Reply With Quote
     
     
  #3907  
Old Posted Nov 15, 2022, 11:22 PM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,861
Quote:
Originally Posted by swimmer_spe View Post
Maybe I am misunderstanding what you mean by a switchback.
https://www.google.ca/search?q=switchbac...EHfkpBJUQ4lYoAHoECAEQJQ&biw=1349&bih=598
That to me is a switchback.
Those are roads my friend.
Reply With Quote
     
     
  #3908  
Old Posted Nov 15, 2022, 11:31 PM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,174
Quote:
Originally Posted by swimmer_spe View Post
Maybe I am misunderstanding what you mean by a switchback.
https://www.google.ca/search?q=switchbac...EHfkpBJUQ4lYoAHoECAEQJQ&biw=1349&bih=598
That to me is a switchback.
Should be obvious that trains neither climb/descend nor turn as easily as cars do; these are switchbacks for a railway going up the Himalayas.
Reply With Quote
     
     
  #3909  
Old Posted Nov 15, 2022, 11:34 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Changing City View Post
Your first question was perfectly reasonable. You had several responses that explained why resurrecting a decommissioned railway that had a whole host of issues when it was operating over 60 years ago wasn't a good idea, and is not likely to ever happen, (and there was a third line in BC you'd overlooked). You then started to argue in long posts that ignore the points that were made, where what you write shows you haven't learned anything. You've bumped this thread several times in a similar fashion. You constantly argue with points that are from members who have local knowledge. That's trolling. The appropriate response at some point (quite early in the exchange) is 'Fair enough, I see why that's not a great idea, thinks for the replies'. Then you should stop.
Actually, no. I have acknowledged the things I forgot, like the one going north.
The rest is learning about the challenges. For instance, I am trying to learn what is meant by a switchback as, posted below, I did not know anything like that existed in Canada. If they are using the wrong terminology, then I will learn what they mean and then we can move forward on it.

At not time, am I assuming this line will be reactivated. I am trying to understand the challenges it faced and lead to the eventual closure.

That is not trolling.
https://en.wikipedia.org/wiki/Troll_(slang)
In slang, a troll is a person who posts or says inflammatory, insincere, digressive,[1] extraneous, or off-topic messages online (such as in social media, a newsgroup, a forum, a chat room, a online video game), or in real life, with the intent of provoking others into displaying emotional responses,[2] or manipulating others' perception.

inflammatory - who have I done this to?
insincere - I honestly want to understand this.
digressive/off-topic - This is about heavy rail/intercity rail in the Vancouver/BC area, right?
extraneous - I am not interrupting that which was being discussed, right?

I do feel you are being a troll.
Good thing I like to play with trolls.

Quote:
Originally Posted by chowhou View Post
Those are roads my friend.
https://www.google.ca/search?q=rail+swit...00Q_AUoAXoECAIQAw&biw=1366&bih=615&dpr=1

That is rail.
Did any part of the KVR have anything like that?
If that is not what you mean, please post a picture to show what you mean.
Reply With Quote
     
     
  #3910  
Old Posted Nov 15, 2022, 11:44 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Migrant_Coconut View Post
Should be obvious that trains neither climb/descend nor turn as easily as cars do; these are switchbacks for a railway going up the Himalayas.
That is over several km. The map for the KVR was over 700km long and look nothing like that.

Can you show a section on the KVR that is that tight?
Reply With Quote
     
     
  #3911  
Old Posted Nov 16, 2022, 12:15 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,174
Correction: over 79.27 kilometres; scale the DHR map down and that's exactly what you have on the KVR. No way in hell CP/CN would ever be interested in buying and maintaining a mountain railway with trestle bridges and hairpin turns.
Reply With Quote
     
     
  #3912  
Old Posted Nov 16, 2022, 12:21 AM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,300
Quote:
Originally Posted by swimmer_spe View Post
At not time, am I assuming this line will be reactivated. I am trying to understand the challenges it faced and lead to the eventual closure.

That is not trolling.
Then you shouldn't ask "would this line help alleviate traffic from the ports to the rest of Canada?" because it would have to be reactivated to do that.

It eventually closed in 1959 because a section near Lear (all the sections were named after Shakespeare characters) washed out. The next day they discovered four sections had washed out, and one had disappeared completely. Repairs were started, but the damage was so severe that CPR decided to close the line. It had only operated for 45 years, and dozens of railway workers had lost their lives building it, and trying to keep it open. It was cheaper and more reliable for CPR to haul freight to Golden, then on the CPR mainline.

The rails were pulled up from Hope to Boston Bar in 1961, and the rest of the tracks on that section a year later. Passenger trains on the remaining part of the KVR stopped operating in 1964, closing down rail service between the coast, and the Kootenays. Apart from a few minor sections, the final tracks were removed in 1979.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #3913  
Old Posted Nov 16, 2022, 12:28 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,174
In other words, CP wanted to get rid of it because it was a money pit. So there's no way they would've kept it, and even less way it would be a relief line for the regular Golden route.
Reply With Quote
     
     
  #3914  
Old Posted Nov 16, 2022, 12:49 AM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,861
Quote:
Originally Posted by swimmer_spe View Post
That is rail.
Did any part of the KVR have anything like that?
If that is not what you mean, please post a picture to show what you mean.
I previously mentioned the switchbacks rising out of Penticton to the East. You can see them on the map posted earlier. There were also some wicked switchbacks rising out of Princeton too. There's no way modern trains would handle those.
Reply With Quote
     
     
  #3915  
Old Posted Nov 16, 2022, 12:51 AM
Changing City's Avatar
Changing City Changing City is offline
Registered User
 
Join Date: Nov 2016
Posts: 8,300
Quote:
Originally Posted by Migrant_Coconut View Post
In other words, CP wanted to get rid of it because it was a money pit. So there's no way they would've kept it, and even less way it would be a relief line for the regular Golden route.
And the Coquihalla Highway was built in the 1980s, much of following the line of the abandoned Kettle Valley Railway. We know how often that road is closed due to severe weather, avalanches or rockslides. The railway would have faced exactly the same conditions, had it remained operating.
__________________
Contemporary Vancouver development blog, https://changingcitybook.wordpress.com/ Then and now Vancouver blog https://changingvancouver.wordpress.com/
Reply With Quote
     
     
  #3916  
Old Posted Nov 16, 2022, 1:14 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,756
There's the Spiral Tunnels on the CP line through Kicking Horse Pass - and that was built in 1909.
I can't see a major railway using tight switchbacks.
https://www.pc.gc.ca/en/pn-np/bc/yoho/culture/kickinghorse/visit/spirale-spiral


https://www.pc.gc.ca/en/pn-np/bc/yoho/culture/kickinghorse/visit/spirale-spiral
Reply With Quote
     
     
  #3917  
Old Posted Nov 16, 2022, 3:38 AM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,205
I'm not sure I would call those KVR climbing sections switchbacks, despite it's usage on roadworks.

With trains, that would imply that there are switches, and the train would have to reverse.

I think the correct wording is just a hairpin, but then again I'm not specifically a rail design engineer.
__________________
"It's ok, I'm an engineer!" -Famous last words
Reply With Quote
     
     
  #3918  
Old Posted Nov 16, 2022, 3:40 AM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,861
Quote:
Originally Posted by Alex Mackinnon View Post
I'm not sure I would call those KVR climbing sections switchbacks, despite it's usage on roadworks.

With trains, that would imply that there are switches, and the train would have to reverse.

I think the correct wording is just a hairpin, but then again I'm not specifically a rail design engineer.
I think most people are more familiar with switchbacks in a road context and extrapolate that definition to rail, but you're right it's technically wrong in a rail context.
Reply With Quote
     
     
  #3919  
Old Posted Nov 16, 2022, 3:56 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Changing City View Post
Then you shouldn't ask "would this line help alleviate traffic from the ports to the rest of Canada?" because it would have to be reactivated to do that.

It eventually closed in 1959 because a section near Lear (all the sections were named after Shakespeare characters) washed out. The next day they discovered four sections had washed out, and one had disappeared completely. Repairs were started, but the damage was so severe that CPR decided to close the line. It had only operated for 45 years, and dozens of railway workers had lost their lives building it, and trying to keep it open. It was cheaper and more reliable for CPR to haul freight to Golden, then on the CPR mainline.

The rails were pulled up from Hope to Boston Bar in 1961, and the rest of the tracks on that section a year later. Passenger trains on the remaining part of the KVR stopped operating in 1964, closing down rail service between the coast, and the Kootenays. Apart from a few minor sections, the final tracks were removed in 1979.
The rail lines through the Ottawa Valley were removed due to the redundancy of it. There may come a day where they put it back. KVR, not so much, and now I understand why.

Quote:
Originally Posted by chowhou View Post
I previously mentioned the switchbacks rising out of Penticton to the East. You can see them on the map posted earlier. There were also some wicked switchbacks rising out of Princeton too. There's no way modern trains would handle those.
I looked.
I now understand the problem.
Modern trains are not getting through that easily.

Quote:
Originally Posted by officedweller View Post
There's the Spiral Tunnels on the CP line through Kicking Horse Pass - and that was built in 1909.
I can't see a major railway using tight switchbacks.
https://www.pc.gc.ca/en/pn-np/bc/yoho/culture/kickinghorse/visit/spirale-spiral


https://www.pc.gc.ca/en/pn-np/bc/yoho/culture/kickinghorse/visit/spirale-spiral
That was to fix a steep hill, not hard curves. If this line could have been viable, they may have done something about the curves. If money was no issue. I could see a lot of tunneling. However, that is about as likely as HSR across Canada.

Quote:
Originally Posted by Alex Mackinnon View Post
I'm not sure I would call those KVR climbing sections switchbacks, despite it's usage on roadworks.

With trains, that would imply that there are switches, and the train would have to reverse.

I think the correct wording is just a hairpin, but then again I'm not specifically a rail design engineer.
This is why I asked for clarification. Hairpin turns are bad, but switchbacks would be 10 times worse.
Reply With Quote
     
     
  #3920  
Old Posted Nov 16, 2022, 6:13 AM
scottN scottN is offline
Registered User
 
Join Date: Mar 2019
Posts: 286
Quote:
Originally Posted by Alex Mackinnon View Post
I'm not sure I would call those KVR climbing sections switchbacks, despite it's usage on roadworks.

With trains, that would imply that there are switches, and the train would have to reverse.

I think the correct wording is just a hairpin, but then again I'm not specifically a rail design engineer.
Here's the wikipedia article for those who are interested. https://en.wikipedia.org/wiki/Zig_zag_(railway). I believe that this is the origin of the word "switchback" because switches were used. Locally the Stevens pass railway had real switchbacks before the completion of the first cascade tunnel.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:55 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.