Old Posted Oct 26, 2022, 5:41 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by swimmer_spe View Post
For Hamilton, I meant did any mayoral or councilor candidate try to say that Hamilton does not need an LRT?
My bad. Didn't get that.

No idea, but I suspect the whole LRT debate is settled now.
     
     
  #16862  
Old Posted Oct 26, 2022, 6:02 PM
GeneralLea's Avatar
GeneralLea GeneralLea is offline
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,976
Taken today

This is a shot of Mount Pleasant station for the Crosstown LRT project in Toronto.

I think this is the closest station to me...I'll probably take it once Eglinton reopens....which sounds unbelievable to say frankly.

Bias by Draulerin Photographics, on Flickr
__________________
"Living life on the edge"
     
     
  #16863  
Old Posted Nov 4, 2022, 11:46 PM
MisterMillionz MisterMillionz is offline
Registered User
 
Join Date: Dec 2019
Posts: 48
Montreal's new BRT line along Pie-IX boulevard is opening next week! The bus lines using the newly redone corridor will have reserved bus lines, priority at intersections, stations at the center of the street, etc.

Here's an article about it: https://montrealgazette.com/news/local-n...ect-inaugurated-thursday-launches-monday

The STM's official page also goes into detail regarding the long awaited project:
https://www.stm.info/en/about/major_projects/major-bus-projects/pie-ix-brt
     
     
  #16864  
Old Posted Nov 6, 2022, 11:23 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
In the Heavy Rail forum in the Vancouver section, something was brought up

Originally Posted by cganuelas1995 View Post
The thresholds where it becomes cheaper to get monthly passes are:

42 trips per month for one zone
38 trips per month for two zone
40 trips per month for three zone

This is assuming they are travelling the maximum zones covered by their fare pass

---------------------------------------------------------

My thinking was:

Someone doing a round trip 5 days a week should see a savings on the pass. Quick math, if those are one way, then you only break even. Translink should change that. Unless it is artificially high to deter higher ridership.

The TTC in Toronto only has 1 fare zone.
Single fare is $3.25
Monthly pass is $156, or $143 if you sign up for a 12 contract.
It works out to 48 trips or 44.

Locally, my transit equals to 20 trips with the monthly pass.

I wonder if the larger cities are purposely making things more expensive to reduce congestion on their system.

It would be interesting to see what the various transit agencies are doing.
     
     
  #16865  
Old Posted Nov 7, 2022, 6:11 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by MisterMillionz View Post
Montreal's new BRT line along Pie-IX boulevard is opening next week! The bus lines using the newly redone corridor will have reserved bus lines, priority at intersections, stations at the center of the street, etc.

Here's an article about it: https://montrealgazette.com/news/local-n...ect-inaugurated-thursday-launches-monday

The STM's official page also goes into detail regarding the long awaited project:
https://www.stm.info/en/about/major_projects/major-bus-projects/pie-ix-brt
Looks good. Similar to what we're planning along Baseline in Ottawa. It's been shovel ready for years, but the City is hyper focused on rail expansion (or, should I say, conversion).

Quote:
Originally Posted by swimmer_spe View Post
In the Heavy Rail forum in the Vancouver section, something was brought up

Originally Posted by cganuelas1995 View Post
The thresholds where it becomes cheaper to get monthly passes are:

42 trips per month for one zone
38 trips per month for two zone
40 trips per month for three zone

This is assuming they are travelling the maximum zones covered by their fare pass

---------------------------------------------------------

My thinking was:

Someone doing a round trip 5 days a week should see a savings on the pass. Quick math, if those are one way, then you only break even. Translink should change that. Unless it is artificially high to deter higher ridership.

The TTC in Toronto only has 1 fare zone.
Single fare is $3.25
Monthly pass is $156, or $143 if you sign up for a 12 contract.
It works out to 48 trips or 44.

Locally, my transit equals to 20 trips with the monthly pass.

I wonder if the larger cities are purposely making things more expensive to reduce congestion on their system.

It would be interesting to see what the various transit agencies are doing.
36 in Ottawa, which is less than I thought.
     
     
  #16866  
Old Posted Nov 7, 2022, 11:31 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by J.OT13 View Post
36 in Ottawa, which is less than I thought.
That isn't too bad.
     
     
  #16867  
Old Posted Nov 7, 2022, 11:56 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by swimmer_spe View Post
That isn't too bad.
So $3.70 for one ride ($3.75 without Presto), $125.50 for the monthly pass.

OC is (wants to?) explore fare capping.

Transfers are an hour and a half weekdays and two hours weekends.
     
     
  #16868  
Old Posted Nov 7, 2022, 11:58 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by J.OT13 View Post
So $3.70 for one ride ($3.75 without Presto), $125.50 for the monthly pass.

OC is (wants to?) explore fare capping.

Transfers are an hour and a half weekdays and two hours weekends.
Fare capping, as in not paying more than the monthly amount?

That would be a great start.
     
     
  #16869  
Old Posted Nov 8, 2022, 1:03 AM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,865
Meanwhile Toronto’s metro pass becomes cheaper than individual fares at, what, 49 trips is it? It’s always annoyed me how expensive Toronto makes their metro passes.
     
     
  #16870  
Old Posted Nov 8, 2022, 2:13 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Innsertnamehere View Post
Meanwhile Toronto’s metro pass becomes cheaper than individual fares at, what, 49 trips is it? It’s always annoyed me how expensive Toronto makes their metro passes.
It could be because if they lowered it, their system couldn't handle the influx. Even if it were 1%, it would still cause chaos.
     
     
  #16871  
Old Posted Nov 8, 2022, 1:27 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by swimmer_spe View Post
Fare capping, as in not paying more than the monthly amount?

That would be a great start.
Yup. Something OC is interested in implementing. Depends on if the City gives them the funding needed to do this.
     
     
  #16872  
Old Posted Nov 8, 2022, 5:10 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by J.OT13 View Post
Yup. Something OC is interested in implementing. Depends on if the City gives them the funding needed to do this.
We fully fund our roads, but we cannot fully fund transit.

Before anyone says "Road tax" EVs do not pay road tax on their electricity, and as they grow in popularity, road tax will be a thing of the past.
     
     
  #16873  
Old Posted Nov 8, 2022, 6:58 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by swimmer_spe View Post
We fully fund our roads, but we cannot fully fund transit.

Before anyone says "Road tax" EVs do not pay road tax on their electricity, and as they grow in popularity, road tax will be a thing of the past.
System is broken. For those who don't know, we don't even pay for license plates anymore in Ontario. Ford refunded us what we had paid since March 2020 and removed the fees completely (but we still have to renew).
     
     
  #16874  
Old Posted Nov 8, 2022, 7:06 PM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by J.OT13 View Post
System is broken. For those who don't know, we don't even pay for license plates anymore in Ontario. Ford refunded us what we had paid since March 2020 and removed the fees completely (but we still have to renew).
The system has been broken for some time now.
     
     
  #16875  
Old Posted Nov 9, 2022, 3:16 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,865
https://www.infrastructureontario.ca/Contract-Awarded-Ontario-Line-Southern-Civil-Stations-Tunnel/

Quote:
Contract Awarded for Ontario Line South Package

TORONTO – Infrastructure Ontario and Metrolinx have awarded a fixed-price contract to Ontario Transit Group for $6B ($5.5B for capital costs and $0.5B for financing and transaction costs) to design, build and finance the Ontario Line Southern Civil, Stations and Tunnel (South Civil) package.

The Ontario Transit Group team includes:

Applicant Lead: Ferrovial Construction Canada Inc., VINCI Construction Grands Projets
Design Team: AECOM Canada Ltd., COWI North America Ltd., GHD Limited, SENER Group
Construction Team: Ferrovial Construction Canada Inc., Janin Atlas Inc.
Financial Advisor: Agentis Capital
The project underwent an open, fair and competitive procurement process overseen by a third-party fairness monitor. Ontario Transit Group submitted the proposal which delivers the best value for Ontario taxpayers. The project is being delivered through IO’s Public-Private Partnership (P3) model, which transfers appropriate risks associated with design, construction and financing of the project to the private sector.

The team will begin mobilizing its design and construction crews, with major works to commence in early 2023. The South Civil contract is anticipated to be completed in 2030.

OTG anticipates that its section of work for South Civil will strengthen Ontario’s economy by supporting an estimated 1,500 jobs at the peak of construction.

Scope of work for the Ontario Line South Civil design-build-finance package includes:

A six-kilometre tunnel and associated tunnelling works from Exhibition to Don Yard portal (west of the Don River)
Groundworks required to build the tunnels and stations; utility and conduit works to prepare for the RSSOM mechanical and electrical systems; guideway structures and facilities to prepare for the track structure to be installed by the RSSOM contractor
Stations:
One above-ground station to be integrated with the existing GO Transit Exhibition Station
Two underground stations to be integrated with the existing TTC Osgoode and Queen subway stations
Four new underground stations (King/Bathurst, Queen/Spadina, Moss Park, Corktown)
The Ontario Line project is being delivered through various P3, progressive design-build and traditional procurement contracts, which are all being staged accordingly for their successful delivery.

The Ontario Line will be a 15.6-kilometre new rapid transit line running between the Ontario Science Centre and Exhibition/Ontario Place in Toronto, with 15 stations, including six interchange stations. The new line will provide more than 40 connections to other bus, streetcar, light-rail transit and regional rail services.
     
     
  #16876  
Old Posted Nov 9, 2022, 4:24 PM
hipster duck's Avatar
hipster duck hipster duck is online now
Registered User
 
Join Date: Oct 2014
Location: Toronto
Posts: 4,912
^It's good to see European construction companies that have experience with this kind of stuff get more Canadian projects.

Vinci Grand Projets is building things like Grand Paris Express and seem to be on the ball with the Phase 2 Confederation Line extension in Ottawa, so I'm happy they're getting the project. They seem competent.
     
     
  #16877  
Old Posted Nov 9, 2022, 6:46 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by hipster duck View Post
^It's good to see European construction companies that have experience with this kind of stuff get more Canadian projects.

Vinci Grand Projets is building things like Grand Paris Express and seem to be on the ball with the Phase 2 Confederation Line extension in Ottawa, so I'm happy they're getting the project. They seem competent.
For sure, they've done a great job so far in Ottawa. Some delays due to labour and material shortages, but within reason, unlike SNC's Line 2 expansion project.
     
     
  #16878  
Old Posted Nov 13, 2022, 7:47 PM
superelevation superelevation is offline
Registered User
 
Join Date: Oct 2020
Posts: 50
Quote:
Originally Posted by Doady View Post
The worse service across the border is mostly the result of lack of integration. The TTC refuses to provide any cross-boundary service, not even to Westwood Mall in Malton. The City of Toronto also bans incoming Mississauga, Brampton, York and Durham buses from picking up passengers and bans their outgoing buses from dropping off passengers. And of course there is the problem of fares, which especially affects York because of the long boundary they share with City of Toronto along Steeles Ave.

Of course, York could have done a much better job with Steeles Ave. even without Toronto's cooperation. A VIVA route along Steeles probably should have been their #1 priority in 2005. Steeles is a humongous gap in the York Region transit network. Steeles Ave is York's only continuous east-west transit corridor south of Rutherford Road and they have no route for it! It's just crazy.

You can also see similar gaps elsewhere in the 905 due to bad planning, like in Mississauga south of Dundas, where is the only one east-west transit corridor, Lakeshore Road. There was one other potential east-west transit corridor that was instead converted into a freeway, the Queen Elizabeth Way. The QEW is only bridge across the Credit River between Dundas and Lakeshore and it's only for cars and trucks, no local bus riders, cyclists, or pedestrians. That's a 4-5km gap, think about that. Not many north-south corridors in this area either, due to the conversion of the freeway, the route of the river, all the mansions, and again bad planning on top of all that. South Mississauga is a good example of what suburbs were like before TOD became a thing. New suburbs now not only with proper, continuous corridors closer together, but also development emphasizing those corridors, it is a much different time compared to the 50s.

I have to say, the way Derry Road stands out in north part of Mississauga is very strange to me. Unless things have changed due to COVID, Derry should not have more service or ridership than the adjacent Steeles corridor north in Brampton. Before COVID, the top east-west corridors in Mississauga were definitely Dundas, Bloor, Eglinton, and the 403/Transitway. The Queen and Steeles corridors in Brampton were on par with Dundas and Eglinton. I can understand if Derry has overtaken 403/Transitway due to less students and office workers, but all the others? Doesn't make sense, especially Steeles which is another industrial route just Derry. Maybe Steeles was more reliant on university students than I imagined.

Another one that stands out is McLaughlin parallel to Hurontario in Mississauga, but that's probably due to the LRT construction. I think the map still gives a good overall impression of quality of service in the GTA, but maybe can't look at it too closely, maybe no fault of the person who made the map.
Lack of integration is bad but not an excuse for pitiful service
     
     
  #16879  
Old Posted Nov 17, 2022, 9:06 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,865
Ontario Line trains:



[IMG]

     
     
  #16880  
Old Posted Nov 18, 2022, 6:16 PM
GeneralLea's Avatar
GeneralLea GeneralLea is offline
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,976
I wonder if this generation of trains will be used all around the system later on. The Crosstown problems make me wonder what the true timeline of this subway line will really be.
__________________
"Living life on the edge"
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 10:20 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.