Posted Oct 27, 2022, 9:04 PM
|
|
|
|
Join Date: Jan 2008
Posts: 26,252
|
|
Quote:
Originally Posted by J.OT13
City holding provision will be removed once the following is confirmed:
- Relocation strategy for existing artist tenants;
- Secured affordable unit rent for artist tenants;
- $1,000,000 towards Ward 15 affordable housing;
- $1,000,000 towards Laurel Street ped bridge;
- Multi-use pathway along east side of site (second Trillium pathway);
- Public access easement;
- Phasing plan should the project go up in phases;
- Determining any required mitigation for stationary noise.
Maintain the permission for a light industrial use limited to a brewery. Allow outdoor patio.
|
As in noise from the station, or does that mean something else?
|