Quote:
Originally Posted by i-215
5600 West was supposed to get LRT as part of the Mountain View project. But now it's been chopped down below BRT to just an "enhanced bus." MAX strikes again!
I may not live in Utah anymore, but I'm tired as hell of Utah's second-largest city getting third-rate transit. It's so wrong! (But hey, rich people in Draper get LRT they never use --- hooray!)
|
I just wanted to say that this is actually the fault of WVC. The City themselves advised UTA and UDoT that they didn't want to widen the 3500 South 5600 West intersection any more to accommodate either LRT or BRT. This was because the WVC City Manager felt that it was better to keep the current businesses at the intersection than possibly lose them due to a widened intersection.
He also though that due to the location, the chances of any redevelopment are so low that the City would actually lose revenue by having better transit. He also helped to kill better transit along 3500 South west of Bangerter.
From his perspective though, he can be seen as being right. Just look at the lack of developments along the current Green Line. WVC has seen the lowest rate of development along Trax than any other City. WVC has tried to attract development along the Trax line to really no avail.
Now though, if the City Manager would look out more than 5 or 10 years, they would see massive potential at the 3500 S 5600 W intersection. The City could buy up land and properties via their RDA and assist with developments via some minor incentives.
With the U building a medical campus just south of the intersection, the area is primed for redevelopment. It just needs better transit access and a City with vision.
I do think that UDoT and the WFRC will have to step in as the agreement with the Feds requires a separated BRT line in place shortly after MVC meets I-80. It also requires the BRT to be upgraded to LRT by the time MVC is a full freeway from I-80 to approximately 135th South. This agreement takes precedent over what WVC may want or how they feel.
I just think it would be cheaper in the long run to do LRT now than go through the phasing and later costs. It would encourage better developments along the corridor, which would help increase revenue for the various cities along the 5600 west corridor. Besides, $1 Billion today always sounds better than $5-10 Billion later (depending on phasing time frames).