Old Posted Oct 4, 2022, 10:11 PM
StEC's Avatar
StEC StEC is offline
Burger Connoisseur
 
Join Date: Feb 2013
Location: Hamilton
Posts: 580
Quote:
Originally Posted by Innsertnamehere View Post
My understanding is that the tunnel is wide enough to be double tracked, and indeed even was double tracked at one time, but doing so means CP would have to give up double-stacked containers on the corridor due to the arched ceiling shape
It should be much easier to just lower the tracks though no? Go back to double tracks but lower them a foot or two and problem fixed.
Reply With Quote
     
     
  #1342  
Old Posted Oct 4, 2022, 10:24 PM
ScreamingViking's Avatar
ScreamingViking ScreamingViking is offline
Ham-burgher
 
Join Date: Jun 2013
Location: Hamilton
Posts: 7,509
Quote:
Originally Posted by mikevbar1 View Post
I agree, GO Centre is beautiful and is deserving of being a central station. However, CP really bottlenecked its use with their tunnel (perhaps by design?) and there isn't really a clear way to fix it without a full rebuild, which is a lot more than Mx or the city wants to cough up. To gain access to the east side is a non-starter unless we reactivate rail on the beachfront, which while a great idea is also too expensive to consider right now.

GO has been underinvested in now for decades. With DB at the helm, the core GO network will be a true S-Bahn, full stop. It can, and will, easily absorb a significant amount of demand both from new park-n-ride commuters and ideally existing transit users. Much of the GTHA is at a density that high-quality buses feeding into strong rail connections will work pretty well, effectively becoming the TTC on steroids. It is going to be transformational, and I always feel a bit jealous that no one has put up capital to extend electrification just a little bit to West Harbour, but I digress. We are positioned at the axiom of the GO line with the most compelling trips outside of Union, so I think we are going to be OK.

CP was gracious but only to a point.

Freight use is what holds up the idea of electrification around the bay into Hamilton. Metrolinx added that extra track to service West Harbour and beyond, but for diesels. Freight use is also the reason why GO has to contend with low platforms (even on the track it now owns). This country's rail priorities place people below containers and tanker cars, and that's not likely to change any time soon unless the passenger carriers do their own thing.

I seem to recall that CN requires Metrolinx to build its own grade separations for junctions that serve West Harbour and GO Centre, if electrification is to happen. $$$$$$$$
Reply With Quote
     
     
  #1343  
Old Posted Oct 4, 2022, 11:15 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,902
I live close to the corridor further east and there are probably 3-4 trains a day, it’s not super busy.
Reply With Quote
     
     
  #1344  
Old Posted Oct 5, 2022, 8:17 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,902
https://news.ontario.ca/en/advisory/1002368/premier-ford-to-make-announcement

Ford announcing construction start of Confederation GO? Maybe?
Reply With Quote
     
     
  #1345  
Old Posted Oct 6, 2022, 3:14 PM
SteelTown's Avatar
SteelTown SteelTown is offline
It's Hammer Time
 
Join Date: Mar 2004
Location: Hamilton
Posts: 20,401
Reply With Quote
     
     
  #1346  
Old Posted Oct 6, 2022, 3:27 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,902
https://news.ontario.ca/en/release/1002369/ontario-begins-construction-on-confederation-go-station

Confederation GO is indeed starting construction - no word on opening date or cost.
Reply With Quote
     
     
  #1347  
Old Posted Oct 6, 2022, 3:30 PM
SteelTown's Avatar
SteelTown SteelTown is offline
It's Hammer Time
 
Join Date: Mar 2004
Location: Hamilton
Posts: 20,401
$50 million to build, construction starts this fall and will take three years to build.
Reply With Quote
     
     
  #1348  
Old Posted Oct 6, 2022, 3:30 PM
Hawrylyshyn's Avatar
Hawrylyshyn Hawrylyshyn is offline
Registered User
 
Join Date: Mar 2015
Location: Ontario
Posts: 2,278
Construction starts Fall 2022, completed 2025 -- costs ~$50 million
Reply With Quote
     
     
  #1349  
Old Posted Oct 6, 2022, 3:32 PM
TheHonestMaple's Avatar
TheHonestMaple TheHonestMaple is offline
Registered User
 
Join Date: Aug 2016
Posts: 1,833
For all the hate Doug Ford and the conservatives get, they've done more for Hamilton infrastructure than the Liberals ever did. That's for sure.
Reply With Quote
     
     
  #1350  
Old Posted Oct 6, 2022, 3:45 PM
matt602's Avatar
matt602 matt602 is offline
Hammer'd
 
Join Date: Jan 2006
Location: Hamilton, ON
Posts: 4,785
Quote:
Originally Posted by TheHonestMaple View Post
For all the hate Doug Ford and the conservatives get, they've done more for Hamilton infrastructure than the Liberals ever did. That's for sure.
I'll reluctantly admit that they've done a lot more for public transit than I thought they would. Probably about the only thing I'd give them credit for.
Reply With Quote
     
     
  #1351  
Old Posted Oct 6, 2022, 3:55 PM
TheHonestMaple's Avatar
TheHonestMaple TheHonestMaple is offline
Registered User
 
Join Date: Aug 2016
Posts: 1,833
Quote:
Originally Posted by matt602 View Post
I'll reluctantly admit that they've done a lot more for public transit than I thought they would. Probably about the only thing I'd give them credit for.
Getting the federal government to pay for half of the LRT was impressive. Playing the long game with the cancellation haha.
Reply With Quote
     
     
  #1352  
Old Posted Oct 6, 2022, 3:55 PM
Innsertnamehere's Avatar
Innsertnamehere Innsertnamehere is offline
Registered User
 
Join Date: Jan 2010
Location: Hamilton
Posts: 12,902
I mean they have been great for infrastructure province wide but in Hamilton, I'd say it's been pretty negative.

Had the Liberals won in 2018, Confederation GO would likely be open already and the LRT would have been under construction. Ford played games with both, and honestly I wouldn't be surprised if it was some game to f**k with Horwath. Notice that Hamilton East-Stoney Creek finally elected a PC MPP and suddenly became a swing riding, and look at that, the long delayed GO station in the riding finally starts construction.

For the province as a whole however, Ford has increased infrastructure spending substantially above the level which the Liberals were operating at and the Toronto subway program is the most ambitious transit program on the continent. He's spending big, real money on transit at levels well above which the Liberals ever did. It just so happened that less of it is going to Hamilton.

And I'm saying that as someone who voted PC this year, partly because I suspected that ensuring Hamilton East-Stoney Creek getting a PC MPP would be good news for the city when the PCs were clearly going to be the winners.
Reply With Quote
     
     
  #1353  
Old Posted Oct 6, 2022, 4:10 PM
TheHonestMaple's Avatar
TheHonestMaple TheHonestMaple is offline
Registered User
 
Join Date: Aug 2016
Posts: 1,833
There really should also be a Gage GO Station for access to Tim Hortons Field as well. We saw last year with the Grey Cup, soccer game etc, that there is definitely a potential demand for that.
Reply With Quote
     
     
  #1354  
Old Posted Oct 6, 2022, 4:12 PM
Hawrylyshyn's Avatar
Hawrylyshyn Hawrylyshyn is offline
Registered User
 
Join Date: Mar 2015
Location: Ontario
Posts: 2,278
Quote:
Originally Posted by TheHonestMaple View Post
There really should also be a Gage GO Station for access to Tim Hortons Field as well. We saw last year with the Grey Cup, soccer game etc, that there is definitely a potential demand for that.
This is one of the main reasons the stadium should've been built at West Harbour
Reply With Quote
     
     
  #1355  
Old Posted Oct 6, 2022, 4:24 PM
TheRitsman TheRitsman is offline
Registered User
 
Join Date: Sep 2017
Location: Hamilton
Posts: 3,055
I personally think the station should be at Centre Mall. It has lots of room, they could get the developer to pay for the station as part of redevelopment of the property, and it would bring people, jobs and transit access to the north side of Ottawa St.
Reply With Quote
     
     
  #1356  
Old Posted Oct 6, 2022, 5:23 PM
Berklon's Avatar
Berklon Berklon is offline
Registered User
 
Join Date: Oct 2006
Location: Hamilton
Posts: 3,146
Quote:
Originally Posted by TheHonestMaple View Post
There really should also be a Gage GO Station for access to Tim Hortons Field as well. We saw last year with the Grey Cup, soccer game etc, that there is definitely a potential demand for that.
How much usage does THF get throughout the year though? I suspect it's empty the vast majority of time - so building a GO station just for those rare occasions where THF is used doesn't feel like a good usage of money.
Reply With Quote
     
     
  #1357  
Old Posted Oct 6, 2022, 6:27 PM
TheRitsman TheRitsman is offline
Registered User
 
Join Date: Sep 2017
Location: Hamilton
Posts: 3,055
Quote:
Originally Posted by Berklon View Post
How much usage does THF get throughout the year though? I suspect it's empty the vast majority of time - so building a GO station just for those rare occasions where THF is used doesn't feel like a good usage of money.
Hence why a Centre on Barton station makes more sense. It's only a 15 minute walk, which is totally reasonable, and Centre on Barton makes more sense for an every day location.
Reply With Quote
     
     
  #1358  
Old Posted Oct 6, 2022, 8:27 PM
ShavedParmesanCheese's Avatar
ShavedParmesanCheese ShavedParmesanCheese is offline
Registered User
 
Join Date: Oct 2020
Location: Ontario
Posts: 369
Quote:
Originally Posted by Innsertnamehere View Post
And I'm saying that as someone who voted PC this year, partly because I suspected that ensuring Hamilton East-Stoney Creek getting a PC MPP would be good news for the city when the PCs were clearly going to be the winners.
Sidebar, what a 4D Chess move. I would never have thought about doing that.
Reply With Quote
     
     
  #1359  
Old Posted Oct 6, 2022, 8:28 PM
ShavedParmesanCheese's Avatar
ShavedParmesanCheese ShavedParmesanCheese is offline
Registered User
 
Join Date: Oct 2020
Location: Ontario
Posts: 369
Quote:
Originally Posted by TheRitsman View Post
Hence why a Centre on Barton station makes more sense. It's only a 15 minute walk, which is totally reasonable, and Centre on Barton makes more sense for an every day location.
That's what I've been saying! Plus it would best serve the existing year-round amenities on Ottawa Street, not to mention the number of festivals they host throughout the year.
Reply With Quote
     
     
  #1360  
Old Posted Oct 6, 2022, 8:40 PM
ScreamingViking's Avatar
ScreamingViking ScreamingViking is offline
Ham-burgher
 
Join Date: Jun 2013
Location: Hamilton
Posts: 7,509
Ottawa St. and Gage are only 800m or so apart. Put the station on the west side of Ottawa, and add a 500m fenced path on the west end of the platform leading to Gage. I'm not sure what kind of room there is along the right of way, but it needn't be a fancy station... just a platform or two with some e-ticket machines would probably suffice.

Demand at THF would be largely limited to the Ticat and Forge FC games, plus the odd concert or event. Not a lot, but growth and change in those neighbourhoods may feed and benefit from GO service.

And the Centre is begging for decent residential...
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Hamilton > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 11:25 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.