Quote:
Originally Posted by mikevbar1
I agree, GO Centre is beautiful and is deserving of being a central station. However, CP really bottlenecked its use with their tunnel (perhaps by design?) and there isn't really a clear way to fix it without a full rebuild, which is a lot more than Mx or the city wants to cough up. To gain access to the east side is a non-starter unless we reactivate rail on the beachfront, which while a great idea is also too expensive to consider right now.
GO has been underinvested in now for decades. With DB at the helm, the core GO network will be a true S-Bahn, full stop. It can, and will, easily absorb a significant amount of demand both from new park-n-ride commuters and ideally existing transit users. Much of the GTHA is at a density that high-quality buses feeding into strong rail connections will work pretty well, effectively becoming the TTC on steroids. It is going to be transformational, and I always feel a bit jealous that no one has put up capital to extend electrification just a little bit to West Harbour, but I digress. We are positioned at the axiom of the GO line with the most compelling trips outside of Union, so I think we are going to be OK.
|
CP was gracious but only to a point.

Freight use is what holds up the idea of electrification around the bay into Hamilton. Metrolinx added that extra track to service West Harbour and beyond, but for diesels. Freight use is also the reason why GO has to contend with low platforms (even on the track it now owns). This country's rail priorities place people below containers and tanker cars, and that's not likely to change any time soon unless the passenger carriers do their own thing.
I seem to recall that CN requires Metrolinx to build its own grade separations for junctions that serve West Harbour and GO Centre, if electrification is to happen. $$$$$$$$