Originally Posted by ponyboycurtis
I would love to know what the deal with this tarp is. This photo is a few days old and I'm almost positive when I went by yesterday the tarps extended all the way down.
Any ideas on what they could need this for?
Also.. if anyone is wondering why the southern extension is delayed by a year it's because nobody works here. Granted there is the lower interior section I can't see but I have seen at a maximum 2 or 3 people at a given time. No trucks or activity in the yard etc.
It would have been nice if they staged the work in such a way that we could have had Greenboro to Bayview service by now and the rest of the work south of that to follow.
By the time this project goes live that will probably be 95% of your catchment anyways aside from park and ride and South Keys station itself.
Poor planning if you ask me. Sucks to be a foreign Carlton student who booked housing based on a school brochure.
|
I know some of the phasing is based on crew planning (i.e. siloed specialized crews work on portions of the line at a time.
And maybe I've just answered my following critical observation:
I've noticed alllll around town lately, these large, linear construction sites are opened up all at once along the entire length (see: 417 expansion, o-train line expansions)
Disruptive closures begin, and then demo, or partial demo is performed (exploration, likely) and then the site sits, empty, with nothing going on but the disruptive closure, for literally years.
Every time I drive by the stretch around the Kent exit (eastbound) on the 417 I flinch at the partially dismantled sheet metal wall with partially loosened pieces that looks like it could blow onto the highway at any moment. These pieces were loosened around this time last year, and remain partially dismantled, and a lane of the Kent Exit STILL closed, with no more work occurring there for an entire year. Try doing this to a local street in the Market.
Likewise for the sections of lane closed before and adjacent to Parkdale, with no work occurring for the past 12 months.
Every time I enter the highway and have to merge, westbound, only to have that lane open up again, with no apparent work inbetween, I flinch.
I also really feel for the people living along the open pit construction on Richmond Road. The trench was trenched about 16 months ago? With disruptive road realignments, steel plates, really poor pedestrian links, etc.
Could these jobs ALL have occurred in shorter sections, blasting away until substantially complete, before moving on to the next and leaving their local occupants in peace?
But alas, I seem to have answered my own question. Opening giant pits and closing highways 10km long is more efficient somehow, even if work is occurring on 10% of the area at once.