Quote:
Originally Posted by OTownandDown
Pretty sure all would have been forgiven with a face-mounted balcony railing. Which might be why these are finished in this condition (i.e. finishers/spec writer expected the slab edges to be covered, distracting from the undersides.) OR perhaps a lick of paint will go a long way.
Also, aren't leaking holes thru a new balcony probably a suspect kind of uh-oh thing?
|
That concrete is definitely lapping up any moisture/rainfall. I wonder if some type of epoxy coating on the topside would mitigate this. Seems like there is an abundance of moisture in those slabs compared to other buildings? If so that would introduce premature spalling and balcony remediation.
Can you imagine the balcony redo on this building?
I recall the super tall/wide brown brick building at Bathgate and Montreal took like 2 or 3 years to redo their balconies. Even the low rises on Carling across from Lincoln Fields are taking an entire construction season and that's as basic as it gets.
I can see it now... in 25 years... "due to cost considerations, the balconies will be redone in a undulating rectangular shape"