Crane assembly 7/10/22

They placed the motor and the 1st half of the working jib yesterday. Today they lifted the trolley and are now placing the rest of the working jib. After this it's just counterweights left to lift.

Counterweights and all major pieces are in place. They are working on threading the lift cable now.

Looks like they are preparing to take apart the large assembly crane. 6 empty flatbeds lined up for the pieces.

12:30 - Trolley cable operational. Lifting cable end attached. Tackle released from trolley.

We see to have an operational tower crane at this point.

Last edited by 360_Ray; Jul 10, 2022 at 5:31 PM.
Reply With Quote
     
     
  #1682  
Old Posted Jul 10, 2022, 5:11 PM
hookem hookem is offline
Registered User
 
Join Date: Apr 2007
Posts: 1,565
Is it just me, or does it seem odd to have such a tall building with no subterranean levels at all? There was barely any excavation at all. Maybe I’ve just been skewed by all the recent buildings that have underground levels.
Reply With Quote
     
     
  #1683  
Old Posted Jul 10, 2022, 6:26 PM
Billy Cannon Billy Cannon is offline
Registered User
 
Join Date: Mar 2019
Posts: 73
Quote:
Originally Posted by hookem View Post
Is it just me, or does it seem odd to have such a tall building with no subterranean levels at all? There was barely any excavation at all. Maybe I’ve just been skewed by all the recent buildings that have underground levels.

Excavation is expensive plus when you have this big of a lot it may just make sense to go up instead of down
Reply With Quote
     
     
  #1684  
Old Posted Jul 10, 2022, 11:16 PM
360_Ray 360_Ray is offline
Registered User
 
Join Date: Apr 2022
Location: Austin
Posts: 145
Living Room Crane View



How many can you spot?
Reply With Quote
     
     
  #1685  
Old Posted Jul 11, 2022, 12:10 AM
JoninATX JoninATX is online now
Registered User
 
Join Date: Aug 2009
Location: The ATX
Posts: 3,374
Quote:
Originally Posted by 360_Ray View Post


How many can you spot?
Very nice! Hey can you take a picture from that same spot in a week time when they start erecting the crane(s) for 321 West?
Reply With Quote
     
     
  #1686  
Old Posted Jul 11, 2022, 1:32 AM
bobbywest87 bobbywest87 is offline
Registered User
 
Join Date: Apr 2022
Posts: 597
Quote:
Originally Posted by 360_Ray View Post


How many can you spot?
I see cranes for The Republic, 6xG, the 2nd Hanover triplet, and 415 Colorado. Should be able to see 321 w 6th from that angle soon enough.
Reply With Quote
     
     
  #1687  
Old Posted Jul 12, 2022, 1:53 AM
360_Ray 360_Ray is offline
Registered User
 
Join Date: Apr 2022
Location: Austin
Posts: 145
Core Excavation 7/11/22

Piles continue to be drilled on outer edges by Guadalupe and San Antonio. Large backhoe excavated deeper on east side of the central core pit. Surveyor came out early and marked what ended up being piles that they had drilled and filled weeks ago. These were the piles with the closed end rebar at the top. You can see the results of the excavation below. You'll notice concrete was not poured to the top on some of these. Will be interesting to see how these piles get tied in with the structure.

Reply With Quote
     
     
  #1688  
Old Posted Jul 12, 2022, 7:29 PM
360_Ray 360_Ray is offline
Registered User
 
Join Date: Apr 2022
Location: Austin
Posts: 145
More Pilings, More Concrete, More Excavation - 7/12/22

Reply With Quote
     
     
  #1689  
Old Posted Jul 12, 2022, 7:52 PM
bobbywest87 bobbywest87 is offline
Registered User
 
Join Date: Apr 2022
Posts: 597
Nice overhead view of the site from the "Curlee Capital" youtube video just posted on the 6XG page.


Video Link


Reply With Quote
     
     
  #1690  
Old Posted Jul 13, 2022, 7:49 PM
Sigaven Sigaven is offline
Registered User
 
Join Date: Jan 2010
Posts: 1,571
that state parking garage can't go soon enough!
Reply With Quote
     
     
  #1691  
Old Posted Jul 14, 2022, 2:08 PM
360_Ray 360_Ray is offline
Registered User
 
Join Date: Apr 2022
Location: Austin
Posts: 145
The pile drillers have migrated to the northern edge of the building outline on both the San Antonio and Guadalupe street edges. I'm hoping that means they are done with piles in the center and southern sections, but who knows.

They hauled off about half of the hazmat spoil from the Crane 2 excavation, but no other work in that hole. Does someone know the dates for Crane 2 install?

Large backhoe continues to slowly expand the central core pit for the elevator mechanical space I assume.

They cleared out the NE corner of the lot and half of a 40' double wide mobile office just arrived.

Last edited by 360_Ray; Jul 14, 2022 at 2:47 PM. Reason: Office arrival
Reply With Quote
     
     
  #1692  
Old Posted Jul 14, 2022, 7:18 PM
Billy Cannon Billy Cannon is offline
Registered User
 
Join Date: Mar 2019
Posts: 73
Thanks and loving all the updates.

What you see being installed are piers not piles. Similar but different.

The large excavation you see for the elevator core will be a huge pier cap that ties all the piers together and on top of the pier cap the elevator core walls will rise to the top of the building

Keep up the updates! Myself and a lot of other lurkers on this site really appreciate it




Quote:
Originally Posted by 360_Ray View Post
The pile drillers have migrated to the northern edge of the building outline on both the San Antonio and Guadalupe street edges. I'm hoping that means they are done with piles in the center and southern sections, but who knows.

They hauled off about half of the hazmat spoil from the Crane 2 excavation, but no other work in that hole. Does someone know the dates for Crane 2 install?

Large backhoe continues to slowly expand the central core pit for the elevator mechanical space I assume.

They cleared out the NE corner of the lot and half of a 40' double wide mobile office just arrived.
Reply With Quote
     
     
  #1693  
Old Posted Jul 14, 2022, 10:05 PM
360_Ray 360_Ray is offline
Registered User
 
Join Date: Apr 2022
Location: Austin
Posts: 145
Construction Office / Crane 3?

The construction office is 4 trailer wide block in the NE corner.

All Crane 2 ? pad hazmat spoil has been removed.

They dug what looks like may be the Crane 3 pad in the SW corner of the lot (pic below)

Reply With Quote
     
     
  #1694  
Old Posted Jul 15, 2022, 3:38 AM
360_Ray 360_Ray is offline
Registered User
 
Join Date: Apr 2022
Location: Austin
Posts: 145
7/14/22

Reply With Quote
     
     
  #1695  
Old Posted Jul 15, 2022, 4:26 AM
bobbywest87 bobbywest87 is offline
Registered User
 
Join Date: Apr 2022
Posts: 597
They’re really digging down deep for the elevator core.
Reply With Quote
     
     
  #1696  
Old Posted Jul 15, 2022, 3:34 PM
Armybrat Armybrat is online now
Registered User
 
Join Date: Aug 2010
Posts: 772
Wine cellar?
Reply With Quote
     
     
  #1697  
Old Posted Jul 15, 2022, 8:01 PM
360_Ray 360_Ray is offline
Registered User
 
Join Date: Apr 2022
Location: Austin
Posts: 145
What I though was going to be Crane 2 pad where they dug out the hazmat fill has been filled with concrete and now covered with dirt.

Excavation and haul-off continues on central core.

A few more piers drilled and filled on western edge.

Some work painting on office. Looks like they are getting ready to construct wooden access to it.
Reply With Quote
     
     
  #1698  
Old Posted Jul 15, 2022, 8:03 PM
360_Ray 360_Ray is offline
Registered User
 
Join Date: Apr 2022
Location: Austin
Posts: 145
Quote:
Originally Posted by Billy Cannon View Post
What you see being installed are piers not piles. Similar but different.

The large excavation you see for the elevator core will be a huge pier cap that ties all the piers together and on top of the pier cap the elevator core walls will rise to the top of the building
Thanks for the correction and insight into what they are doing! Much appreciated.
Reply With Quote
     
     
  #1699  
Old Posted Jul 19, 2022, 12:49 AM
360_Ray 360_Ray is offline
Registered User
 
Join Date: Apr 2022
Location: Austin
Posts: 145
7/17/22

Piers on center edge of San Antonio drilled and filled. Both machines now working on Guadalupe side. More excavation in central core. You can see more piers with the closed end rebar exposed.

Reply With Quote
     
     
  #1700  
Old Posted Jul 19, 2022, 1:03 PM
WestAustinite's Avatar
WestAustinite WestAustinite is offline
Old West Austin
 
Join Date: Jan 2007
Location: Austin
Posts: 248
I have always wondered how they place piers so precisely on these high rise projects. Is this done with ultra precise GPS? Lasers? Good old fashioned surveying tools?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin
Forum Jump



Forum Jump


All times are GMT. The time now is 11:09 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.