Quote:
Originally Posted by acottawa
I think the logic was based on the assumptions in my last post. If HFR is 3B and HSR is 20B it is a no brainer. If HFR is 12B I am not sure the logic holds up.
|
But context matters. The last TOM HSR estimate corrected for inflation it's at least $15B today. The Alghabra HFR proposal was supposedly in the $10-12B range for two lines, a bypass and service till Québec City. That's easily a $20B HSR proposal.
I get the temptation to say, "Why bother with HFR then?". To that I'd argue, just look at history. We don't have the ability to do anything ambitious in this country anymore. And given the stream of failures on HSR proposals, why not stick to a proposal that might actually be within the realm of achievable?
Also, there's this weird idea in Canada with infrastructure that it's all a binary zero sum game. That is not how intercity rail development should be done. Build a base. Then build extensions and increase capacity as needed. Getting the corridor now for HFR with discretionary additional investments going towards straightening and bypasses of problematic areas, instead of electrification and grade separation, provides bones to build on. Build HFR now. And it can be upgraded to electrified grade separated HSR over the next decade or two, one segment at a time, as justified by demand and as allowed for with funding.