  #1221  
Old Posted May 3, 2022, 8:16 PM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 1,071
Quote:
Originally Posted by rrskylar View Post
So doesn't there still being a weak link negate all the benefit's of raising it!?
Your comment is analogous to this: starting to patch a cracked basement foundation, it starts raining partway through the project and then water gets into your basement, and saying there was no point in starting the project.

The province has been slowly building it up since the 97 Flood. This isn't done overnight lol.

Our lovely PC government actually took the cheap way out as usual a few years ago, and opted for a roundabout route instead of raising a section near Morris, which you're griping about right now. So vote them out next election if you want to do anything about this.

https://www.cbc.ca/news/canada/manitoba/highway-75-detour-spring-flooding-1.5596553
Reply With Quote
     
     
  #1222  
Old Posted May 3, 2022, 8:23 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,371
Not sure if this was completed or is still the plan.

https://www.gov.mb.ca/mit/pth75/index.html

But they plan on using PR 246 as a detour instead of doing significant raising north of Morris. Including the birdge.

Edit: Ah I see Wildcake shared a news article explaining it. Yes they took the cheap route. Cons cheeped out on proper solutions so they could give you phony tax breaks and phony hospital consolidations benefits. Now that section of hwy is screwed for flooding since the repaved it for $40 million.. Smooth hwy though.
Reply With Quote
     
     
  #1223  
Old Posted May 3, 2022, 8:30 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
They should do it right and build a bypass around the west side of town which will minimize the awkward jogs and intersections, and will accommodate future growth in the town. It shouldn't be that hard, it would in all likelihood be less than 10 km with only one bridge over the Morris River, and if you want to get extra fancy a railway overpass. Not exactly some epic undertaking.
Reply With Quote
     
     
  #1224  
Old Posted May 3, 2022, 8:34 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,371
https://www.apegm.mb.ca/pdf/PD_Papers/PTH75FloodProtection.pdf

interesting slide show from 2011. Overall tones, everything is costly lol

Going west would be about 5.5 miles and still has jogs and such. Either way, sounds like it's not happening anytime soon.
Reply With Quote
     
     
  #1225  
Old Posted May 3, 2022, 8:59 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
It makes you wonder how on earth they ever managed to get the Portage Bypass built in the 60s...
Reply With Quote
     
     
  #1226  
Old Posted May 3, 2022, 9:37 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,371
Nearly perfect. Missed it by that much. In the 60's. Today it would be fully at grade.
Reply With Quote
     
     
  #1227  
Old Posted May 3, 2022, 11:40 PM
VANRIDERFAN's Avatar
VANRIDERFAN VANRIDERFAN is offline
Registered User
 
Join Date: Jan 2007
Location: Regina
Posts: 5,487
Quote:
Originally Posted by esquire View Post
It makes you wonder how on earth they ever managed to get the Portage Bypass built in the 60s...
Portage By-pass, Portage Diversion, Shellmouth Dam, and Duffs Ditch. Much more visionary back then?

• Video Link
Reply With Quote
     
     
  #1228  
Old Posted May 3, 2022, 11:49 PM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 1,071
Quote:
Originally Posted by bomberjet View Post
https://www.apegm.mb.ca/pdf/PD_Papers/PTH75FloodProtection.pdf

interesting slide show from 2011. Overall tones, everything is costly lol

Going west would be about 5.5 miles and still has jogs and such. Either way, sounds like it's not happening anytime soon.
Also interesting to see their explanation for what level of flood to protect against. Long story short is that anything worse than 2009 levels (approx. what we're about to get with this year's flood) would close I29 and the Emerson border crossing so there's no point in spending extra millions to make it better than that. Just accept the detour at that point. Crazy to think they closed I29 to small vehicles but still let trucks drive through a highway covered in flood water in 2009.
Reply With Quote
     
     
  #1229  
Old Posted May 4, 2022, 12:48 AM
thewave46 thewave46 is offline
Closed account
 
Join Date: Aug 2013
Posts: 3,530
Quote:
Originally Posted by VANRIDERFAN View Post
Portage By-pass, Portage Diversion, Shellmouth Dam, and Duffs Ditch. Much more visionary back then?

• Video Link
Some thoughts:

1. Oh, that music. Just fantastic.
2. Designed using computers. Computers! The future.
3. In terms of dollars spent to dollars saved from damage? Probably one of the best values spent in Canada ever.
4. Manitoba used to have a lot of large scale, but very practical vision. The flood control project and the massive hydro projects of the north come to mind. Forward thinking visions that will continue to pay off decades into the future. Not too shabby for a province of a million people.
5. It is a shame healthcare is such a money — today. Healthcare is great and all, but damn, doesn’t it just eat money like a black hole. One wonders how much better infrastructure could be without healthcare gobbling it all up.
Reply With Quote
     
     
  #1230  
Old Posted May 4, 2022, 5:32 PM
BuildUpWpg BuildUpWpg is offline
Registered User
 
Join Date: Nov 2014
Posts: 470
[QUOTE=VANRIDERFAN;9615737]Portage By-pass, Portage Diversion, Shellmouth Dam, and Duffs Ditch. Much more visionary back then?

Wow, at 14:22 you can see how they diverted the Red River around the control structure as it was being built.
Reply With Quote
     
     
  #1231  
Old Posted May 4, 2022, 6:00 PM
Dengler Avenue's Avatar
Dengler Avenue Dengler Avenue is offline
Road Engineer Wannabe
 
Join Date: Sep 2017
Location: Côté Ouest de la Rivière des Outaouais
Posts: 8,683
Quote:
5. It is a shame healthcare is such a money — today. Healthcare is great and all, but damn, doesn’t it just eat money like a black hole. One wonders how much better infrastructure could be without healthcare gobbling it all up.
Very true.
Let’s just see what can be done with what little money there is, be it Manitoba, Northwestern Ontario, or Northeastern Ontario.
Reply With Quote
     
     
  #1232  
Old Posted May 4, 2022, 7:08 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,371
That video is amazing! Especially the tunes. Thanks for sharing.
Reply With Quote
     
     
  #1233  
Old Posted May 4, 2022, 7:39 PM
Wpgstvsouth94 Wpgstvsouth94 is online now
Registered User
 
Join Date: Aug 2020
Posts: 445
I just passed through deacons corner. All signage and workers are present on #1 here. With all this new investment in road construction why isn’t the province switching to an interchange here. A simple diamond will suffice.
Reply With Quote
     
     
  #1234  
Old Posted May 4, 2022, 7:42 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,371
Because the Province refuses to get money from Trudeau out of spite.
Reply With Quote
     
     
  #1235  
Old Posted May 4, 2022, 8:03 PM
optimusREIM's Avatar
optimusREIM optimusREIM is offline
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 3,284
Quote:
Originally Posted by bomberjet View Post
Because the Province refuses to get money from Trudeau out of spite.
Yeah it’s too bad we can’t figure that part out. That said, I’m sure it would come with some strings attached so I can sort of understand the rationale politically speaking
Reply With Quote
     
     
  #1236  
Old Posted May 4, 2022, 8:54 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,371
Need to match contributions or something like that. Pretty standard stuff. St. Mary's for example is being funding solely by the Province from my understanding.
Reply With Quote
     
     
  #1237  
Old Posted May 4, 2022, 8:57 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by bomberjet View Post
Because the Province refuses to get money from Trudeau out of spite.
Refuse federal infrastructure dollars for your own province to own the libs
Reply With Quote
     
     
  #1238  
Old Posted May 4, 2022, 10:36 PM
Highwayman Highwayman is offline
Registered User
 
Join Date: Apr 2021
Location: Winnipeg
Posts: 311
Quote:
Originally Posted by esquire View Post
They should do it right and build a bypass around the west side of town which will minimize the awkward jogs and intersections, and will accommodate future growth in the town. It shouldn't be that hard, it would in all likelihood be less than 10 km with only one bridge over the Morris River, and if you want to get extra fancy a railway overpass. Not exactly some epic undertaking.
So you are saying that having to cross the main line TWICE is going to improve 75? Trains slow down when they roll into Morris. So the train crossings X 2 would be even worse for traffic. We both know they would NOT build to overpasses for the rail line. So it would be at grade crossings. Something we do not need.
Reply With Quote
     
     
  #1239  
Old Posted May 5, 2022, 1:44 AM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,371
It's a secondary main. The real mainlines run east-west through Winnipeg. That's why I like the east side better. They'd have to make an awkward crossing of the track right next to 75 though. They actually just straightened out the highway south of Morris, moving it closer to the track.
Reply With Quote
     
     
  #1240  
Old Posted May 5, 2022, 1:49 AM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,371
I wonder how the birdge construction site is doing at 59N over floodway. I assume they had pre defined timelines for construction during spring. Ie: No major works during flood season.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 12:19 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.