As someone who has unfortunately spent way too much time in hospitals, I’m excited for your health care practitioners and patients that they’ll have a new facility that should be very efficient.
__________________
Proud member of the American Association of Attention Deficit Diso...hey look, Crayons!
Reply With Quote
     
     
  #802  
Old Posted Apr 10, 2022, 10:03 PM
zahav zahav is offline
Registered User
 
Join Date: Apr 2009
Location: Vancouver
Posts: 2,052
Exactly ^^ Hospitals are inherently melancholy except for the maternity ward. Everything is is because something is wrong and people need medical care. So they will never be great places, but a nice modern facility with good equipment, combined with the already world renowned quality of care at St. Paul's, this will be a big improvement.
Reply With Quote
     
     
  #803  
Old Posted Apr 13, 2022, 6:21 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,753
2nd crane got installed yesterday.

https://www.youtube.com/watch?v=SkMNOs2JM_I
Reply With Quote
     
     
  #804  
Old Posted Apr 22, 2022, 3:57 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Weird the Fire Department Technical Rescue or Hazmat team seems to been at the site the past two days doing something in a trench. Like 4-5 trucks and two engines.

https://www.youtube.com/channel/UCNDVyL_iDsXuZmm_dxllkbQ
Reply With Quote
     
     
  #805  
Old Posted Apr 22, 2022, 4:34 PM
L00per L00per is offline
Registered User
 
Join Date: May 2019
Posts: 15
Quote:
Originally Posted by jollyburger View Post
Weird the Fire Department Technical Rescue or Hazmat team seems to been at the site the past two days doing something in a trench. Like 4-5 trucks and two engines.

https://www.youtube.com/channel/UCNDVyL_iDsXuZmm_dxllkbQ
Likely training. They'll often work with construction companies to get access to trenches, cranes, etc. to make training more realistic.
Reply With Quote
     
     
  #806  
Old Posted Apr 22, 2022, 5:29 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Quote:
Originally Posted by L00per View Post
Likely training. They'll often work with construction companies to get access to trenches, cranes, etc. to make training more realistic.
Thanks! Their training center is nearby at 1330 Chess Street as well.

Training at BC Place in 2019

https://www.bcplace.com/blog/2019-08-21/...responders-for-technical-rescue-training
Reply With Quote
     
     
  #807  
Old Posted Apr 28, 2022, 1:40 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,753
They finished the training and filled the trench with dirt
Reply With Quote
     
     
  #808  
Old Posted May 5, 2022, 1:15 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Seems like the third tower crane could go in soon.
Reply With Quote
     
     
  #809  
Old Posted May 29, 2022, 2:59 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,753
No third crane yet but they seem to have been digging in that corner to pour some concrete.
Reply With Quote
     
     
  #810  
Old Posted Jun 16, 2022, 5:37 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Reply With Quote
     
     
  #811  
Old Posted Jun 29, 2022, 6:22 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Lots of concrete trucks on the site today, back to work
Reply With Quote
     
     
  #812  
Old Posted Jun 30, 2022, 6:37 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,158
Truck strike over and cement production back on line at Lafarge so the concrete shortage should be easing over the next few weeks.
Reply With Quote
     
     
  #813  
Old Posted Jul 14, 2022, 8:21 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,753
It seems like they'll finish digging out the pit in a week or two.
Reply With Quote
     
     
  #814  
Old Posted Aug 4, 2022, 10:44 AM
CCRC CCRC is offline
Registered User
 
Join Date: Dec 2021
Posts: 92
Tower Crane the fourth is born
Reply With Quote
     
     
  #815  
Old Posted Aug 5, 2022, 1:10 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Quote:
Originally Posted by CCRC View Post
Tower Crane the fourth is born
4K of the crane going up

Video Link
Reply With Quote
     
     
  #816  
Old Posted Aug 28, 2022, 9:08 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,753




Nothing that interesting. They did lay some asphalt for a new road on the site near the staging area for forming etc so maybe we'll see the fifth crane go up soon.

Quote:
The construction site at Station Street is buzzing!

Concrete is being poured everyday – for slabs, walls, and columns.
Excavation is nearly complete.
All four cranes have been erected.
Civil work is ongoing as piping for utilities is being installed.
Earlier this year, BC’s largest concrete pour ever (for a vertical project) happened at Station Street. With the help of 516 concrete trucks, 4,600m3 worth of concrete (or a volume of about half a million soccer balls) was continuously poured for 12+ hours into the foundation of the new St. Paul’s Hospital.

This large seismic footing will help the building resist damage from future earthquakes.
PCL Construction is pouring floors and pillars for each level of the hospital, starting with the 4-level underground parkade. By the end of the year, you might even see the main floor of the new hospital peek out from the ground.
https://thenewstpauls.ca/new-st-pauls-hospital-update/
Reply With Quote
     
     
  #817  
Old Posted Aug 29, 2022, 5:58 PM
LeftCoaster's Avatar
LeftCoaster LeftCoaster is offline
Moderator
 
Join Date: Nov 2005
Location: Toroncouver
Posts: 13,158
The update says "All four cranes have been erected" so i suspect that is all we will see for this phase.
Reply With Quote
     
     
  #818  
Old Posted Aug 29, 2022, 6:09 PM
giallo's Avatar
giallo giallo is online now
be nice to the crackheads
 
Join Date: Apr 2002
Location: Vancouver
Posts: 12,739
There are definitely four cranes erected now. The site is looking busy.
Reply With Quote
     
     
  #819  
Old Posted Aug 29, 2022, 9:27 PM
hollywoodnorth's Avatar
hollywoodnorth hollywoodnorth is offline
Registered User
 
Join Date: Oct 2001
Location: Downtown Vancouver
Posts: 6,394


looks like that asphalt on the bottom there that allows site access from Station and National street will also be used keep National open when the current sewer/water construction goes into the next phase on Station. hard to explain but you will see the National street flow shift over and cut through that corner of the site for a month or two while they finish the sewer connection there. hard to properly explain but when you are in the area you will see how it all lines up. smart solution to keeping National open. even now you see they have rerouted Westbound National between Station and Main for the current phase of sewer/water work....I am just happy they kept it open.

this shows more or the view also >> https://www.youtube.com/watch?v=eG5GdEh7GVs
__________________
Quote of the Decade on SSP: "what happens would it be?" - argon007

"orange vested guy" - towerguy3
Reply With Quote
     
     
  #820  
Old Posted Aug 29, 2022, 10:14 PM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,753
Quote:
Originally Posted by hollywoodnorth View Post
looks like that asphalt on the bottom there that allows site access from Station and National street will also be used keep National open when the current sewer/water construction goes into the next phase on Station. hard to explain but you will see the National street flow shift over and cut through that corner of the site for a month or two while they finish the sewer connection there. hard to properly explain but when you are in the area you will see how it all lines up. smart solution to keeping National open. even now you see they have rerouted Westbound National between Station and Main for the current phase of sewer/water work....I am just happy they kept it open.

this shows more or the view also >> https://www.youtube.com/watch?v=eG5GdEh7GVs
Just noticed that National will curve instead of the current version which has the turn onto Station Street.

Quote:
National Avenue will be widened with a bike lane on either side and connect to a new road at the east side of the campus, which the City of Vancouver has named Nora Hendrix Way. Nora Hendrix Way will be a public north/ south road with bike lanes between Trillium Park and the hospital and will be the main entrance for ambulances and the Emergency Department. Nora Hendrix Way will connect to another new road (currently called Road A) that will be an extension of Dunlevy south of Prior Street. Station Street will remain unchanged. Gore Avenue will be extended south of Prior Street and become the main road for most motorists driving onto the new health campus. All of the intersections along Prior Street will have full traffic signals.
https://thenewstpauls.ca/faq/
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Downtown & City of Vancouver
Forum Jump



Forum Jump


All times are GMT. The time now is 6:17 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.